Numerical Investigation of Key Factors on Successful Subsequent Parent Well Water Injection to Mitigate Parent-Infill Well Interference

Author(s):  
Ning Li ◽  
Kan Wu ◽  
John Killough
2016 ◽  
Vol 2016 ◽  
pp. 1-8
Author(s):  
JingBao Liu ◽  
ShengYao Jiang ◽  
Tao Ma ◽  
RiQiang Duan

A hot gas duct is an indispensable component for the nuclear-process heat applications of the Very-High-Temperature Reactor (VHTR), which has to fulfill three requirements: to withstand high temperature, high pressure, and large pressure transient. In this paper, numerical investigation of pressure transient is performed for a hot gas duct under rapid depressurization. System depressurization imposes an imploding pressure differential on the internal structural elements of a hot gas duct, the structural integrity of which is susceptible to being damaged. Pressure differential and its imposed duration, which are two key factors to evaluate the damage severity of a hot gas duct under depressurization, are examined in regard to depressurization rate and insulation packing tightness. It is revealed that depressurization rate is a decisive parameter for controlling the pressure differential and its duration, whereas insulating-packing tightness has little effect on them.


Author(s):  
V. Yu. Gidaspov ◽  
◽  
O. A. Moskalenko ◽  
N. S. Severina ◽  
Ch. Fang ◽  
...  

The results of numerical studies of the effect of water injection on the parameters of detonation waves in gas combustible mixtures are presented.


2013 ◽  
Vol 734-737 ◽  
pp. 1358-1361
Author(s):  
Wu Yi Shan ◽  
Wei Lin Cui ◽  
Yong Sheng Li

In this paper, combining previous research on methods of determining water injection rate, dividing coefficient is introduced into this process. Influential factors of water injection rate are also taken into consideration. Based on those theories mentioned above, an analysis on determining dividing coefficient is made by applying BP neural network. Data from one particular year of exploitation was chosen to build up a neural network model between the dividing coefficient and other factors to determine the dividing coefficient, and then single well water injection rate was determined.


2013 ◽  
Vol 655-657 ◽  
pp. 2216-2219
Author(s):  
Xue Fei Li ◽  
Yan Gang Yang

Water injection was a widely used method for oil exploration in China. The defects of water injection process,inject water quality exceed standard, Unreasonable of injection-production ratio and ,invalid of well control measures, during the water flooding process,may lead to These factors may lead to the occurrence of geological oil spill accident. This paper introduced and discussed these key factors which may lead to oil spill accident, in oil field development processes, for risk prevention and environmental protection in water flooding process.


Sign in / Sign up

Export Citation Format

Share Document