scholarly journals Road construction along River embankment (A Case Study)

Author(s):  
Lateef Ahmad Dar
2021 ◽  
Vol 6 (2) ◽  
pp. 70-77
Author(s):  
Ari Siswanto ◽  
◽  
Ira Kusumawaty ◽  

Water functions are very diverse for humans for daily needs such as drinking water, bathing, agriculture, development, aesthetics, and lower temperatures. Palembang is a lowland area dominated by wetlands, tidal swamps, and rivers. The types of houses on stilts on the banks of the Musi river are limas, Gudang, and Chinese stilt houses which are always associated with the water environment. The construction of roads replacing the role of rivers has realized people that the water environment has an important meaning for the house on stilts. The research objective was to explore the meaning of the water environment from various aspects for residents, stilt houses, and their environment. This research method is a case study with data collection through interviews, observation, measurements, and taking photos. Data and findings were analyzed and juxtaposed with images in the field. The road construction has eliminated part of the function of the river and influenced the change in orientation of the house on stilts. In conclusion, respect for the water environment including rivers has decreased, causing the quality of the river to decline, and the house on stilts cannot take advantage of the existence of the water environment optimally


2013 ◽  
Vol 74 ◽  
pp. 124-133 ◽  
Author(s):  
Adrien Capony ◽  
Bogdan Muresan ◽  
Michel Dauvergne ◽  
Jean-Claude Auriol ◽  
Valéry Ferber ◽  
...  

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Henry Duncan John Mwamvani ◽  
Christopher Amoah ◽  
Emma Ayesu-Koranteng

PurposeThe study aims to find the causes of road projects implementation delays in Blantyre, one of the four city councils (CCs) in Malawi.Design/methodology/approachThe study followed a qualitative research approach using a Blantyre City Council (BCC) as a case study. This study combined in-depth, face-to-face interviews with councillors, secretariat staff, consultants, and contractors who worked on the city's road projects. Data gathered were analysed using thematic content analysis. Also, some road project documents were examined.FindingsThe findings from the case study revealed the primary cause of road project construction delays as the shortage of engineers in conducting detailed proposed projects surveys resulting in incomplete project scope definition before contractor's procurement. Other identified factors were service providers delaying the removal of existing public utility infrastructure from project sites, client funding issues, scope changes, and client delays in issuing instructions to the contractors during project implementation. Another factor was the shortage of construction equipment and construction materials experienced by some appointed contractors.Research limitations/implicationsOnly road construction projects and stakeholders operating from Blantyre city, Malawi, were contacted for the study; thus, the findings may not be generalizable.Practical implicationsThere is an urgent need to increase technical employees, especially engineers and other critical technical staff such as quantity surveyors in Blantyre. Employees' conditions of service should be conducive to attract qualified people to undertake effective management and assessment of projects before commencement to identify the feasibility of proposed projects to decrease the rate of road construction project delays.Originality/valueThe study has established Blantyre city's core challenges in implementing its road projects seamlessly and has provided mitigation measures for dealing with the shortcomings.


Author(s):  
Monika Siejka ◽  
Monika Mika

The development of the communication systems determines the economic level of the country. In Poland, despite the successive investments in this area, it is still not enough beneficial solutions to the road network and international calls. The problem of the acquisition of property for public roads on both the valuation principles and the way of obtaining land for these purposes is constantly modified. These changes are intended to simplify the procedures, which have a significant impact on shortening of the investment process. The current provisions of law give the possibility of the start of road investment before a property owner receives compensation for land taken for this purpose. This situation requires an inventory of component parts of the property for the purposes of their valuation. The paper presents the methodology of inventory the real estate components for the needs of their valuation using modern measurement techniques GNSS and GIS.


2020 ◽  
Vol 12 (24) ◽  
pp. 10549
Author(s):  
Marinella Giunta

The road sector is one of the main sources of air emissions in the atmosphere during both construction and operation. The objective of the present paper is a comprehensive evaluation of the impact on air quality during the two main phases of life cycle of roads. In this case study of a motorway project, the emissions of the primary pollutants, CO, NOx, and PM10 are estimated, and the results showed that (i) CO and NOx pollutants released during both phases are comparable, while the emissions of PM10 are more significant in the construction phase; (ii) 85% of PM10 in construction is due to storage, transit on unpaved road, and crushing; (iii) the portals of the tunnel are the sites where there are higher concentrations of pollutants in operation; and (iv) the CO concentrations estimated by the dispersion model are strongly influenced by the topography.


2020 ◽  
Vol 7 ◽  
Author(s):  
Alessandra Bonoli ◽  
Anna Degli Esposti ◽  
Chiara Magrini

The concept of sustainability in the road construction sector is a complex issue because of the various steps that contribute to the production and release of greenhouse gas (GHG) emissions. Addressing this issue, the European Commission has put various policy initiatives in place to encourage the construction industry to adopt circular economy (CE) and industrial symbiosis (IS) principles e.g., the use of recycled materials. Cooperativa Trasporti Imola (CTI), a company located in the Emilia-Romagna region (Italy), has been chosen for the current case study to examine practices, management, and the industrial symbiosis network among various companies in the road construction and rehabilitation sector. In this regard, the use of steel slags, obtained by an electric arc furnace (EAF), and reclaimed asphalt pavement (RAP), obtained by the deconstruction and milling of old asphalt pavement have been investigated. Two mixtures of recycled hot Mix Asphalt (HMA) i) were prepared incorporating different recycled material percentages for the wearing and binder course, respectively, ii) were characterized in terms of size distribution, strength modulus and volumetric properties, iii) and finally were compared to the performances of two mixtures entirely designed by virgin materials for the wearing and binder course, respectively. Therefore, the Life Cycle Assessment (LCA) tool was chosen to evaluate the environmental impacts that affect the designed road life cycle. The results show that recycling RAP and EAF slags in a CTI batch plant provides benefits by reducing the consumption of virgin bitumen and aggregates and by reducing CO2eq emissions. Finally, practical implications on the use of recycled materials in new asphalt mixtures from a life cycle and industrial symbiosis perspective are provided.


Sign in / Sign up

Export Citation Format

Share Document