scholarly journals Training Program in the Construction projects

Construction is questionably a main part in relative to comprehensive development . It plays an important part in the role in the economy as and in people’s survives over influencing and preserving the environment of the city-region’s constructed, and it is a rising sector. To provide an efficient performance and more development of the economic, there is emphases on optimizing the employees contribution to the goals and areas of the governments. The training significance as a management central part has long been documented by principal writers.This paper aim to find the impact of training in the construction industry and how the training is been underestimate lead in increase the cost by using the simulation technique system dynamic. The research methodology include designing of questionnaire that consist of three items , the first item include , general Training (Training Program), evaluation of on-the-job training and evaluation of training after establishing work and the second part include building the model using system dynamic to show the effect of training on the cost of construction. the results the authors made the following conclusions .The absence of training program has very strong effect as the absence of such program is caused by the finance absence , this is common problem with Iraqi construction industry. The most environment of the Iraqi industry is the absence of the finance from both owner and contractor as they ignore this part and consider unnecessary expenses and this will lead to unqualified engineering or worker in the wrong job .The absence of management mean that , usually the contractor and his staff are working without the supervise or represented from the owner side , which some time mean unskilled workers may be hired which lead to delay of the work and cost overruns .

2021 ◽  
Vol 27 (2) ◽  
pp. 106-125
Author(s):  
Karukh Hassan Mohammad ◽  
Noori Sadiq Ali ◽  
Basira Majeed Najm

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine whether the overrun of project cost and schedule significantly varied depending on project type, size, duration, location, and awarded years. The findings indicated that cost overruns are very common due to variation orders. 95.6% of the projects were studied being impacted, and overrun in project cost are also huge, with 16%. Time also overruns more common than cost overruns due to the variation orders. 98.7% of the projects were studied in Sulaimani were affected by time overrun with an average of 46.3% of initial duration observed. Findings also indicated that two out of five parameters measured in the analysis had a significant correlation with project cost overruns. Three out of five considered variables correlated with construction time overruns. 


Symmetry ◽  
2019 ◽  
Vol 11 (5) ◽  
pp. 677 ◽  
Author(s):  
Wang Jing ◽  
Hafeth Ibrahem Naji ◽  
Raquim Nihad Zehawi ◽  
Zainab Hasan Ali ◽  
Nadhir Al-Ansari ◽  
...  

Cost and time performance are considered to be the most important aspects in the construction industry. The exceptional conditions that took place in Iraq since the beginning of the third millennia had a huge vicious impact on the cost and time performance of local construction projects. This may represent the principal motivation for the local authorities to enact some four successive legislations in order to control the performance of the construction industry. In this research, an evaluation is made to the cost and time performance of local construction projects and their variation due to the multiple changes in the internal factors that affect project performance, and changes in the surrounding events include legislative, economic, and security environment during the period that lasted from 2003 to 2014. Data is collected from 30 governmental projects to conduct the evaluation. A comprehensive questionnaire is performed to estimate a quantitative value for the impact of several factors that concern both the owner and the contractor, with special consideration to their variation through the successive legislation periods. These estimates are, in turn, utilized in a system dynamics model, in which the project development process is simulated. The final cost and duration changes in the project are accumulated in the form of stocks to give an indication of the cost and time performance of the project. The developed model returned a progressive reduction of 10.9% for the change in project cost and 135.37% for the change in project schedule throughout the eleven years period.


