scholarly journals Exploring Factors Affecting Implementation of Public Private Partnership Housing Projects in Bauchi State, Nigeria

2018 ◽  
Vol 4 (3) ◽  
pp. 7001-7005 ◽  
Author(s):  
Mohammed Sani ◽  
◽  
Abdulkadir Sani ◽  
Usman Shuaibu Ahmed ◽  
◽  
...  
2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
The Su Nyein ◽  
Bonaventura H.W. Hadikusumo

Purpose To provide low-cost housing, the Myanmar Government is attempting to use public–private partnership (PPP) to attract private investors. However, there is little information concerning the influencing factors for implementing PPP low-cost housing projects in Myanmar. This paper, therefore, aims to identify and analyse these factors. Design/methodology/approach A total of 51 in-depth interviews were conducted with interviewees involved in various kinds of housing projects implemented through the adoption of PPP or other approaches. The methods of data collection and the analysis are based on grounded theory (GT) methodology. Findings Using the GT method to analyse the interviews, five categories emerged from 50 influencing factors regarding the establishment and implementation of the PPP model for low-cost housing in Myanmar: provision of incentives; obstacles in implementing PPP for all stakeholders; barriers to private sector participation; public sector responsibilities and challenges; and attraction factors and challenges for financial institutions. Among 12 newly found factors, the three most important for PPP low-cost housing in Myanmar are the availability of project funding, the resolution of land-acquisition issues and the development of a sound financing system. Research limitations/implications Our findings strengthen previous studies by identifying factors affecting PPP low-cost housing either specific to Myanmar or common among other countries. Of the 50 factors identified, 38 factors were found in previous studies, but 12 are likely specific to Myanmar. Practical implications Our findings can be used by governments, particularly the Myanmar Government, and financial agencies to understand the low attractiveness of PPP low-cost housing for investors and to develop/improve policies to stimulate PPP low-cost housing, especially in Myanmar. Originality/value Many previous studies have been undertaken to identify factors that influence the implementation of PPP for low-cost housing. However, to the best of the authors’ knowledge, there are no prior studies specific to Myanmar in this context.


2022 ◽  
Vol 7 (2) ◽  
pp. 111-120 ◽  
Author(s):  
Mohammed Shakil Malek ◽  
Laxmansinh Zala

The objective of this paper was to have a study on the perceptions of stakeholders of Public-Private Partnership (PPP) projects for factors affecting the attractiveness of road projects in India. A questionnaire survey was conducted among major PPP project participants of Indian PPP road projects. Fifteen attractive factors were shortlisted through a literature survey for designing the questionnaire. Collected data was analyzed with factor analysis and descriptive statistical analysis. The findings resulted in three components: effectiveness of the private sector, effective time and cost management, and the public sector’s economic benefit. Eight factors were identified as highly affecting the attractiveness of PPP in Indian road projects. PPP provides ample diversity of net benefits to both the public and private sectors. During the project development stage, both sectors have to formulate decisions based on appropriate assessment criteria. Therefore, the reflection of attractive factors will assist the public-sector to select PPP in the road sector. It also helps to establish the strategy for road projects using PPP.


2019 ◽  
Vol 50 (6) ◽  
pp. 686-698
Author(s):  
Jiaqi Liu ◽  
Jicai Liu ◽  
Ruolan Gao ◽  
Huaizhu Oliver Gao ◽  
Yahui Li

The study comprehensively discusses 18 project factors affecting investors’ escalation of commitment (EOC) in a public-private partnership (PPP) project. Using factor analysis, five factor groupings were addressed: the project information and economic benefit, the reward and punishment mechanisms, project uncertainty, the degree of participation and completeness, and the resources invested in the project. The results revealed that the influence of five grouping factors on investor’s EOC is not independent; after performing the weight analysis, the 18 factors had different influences on EOC. These findings offer effective suggestions and theoretical guidelines for reducing the risk of investor EOC.


2019 ◽  
Vol 11 (23) ◽  
pp. 6831 ◽  
Author(s):  
Bo Zhang ◽  
Li Zhang ◽  
Jing Wu ◽  
Shouqing Wang

Local governments around mainland China initiated over 14,000 public–private partnership (PPP) projects with a total investment of 18 billion RMB in recent years, but nearly half have been withdrawn since the end of 2017, which raised wide concerns about whether PPP can contribute to the sustainable infrastructure development in urban China. In this study, we empirically investigated major factors affecting local governments’ PPP adoption, especially factors that led local governments to initiate inappropriate PPP projects. Based on a unique panel dataset of 286 Chinese cities between 2014 and 2017, the empirical findings suggested that local governments’ financial pressure was the most important factor and cities with higher off-budgetary debts or lower budgetary deficits tended to initiate more PPP projects. PPP projects initiated under off-budgetary burdens were more likely to be inappropriate and subsequently withdrawn. Based on the empirical results, we provide policy suggestions to promote sustainable PPP developments in China.


