scholarly journals Development of Jacketing Machine

Author(s):  
Manish Giripunje

Flat Belt is manufactured almost all over the world. In the Transmission Industries, Flat Belt is almost available in every part. In modern trend demand has been significantly increased. To fulfil the increased demand for flat belt, jacketing operation of flat Belt must be paced up. In traditional jacketing processes which are carried out manually take more time, labour work and also provide damage to industry growth. To overcome this and to minimize stress on workers, an attempt has been made to design a jacketing machine for flat belt, which is simple in design and can be handled by the common man. The demand for a flat belt jacketing machine is higher and it is time to respond to the problem raised. Designing and fabricating such types of functional machines is important to save money instead of investing money and time buying labor and conventional tool. Since metal resources are declining and their products are very expensive as compared to rubber, it’s preferable to use Rubber flat belts rather than using chains for transmission. As per the studies, it is easier and economical to use belt drives replacing chain drives and it is good for the future without disturbing the ecosystem. Study shows that while analyzing the force and power for machines the designer takes the help of analysis software. The cost of software for analysis is high. So there is requirement to find simple formula. In this paper the various theories regarding bending are reviewed, formulae for force and power calculation are collected and finally a case study is taken where we have put together all the results of these formulae. Our main concern is to reduce the human effort required in jacketing of flat belt and also to save the time, labour work, lead time, and move towards the partial automation. The machine has been designed and developed to minimize the cost of production and increase the efficiency.

2020 ◽  
Vol 7 ◽  
Author(s):  
Nur Fitri Hidayanti ◽  
Abdul Wahab ◽  
Zaenafi Ariani

Nowadays, the areas around Mataram City are seldom encountered by rice fields, because almost all of the land is built into housing which was built by developers and offices built by government and private institutions. BTN housing itself is very much in demand. The marketing system conducted by PT. Citra Jaya Graha in selling its products using a marketing mix. First, PT. Citra Jaya Graha in providing its products in the form of BTN houses prioritizes quality by providing various types of houses. Second, in determining price, PT.Citra Jaya Graha to vary the BTN house that he built according to the type based on the price difference seen from the model of the house, type of BTN house (land area and building area), material prices and the cost of building the BTN house. Third, PT. Citra Jaya Graha in promoting products produced using billboards, brochures, and employees (marketing), print media (Lombok Pos newspaper) and electronic media such as websites and Facebook. Fourth, the process of distributing BTN houses is done directly, marketing offers directly to prospective buyers. PT. Citra Jaya Graha also built an Islamic housing complex. Like, Griya Sakinah housing and the establishment of a mosque or mosque in several housing complexes that had built.


2020 ◽  
Vol 7 ◽  
Author(s):  
Nur Fitri Hidayanti ◽  
Abdul Wahab ◽  
Zaenafi Ariani

Nowadays, the areas around Mataram City are seldom encountered by rice fields, because almost all of the land is built into housing which was built by developers and offices built by government and private institutions. BTN housing itself is very much in demand. The marketing system conducted by PT. Citra Jaya Graha in selling its products using a marketing mix. First, PT. Citra Jaya Graha in providing its products in the form of BTN houses prioritizes quality by providing various types of houses. Second, in determining price, PT.Citra Jaya Graha to vary the BTN house that he built according to the type based on the price difference seen from the model of the house, type of BTN house (land area and building area), material prices and the cost of building the BTN house. Third, PT. Citra Jaya Graha in promoting products produced using billboards, brochures, and employees (marketing), print media (Lombok Pos newspaper) and electronic media such as websites and Facebook. Fourth, the process of distributing BTN houses is done directly, marketing offers directly to prospective buyers. PT. Citra Jaya Graha also built an Islamic housing complex. Like, Griya Sakinah housing and the establishment of a mosque or mosque in several housing complexes that had built.