2018 ◽  
Vol 7 (3.12) ◽  
pp. 1265
Author(s):  
Shaik Salma ◽  
P Santha Rao

In the countries like India where one has to still handle a unique blend of operational diversities like human operated traditional construction practices and modern construction technologies, in all construction projects that are highly vulnerable to socio-economic, political, technical and business risks. The involvement of the people with diverse educational, technical, economical and experience backgrounds is an unavoidable fact of the construction industry in India and hence the human factors are going to play a key role in the project to be more prone to risks as well as to mitigate the likely projects risks. Due to lack of robust risk management system, many prestigious construction projects in India have suffered failures and have impacted the country’s GDP and growth because of the gigantic share of the construction industry in the country’s economy. Hence, the risk management in the construction industry has become the subject of concern for the industry practitioners and so the analysis of operational difficulties for the identification and management of construction related risks to minimize the cost overruns, quality deviations and uncertain delays, is remained to be the main objective of the research by the domain experts and engineers for so long. In this paper, an attempt has been made to review all such papers with a specific aim to identify and analyze the human factors that, are highly acknowledged by experts in their works and, can influence / impact the project parameters namely cost, time and quality and validate the results by tracking a real time construction project to draw conclusions.  


2021 ◽  
Vol 10 (3) ◽  
Author(s):  
Haitham Nasser Al Siyabi ◽  
Omar Khaleel

There are many challenges in construction industry sector, and one of the most important and critical is completion of the project within the original contract value. As the issue of cost overrun in construction projects is spread worldwide generally and commonly encountered in the Sultanate of Oman.The main objectives of this study are to identify and determine vital factors leading to cost overrun in Building Projects in Oman, evaluate the impact of cost overrun in building construction projects and develop the best protocol strategy for project management teams that can be adopted in order to control the cost overrun in future projects. These objectives have been obtained through several methods, questionnaire survey,interviews with experts in construction industry. Twenty nine major factors lead to cost overrun were identified through literature review and studied in Sultanate of Oman.The study concluded that there are three major impacts of cost overrun in construction projects and industry which are time of completion, delivery of poor quality projects and delay of payment approval. Additional to that, Hire good Supervision Team, a good Cost Controller, Project Manager, a good project design team, well planning for pre-contract stage and proper procurement strategy. Consider the Risk assessment and Risk Control are crucial to minimize the cost overrun in building construction project in Oman. The study have recommended procedure to cost control in future project such as the Employer should have a proper tender analysis of the Contractor’s bid, Detailed design should be finalized before award of work and others.


2019 ◽  
Vol 11 (5) ◽  
Author(s):  
Vitali Chulkov ◽  
Sergey Sinenko ◽  
Mukhammet Fakhratov ◽  
Mohammad Akbari

Cost overruns vary evidently almost in every construction project, but their magnitude from project to project. The cost overruns have hit down the economy and the reputation of many Construction Company and hit down the economy and the reputation of many construction companies around the world. Many project management tools are designed to manage the project's budget. However, cost management is still considered poor, as there are many cost overruns in the construction industry. Thus, this work is aimed at identifying and clustering potential factors of the excess cost of construction projects in accordance with their original groups using a thematic approach. Basically, through a literature review, all the potential factors that could cause cost overruns were carefully analyzed before they were grouped into seven (7) groups of underlying factors, namely: project, contract, client, contractor consultant, workforce and external. Each potential factor was clearly explained with some examples based on Malaysian case studies to illustrate the cost overruns scenario. These findings may help in the future to focus on how to mitigate critical potential cost-overs to reduce or overcome its impact on all involved stakeholders.


Neutron ◽  
2022 ◽  
Vol 21 (2) ◽  
pp. 52-59
Author(s):  
Liliana Hannes ◽  
Julistyana Tistogondo

Accelerating infrastructure development in Indonesia is a good thing, but this is not without problems. The COVID-19 pandemic is a problem that has a large and global impact, not least in Indonesia, especially in the construction industry sector. The construction project of the Soedono Madiun Hospital is one of the construction projects that have experienced the direct impact of the COVID-19 pandemic. Therefore, the purpose of this study is to review and analyze the impact of the covid-19 pandemic on construction projects in the case study of the construction project of the Soedono Madiun Hospital, and to find out the biggest impact of the covid-19 pandemic which has the most influence on construction projects in the case study of the construction project of the Soedono Hospital. Madison. The research method used to determine the biggest impact of the covid-19 pandemic on the cost and time aspects is the multiple linear regression analysis method with the help of Microsoft Excel. The other data analysis methods used in this study were the validity and reliability tests used in testing the questionnaire. The results of data analysis conducted in this study indicate that there are seven independent variables affect the dependent variable, namely the suitability of planning and project realization with the equation y= 94.186-0.376x1-0.108x2-1.014x3+0.873x4 for the time aspect, and the equation y=87,009 -0.0006x5-0.001x6-0.0002x7 for the cost aspect. With this equation, it can be seen that the independent variable that has the most influence on the dependent variable on the time aspect is the independent variable X3, namely the change in the time schedule due to delays in the arrival of construction materials by 1.014, while in the cost aspect is the independent variable X6, namely changes in costs due to instability. the price of construction materials is 0.001. So, it is hoped that there will be a project management handling that focuses on the most influential variable, namely construction materials.


