Data-Based Predictive Controller for a Coordinate Control System in Power Plants

Author(s):  
Jianhua Zhang ◽  
Fei Dong ◽  
Yunze Wang ◽  
Guolian Hou
Complexity ◽  
2019 ◽  
Vol 2019 ◽  
pp. 1-8
Author(s):  
Lei Yu

In this paper, a new type of superheated steam temperature switching control system for thermal power plants is presented. A single neuron adaptive PSD (Proportional Sum Differential) predictive controller is designed. The DCS (Distributed Control System) control system platform is used for configuration design. At the same time, the feedforward compensation technology and anti-integration saturation technology are employed to improve the characteristics of large hysteresis and multi-interference in the superheated steam temperature system. Undisturbed switching performance can be well obtained between the new controller and its own PID controller. This proposed method has been well applied in a thermal power plant (600MW) and achieved better control quality.


Author(s):  
В. В. Руденко ◽  
И. В. Калужинов ◽  
Н. А. Андрущенко

The presence in operation of many prototypes of UAVs with propeller propellers, the use of such devices at relatively low altitudes and flight speeds makes the problem of noise reduction from UAVs urgent both from the point of view of acoustic imperceptibility and ecology.The aim of the work is to determine a set of methods that help to reduce the visibility of UAVs in the acoustic range. It is shown that the main source of noise from the UAV on the ground is the power plant, which includes the engine and the propeller. The parameters of the power plants influencing the processes that determine the acoustic signature of the UAV were investigated. A comprehensive analysis of the factors affecting visibility was carried out. The power plants include two-stroke and four-stroke engines, internal combustion and two-blade propellers. The use of silencers on the exhaust of the internal combustion engine was considered. The spectral characteristics of the acoustic fields of the propeller-driven power plants for the operating sample of the UAV "Eco" were obtained. The measurements were carried out in one-third octave and 1/48 octave frequency bands under static conditions. The venue is the KhAI airfield. Note that the propellers that were part of the power plants operated at Reynolds numbers (Re0,75<2*105), which can significantly affect its aerodynamic and acoustic characteristics. It is shown that when choosing a UAV control system, one should take into account the fact that two-stroke piston engines are the dominant source in the noise of propeller-driven control systems in the absence of a hood and mufflers in the intake and exhaust tracts. The use of a four-stroke internal combustion engine significantly reduces the noise of the control system. In the general case, the position of the boundaries of the zone of acoustic visibility of a UAV at the location of the observer is determined by the ratio between the intensity of acoustic radiation perceived by the observer from the UAV and the intensity of sound corresponding to the natural acoustic background and depends on the degree of manifestation of acoustic effects accompanying the propagation of sound in a turbulent atmosphere - the refraction of sound waves. Absorption and dissipation of acoustic energy. The calculation and comparison of the UAV detection range was carried out taking into account the existing natural maskers.The results of experimental studies are presented that allow assessing the degree of acoustic signature of the UAV. A set of measures aimed at reducing the intensity of the acoustic signature of the UAV in various regions of the radiation spectrum has been determined.


2020 ◽  
Vol 38 (8A) ◽  
pp. 1187-1199
Author(s):  
Qaed M. Ali ◽  
Mohammed M. Ezzalden

BLDC motors are characterized by electronic commutation, which is performed by using an electric three-phase inverter. The direct control system of the BLDC motor consists of double loops; including the inner-loop for current regulating and outer-loop for speed control. The operation of the current controller requires feedback of motor currents; the conventional current controller uses two current sensors on the ac side of the inverter to measure the currents of two phases, while the third current would be accordingly calculated. These two sensors should have the same characteristics, to achieve balanced current measurements. It should be noted that the sensitivity of these sensors changes with time. In the case of one sensor fails, both of them must be replaced. To overcome this problem, it is preferable to use one sensor instead of two. The proposed control system is based on a deadbeat predictive controller, which is used to regulate the DC current of the BLDC motor. Such a controller can be considered as digital controller mode, which has fast response, high precision and can be easily implemented with microprocessor. The proposed control system has been simulated using Matlab software, and the system is tested at a different operating condition such as low speed and high speed.