2020 ◽  
Vol 0 (0) ◽  
Author(s):  
Zofia Wysokińska ◽  
Tomasz Czajkowski ◽  
Katarzyna Grabowska

AbstractNonwovens are one of the most versatile textile materials and have become increasingly popular in almost all sectors of the economy due to their low manufacturing costs and unique properties. In the next few years, the world market of nonwovens is predicted to grow by 7%–8% annually (International Nonwovens & Disposables Association [INDA], European Disposables and Nonwovens Association [EDANA], and Markets and Markets). This article aims to analyze the most recent trends in the global export and import of nonwovens, to present two case studies of Polish companies that produce them, and to present one special case study of the market of nonwoven geotextiles in China and India, which are the Asian transition economies among the BRICS countries (Brazil, Russia, India, China, and South Africa).


2020 ◽  
Vol 4 (02) ◽  
pp. 34-45
Author(s):  
Naufal Dzikri Afifi ◽  
Ika Arum Puspita ◽  
Mohammad Deni Akbar

Shift to The Front II Komplek Sukamukti Banjaran Project is one of the projects implemented by one of the companies engaged in telecommunications. In its implementation, each project including Shift to The Front II Komplek Sukamukti Banjaran has a time limit specified in the contract. Project scheduling is an important role in predicting both the cost and time in a project. Every project should be able to complete the project before or just in the time specified in the contract. Delay in a project can be anticipated by accelerating the duration of completion by using the crashing method with the application of linear programming. Linear programming will help iteration in the calculation of crashing because if linear programming not used, iteration will be repeated. The objective function in this scheduling is to minimize the cost. This study aims to find a trade-off between the costs and the minimum time expected to complete this project. The acceleration of the duration of this study was carried out using the addition of 4 hours of overtime work, 3 hours of overtime work, 2 hours of overtime work, and 1 hour of overtime work. The normal time for this project is 35 days with a service fee of Rp. 52,335,690. From the results of the crashing analysis, the alternative chosen is to add 1 hour of overtime to 34 days with a total service cost of Rp. 52,375,492. This acceleration will affect the entire project because there are 33 different locations worked on Shift to The Front II and if all these locations can be accelerated then the duration of completion of the entire project will be effective


2016 ◽  
Vol 10 (2) ◽  
pp. 162-171
Author(s):  
Hafid Hafid ◽  
Tatang Sutisna

The design and manufacturing of the rotary table with the specification Ø 170 mm (6 inches) for CNC machine 4 axis has been done. The objective of manufacturing a rotary table is to increase the efficiency of CNC machine Hardford 4 axis to be above 80% in line machining center CV. IM’s workshop. The engineering methods was taken, consist of: working preparation, manufacturing of working drawing, engineering process, the manufacturing and testing. The prototype has been tested and operated, the resulting of increasing productivity of which were as follows: the process of assembling was increased to be 3 time ( before 1 time) and processing time for a specific case reduced from 5 hours to 3 hours, number of operators for the case of assembling the rotary reduced to 1 person (before 4 persons), safety and security become to be better. The results show increased efficiency of CNC machine Hardford, from under 50% to be above 80%. Based on the economical analysis obtained by the cost of good sold (C.G.S) of the rotary table is IDR 34.060.000. The results presented in this paper is expected to be case study for developing a business of the metal and engineering SMEs domestic to the effort of improving efficiency, quality, productivity and competitiveness in global market.ABSTRAKPerancangan dan pembuatan alat bantu meja putar (rotary table) dengan spesifikasi teknis Ø 170 mm (6 inci) untuk mesin CNC 4 axis telah dilakukan. Tujuan pembuatan rotary table adalah untuk meningkatkan efisiensi mesin CNC Hardford 4 axis di atas 80% pada line machining center Bengkel CV. IM. Metode rancang bangun yang dilakukan, meliputi: persiapan kerja, pembuatan gambar kerja, proses engineering, pembuatan dan uji coba. Prototip tersebut telah diuji coba dan dioperasikan dengan hasil peningkatan produktivitas sebagai berikut: proses pengerjaan bongkar pasang meningkat menjadi 3 kali (sebelumnya 1 kali) dan waktu pengerjaan untuk kasus tertentu berkurang dari 5 jam menjadi 3 jam, jumlah operator untuk kasus bongkar pasang rotary berkurang menjadi 1 orang (sebelumnya 4 orang), keselamatan kerja dan keamanan menjadi lebih baik. Hasil peningkatan berupa efisiensi mesin CNC Hardford 4 axis dari sebelumnya di bawah 50% menjadi di atas 80%. Berdasarkan hasil perhitungan analisis ekonomi diperoleh harga pokok produksi (HPP) alat bantu meja putar adalah sebesar Rp. 34.060.000. Bahasan ini diharapkan menjadi contoh kasus bagi pengembangan usaha IKM logam dan mesin dalam negeri untuk meningkatkan efisiensi, mutu, produktivitas dan keunggulan daya saing di pasar global.Kata kunci: alat bantu meja putar, mesin CNC, harga pokok produksi