2015 ◽  
Vol 3 (2) ◽  
pp. 69-84
Author(s):  
Wadhah Amer Hatem ◽  
Samiaah M. Hassen Al-Tmeemy

     Suicide attacks, bombings, explosions became the part of daily life in Iraq. Consequently, the threat of terrorism put the Iraqi construction sector in the face of unique and unusual challenges that not seen on other countries. These challenges can have extensive impact on construction projects. This paper seeks to examine the impact of the terrorist attacks on construction industry and determine the extent to which the impact of terrorism on construction projects in terms of cost, schedule, and quality. This study adapted quantitative and qualitative approaches to collect data using questionnaire survey and interviews, as well as historical data. The study focused on projects that have been the target of terrorist strikes in Diyala governorate. A variety of statistical procedures were employed in data analysis. The results revealed the extent to which terrorist attacks impact construction projects in terms of cost, time, and quality. The results of this study will enhance the awareness of all construction parties to the impact of the terrorist attacks against construction projects. Eventually, this can develop a risk management assessment and assist contractors to properly protect projects and buildings to minimize injuries and fatalities in the event of terrorism.


Author(s):  
V.V. Verna

The article provides a rationale for methodological approaches to assessing the effectiveness of outsourcing in organizations of the construction industry using the example of outsourcing schemes to perform personnel functions. The conditional example shows the impact of the use of outsourcing on reducing the costs of a construction organization. The main prerequisites for the use of outsourcing in the activities of enterprises in the construction industry are identified, methodological approaches to assessing the cost-effectiveness of personnel outsourcing in the construction industry enterprises are substantiated.


2021 ◽  
Vol 14 ◽  
pp. 1-9
Author(s):  
Jeffrey Boon Hui Yap ◽  
Shi Min Tan

Construction practitioners recognise that rework is undesirable due to the detrimental effects. While rework literature has examined rework causation factors in construction projects, the problem continues to plague the industry resulting in poor delivery performance. To better understand this phenomenon and given the scarcity of Malaysian-based rework study, a questionnaire survey involving 130 Malaysian construction practitioners (consultants, contractors and clients) were undertaken to obtain feedback about nature, implications, causes and solutions for rework. Data were analysed using descriptive statistical techniques to prioritise the variables studied. From the analyses, rework is a causal factor for delays and cost overruns, higher wastage and productivity inhibitor. The findings revealed the leading causes of rework are poor quality management, improper planning, lack of communication, design changes and poor subcontractor management. Some practical rework minimisation approaches are also suggested to better manage and prevent rework towards enhanced project performance.


Author(s):  
Syed Nihas ◽  
Kristen Barlish ◽  
Jacob Kashiwagi ◽  
Dean Kashiwagi

The Indian construction industry has been characterized by poor performance. This paper analyzes the potential impact of the Indian culture on the poor performance. If the culture is a major cause in the construction industry subpar performance, can the cultural influence be overridden to minimize construction project delays and cost overruns. The authors propose to identify the  unique cultural issues, identify using the Construction Industry Structure (CIS) model the impact of the cultural issues on the construction industry, and identify a potential solution to the problem. The paper proposes to test the solution in actual tests with industry participants. What makes this research unique is the approach of using deductive logic to create a simple solution, and then convincing a major research client to test the proposal.