2013 ◽  
Vol 842 ◽  
pp. 541-545
Author(s):  
Yun Guo ◽  
Zhi Qiang Huang ◽  
Shun Xin Yang

Natural gas heaters are widely used in gas-fired power plants to meet the combustion needs and to improve the combustion efficiency. For the control features and technical requirements of the natural gas heater, the computer automatic control system for natural gas heater has been designed,and realizes the temperature and liquid level real time measurement and control. The system increases significantly the control accuracy of natural gas temperature, eliminates potential unsafety and improves production efficiency.


Author(s):  
R. L. Duncan ◽  
H. W. Brown

A data base system has been developed to analyze root causes of failures and unplanned outages in combined-cycle power plants and related equipments. Raw data in the form of plant work orders and outage reports are provided by thirteen utilities. Data encompasses both scheduled and unscheduled maintenance activities involving all plant equipments of mostly combined cycle installations. Primary objectives are to evaluate combined-cycle plant maintenance records to determine root causes of equipment failures, to analyze maintenance data to identify key areas for reliability, availability, and maintainability (RAM) improvement, and to develop an automated data processing system for feedback to project participants. ERAS (EPRI Reliability Assessment System) data were analyzed to determine failure rates and mean downtimes of critical equipment used in combined-cycle plants and integrated gasification combined-cycle plants of the future. A primary ERAS data requirement is to document plant equipment failures involving planned outages, unplanned outages, and noncurtailing maintenance. Maintenance data are mailed directly from the plant on a monthly or weekly basis. In order to maintain significant coordination and feedback, documentation is also mailed by ARINC Research to manufacturers and EPRI project personnel. ERAS is foremost a repository, based on dBASE II software, of raw data records which address combined-cycle plant equipment scheduled and unscheduled maintenance activity. By using dBASE II commands, data contained in “DAILY”, “MONTHLY”, “PROBLEMS”, and “FIREHRS” data base files (DBFs) are analyzed in many ways. Data may be separated by manufacturer or utility. RAM statistics may be analyzed according to six data hierarchies, grouping data by common plant design, system, subsystem, or components. Special report forms can be developed depending on specific data processing needs. During 1982 a total of 1744 maintenance records for the thirteen participating plants were processed. Seventy percent of the events were noncurtailing, of which 612 events involved component failures. The data base included 968 failure events to over 200 different combined-cycle plant components each described by a three digit code. Component repairs accounted for over 50 percent of these failures. Detailed descriptions of these failures identifying causes and failed piece parts can be listed by the computer from the “PROBLEMS” DBF using “FRM’s SYSCOMP” (failures grouped by components) or “SYSPLANT” (failures grouped by plant). It is concluded that work orders do provide insight into possible root cause and can assist engineering in followup failure investigations, although discussions with power plant personnel are often required for additional insight into root cause. The extent of successful root cause determination in the ERAS data base is difficult to quantify due to different root cause interpretations. However, project efforts have successfully identified the failed piece part in 86 percent of equipment failures. An analysis of plant reliability problems showed that failures of combustion turbine and heat recovery boiler panel controls and remote sensing equipment are the most frequent cause of combined-cycle plant unavailability. Each plant appears to have specific problem areas generic to these control system failures. Generic problems were observed in drum level set points, control valves, panel cards and timers, computers and data links, flame scanners, and thermo-couples. Many of the control related problems documented in ERAS records identify the failed part number of the control circuit affected. It is expected that these documented control system failures will begin to yield better insight into root cause as the number of records increase, and cause and effect relationships are established.