Author(s):  
Michael Woo ◽  
Marcos Campos ◽  
Luigi Aranda

Abstract A component failure has the potential to significantly impact the cost, manufacturing schedule, and/or the perceived reliability of a system, especially if the root cause of the failure is not known. A failure analysis is often key to mitigating the effects of a componentlevel failure to a customer or a system; minimizing schedule slips, minimizing related accrued costs to the customer, and allowing for the completion of the system with confidence that the reliability of the product had not been compromised. This case study will show how a detailed and systemic failure analysis was able to determine the exact cause of failure of a multiplexer in a high-reliability system, which allowed the manufacturer to confidently proceed with production knowing that the failure was not a systemic issue, but rather that it was a random “one time” event.


1992 ◽  
Vol 25 (9) ◽  
pp. 211-216
Author(s):  
A. Akyarli ◽  
Y. Arisoy

As the wave forces are the function of the wave height, period and the angle between the incoming wave direction and the axis of the discharge pipeline, the resultant wave force is directly related to the alignment of the pipeline. In this paper, a method is explained to determine an optimum pipeline route for which the resultant wave force becomes minimum and hence, the cost of the constructive measures may decrease. Also, the application of this method is submitted through a case study.


Author(s):  
David Whetham

Between 2007 and 2011, Wootton Bassett, a small Wiltshire town in the UK, became the focus of national attention as its residents responded to the regular repatriations of dead soldiers through its High Street. The town’s response came to symbolize the way that broader attitudes developed and changed over that period. As such, it is a fascinating case study in civil–military relations in the twenty-first century. Success may be the same as victory, but victory, at least as it has been traditionally understood, is not a realistic goal in many types of contemporary conflict. Discretionary wars—conflicts in which national survival is not an issue and even vital national interests may not be at stake—pose particular challenges for any government which does not explain why the cost being paid in blood and treasure is ‘worth it’.


2016 ◽  
Vol 18 (1) ◽  
Author(s):  
Roelof Baard ◽  
George Nel

Background: Although research shows that almost all listed companies have corporate websites with dedicated investor relations (IR) sections that enable companies to ‘push’ information to investors, it was argued that such an asymmetrical approach to communication is insufficient for companies wishing to exercise good IR. The purpose of this study was to test the effectiveness of the Internet to act as a mechanism to achieve more interactive communication between companies and investors.Objectives: The objectives of the study were to measure the responsiveness, timeliness and relevance of companies’ responses to e-mail requests, and to test for the determinants (size, market-to-book ratio, profitability, leverage and liquidity) thereof.Method: The mystery investor approach and a content analysis were used to study the e-mail handling performance of companies. The associations between company-specific characteristics were statistically tested.Results: It was found that the e-mail handling performance of companies in this study was poor compared with previous studies. Significant relationships between company size and responsiveness and relevance, and between market-to-book ratio and relevance were reported, as well as between the contact method used to request information and relevance and the use of social media and timeliness.Conclusion: Specific areas where companies could improve their investor communications were identified. The need for further research was discussed to explain some of the relationships found, as well as those not found, in contrast to what was expected. Future research is warranted to examine the relationship between the e-mail handling performance of companies and information asymmetry and the cost of equity of companies.


Sign in / Sign up

Export Citation Format

Share Document