2020 ◽  
Vol 8 (4) ◽  
pp. 1181-1193 ◽  
Author(s):  
Caiyun Cui ◽  
Chenjunyan Sun ◽  
Yong Liu ◽  
Xiaoyan Jiang ◽  
Qing Chen

Author(s):  
Maram Almuhisen ◽  
◽  
Hüseyin Gökçekuş ◽  
Tahir Çelik ◽  
◽  
...  

For the Jordanian government, meeting the growing demand for goods and services on its own is very difficult, leading to the increased dependence on other sectors of society. This research is aimed at understanding the critical success factors of local public-private partnership projects, identifying the most vital risk factors affecting projects, and establishing a quantitative model for risk assessment. The model can assist public-private partnership contributors by transforming the basic risk assessment principles into a more facilitated and systematic arithmetical based approach. The results showed that the risk factors with the highest ranks (respectively) are transfer phase, organizational risks, financing phase, project management risks, and feasibility study phase. The research is ultimately aimed at developing a framework for the risk evaluation of public-private partnerships within the construction industry in Jordan.


2021 ◽  
Vol 12 (1) ◽  
pp. 17-26
Author(s):  
Yakubu N. Sanda ◽  
Natalia A. Anigbogu ◽  
Yohana D. Izam ◽  
Hannatu L. Datukun

Although questionnaires are widely used in construction management studies, designing the instrument has proven to be a difficult task among research students. This article explored the process of developing and testing questionnaires for construction management studies focusing on managing risks in Public Private Partnership (PPP) housing projects. The processes of developing questionnaire were grouped into four stages consisting of the background, conceptualization, design and instrument testing and administration. Using the processes identified, a flowchart indicating step-by-step stages for developing questionnaires was designed. Results of validity and reliability tests conducted on certain aspects of the questionnaire indicated that the instrument can be relied upon to generate acceptable data for scientific research. The main contribution of this paper is expanding the scope and simplifying the design of questionnaire among upcoming researchers in the field of construction management. This study recommends the design for students undertaking construction management related studies.


2016 ◽  
Vol 30 (1) ◽  
pp. 174-191 ◽  
Author(s):  
Janne Sinisammal ◽  
Pekka Leviäkangas ◽  
Tommi Autio ◽  
Elina Hyrkäs

Purpose – The purpose of this paper is to probe experiences of entrepreneurs in the social and health care service provision. Design/methodology/approach – Information was collected regarding entrepreneurs’ views on the factors affecting the collaboration between public and private sectors. A sample of social and health care entrepreneurs was interviewed using open-ended questions. The interviews were transcribed and analysed using inductive content analysis. Findings – Three main categories of factors affecting the success of partnership were identified: the nature of partnership, business aspects and tension builders. Research limitations/implications – The research was undertaken in rural Finland and the sample consisted 13 entrepreneurs. The results must be considered as observations with more generalised conclusions. Practical implications – The results of this study support municipalities in their social and health care service strategy work and especially in consideration of how to also facilitate a fruitful public-private partnership (PPP)-framework, which will largely depend on mutual understanding and consensus. Originality/value – The reform of the social and health care system has raised intensive public debate throughout Europe. Key issues include the reorganising of social and health care processes as well as PPPs in provision of services. This study observes the views and experiences of private entrepreneurs and points out where some potential problems and solutions of social and health care PPPs are.


2020 ◽  
Vol 186 (11-12) ◽  
pp. 124-133
Author(s):  
Yulia Vertakova ◽  
◽  
Tatyana Babich ◽  
Olga Lebedenko ◽  
◽  
...  

The article substantiates the use of public-private partnership (PPP) in order to implement the innovative urban planning policy and create the adaptive territory aimed at the implementation of modern realities of development in the context of technological and social transformation of the economy. The authors of the paper have carried out a comparative analysis of the peculiarities of the implementation of the urban planning policy in individual countries, which made it possible to determine its main innovative directions in modern conditions and form a conceptual basis for the implementation of an innovative urban planning policy based on PPP, a distinctive feature of which is the integrated consideration of factors affecting urban planning activities, as well as the orientation of innovative projects towards the implementation of the adaptive territory approach that meets modern requirements and gives the greatest synergistic effect during its implementation. A comparative analysis of the use of public-private partnership. in urban planning activities in individual countries of the world has been carried out. As a result, an expert analysis methodology for the compliance of the PPP project with the goals and principles of the adaptive territory approach has been substantiated, based on the use of identified priorities for territorial development, a procedure for assessing the contribution of PPP subjects to solving problems of urban planning and calculating a compliance ratio. The proposed methodology makes it possible to comprehensively evaluate the results of the implementation of PPP projects both at the stage of completion and at the stage of project operation.


Sign in / Sign up

Export Citation Format

Share Document