Author(s):  
K. I. Artsiomenka

The structural-parametric optimization of the automatic control system for power units (ACSPU) of 300 MW of Lukoml’skaya GRES (Lukoml Local Condensing Power Plant) in the mode of both the permanent and the variable superheated steam pressure upstream of the turbine is under consideration. During 1974–1979, eight units of the Lukoml’skaya GRES implemented the ACSPU with a leading boiler power control. At the moment, these systems no longer meet all the frequency control quality requirements. In 2016, the daily schedule of electric loads of the Belarusian power system was as follows: the basic part of the schedule of electric loads was covered by combined heat and power plants (CHP) and by mini-CHP (which are the least maneuverable of the power plants), the semi-peak part of it–by local condensing power plants (Lukoml’skaya GRES and Berezovskaya GRES), the peak part–by import electric energy from neighboring power systems. However, this year the first unit of the Belorussian NPP will be put into operation, while the second one–in 2020. After the launch of the Belorussian NPP, it will cover basic part of load curve; CPPs will cover the semi-peak part, while the peak part of load curve will be covered by local condensing power plants. Correspondingly, due to the alteration of the structure of daily schedule of electric loads of the Belarusian power system, it is necessary to improve the efficiency of power units of Lukoml’skaya GRES as well as of the entire Lukoml’skaya GRES in general. This can be achieved with the help of the method of parametric optimization of the typical ACSPU proposed in the present paper. As a result, the quality of control of power and pressure upstream of the turbine will be improved; the flow of fuel will be reduced, as well as the turbine regulation valve displacement; environmental performance of entire power plant will be improved, too. The proposed technique has been confirmed by the results of computer simulation of transient processes in the automatic control system under external and internal disturbances.


2021 ◽  
Vol 2113 (1) ◽  
pp. 012030
Author(s):  
Jing Li ◽  
Yanyang Liu ◽  
Xianguo Qing ◽  
Kai Xiao ◽  
Ying Zhang ◽  
...  

Abstract The nuclear reactor control system plays a crucial role in the operation of nuclear power plants. The coordinated control of power control and steam generator level control has become one of the most important control problems in these systems. In this paper, we propose a mathematical model of the coordinated control system, and then transform it into a reinforcement learning model and develop a deep reinforcement learning control algorithm so-called DDPG algorithm to solve the problem. Through simulation experiments, our proposed algorithm has shown an extremely remarkable control performance.


Models and mechanisms for the formation of soot and nitrogen oxides during the combustion of hydrocarbon fuels of power plants of vehicles have been developed. Models of numerical modeling and calculation of solid particles, nitrogen oxides and urea of diesel engines are formulated. The potential for the formation of a greenhouse effect is briefly described. The regularity of the relationship between nitrogen oxides and soot was revealed. A schematic diagram of the oxidizing neutralizer and particulate filter of modern diesel is given. The diagram of the urea supply system and the urea atomization module in the engine exhaust system is given. The scheme of the control system for catalytic neutralization of nitrogen oxides is given. A comparative assessment of nitric oxide reductants is given. An assessment of the technical and environmental effectiveness of the system for reducing the toxicity and smoke content of modern engines is given. Keywords greenhouse effect, smokiness, solid particles, urea, soot, diesel, acetylene, soot filter, catalytic Converter, nitrogen oxides, models for calculating soot and nitrogen oxides, urea supply module, control system


Author(s):  
A. Gad-Briggs ◽  
P. Pilidis ◽  
T. Nikolaidis

An important requirement for Generation IV Nuclear Power Plant (NPP) design is the control system, which enables part power operability. The choices of control system methods must ensure variation of load without severe drawbacks on cycle performance. The objective of this study is to assess the control of the NPP under part power operations. The cycles of interest are the simple cycle recuperated (SCR) and the intercooled cycle recuperated (ICR). Control strategies are proposed for NPPs but the focus is on the strategies that result in part power operation using the inventory control method. First, results explaining the performance and load limiting factors of the inventory control method are documented; subsequently, the transient part power performances are also documented. The load versus efficiency curves were also derived from varying the load to understand the efficiency penalties. This is carried out using a modeling and performance simulation tool designed for this study. Results show that the ICR takes ∼102% longer than the SCR to reduce the load to 50% in design point (DP) performance conditions for similar valve flows, which correlates with the volumetric increase for the ICR inventory tank. The efficiency penalties are comparable for both cycles at 50% part power, whereby a 22% drop in cycle efficiency was observed and indicates limiting time at very low part power. The analyses intend to aid the development of cycles for Generation IV NPPs specifically gas cooled fast reactors (GFRs) and very high-temperature reactors (VHTRs), where helium is the coolant.