scholarly journals A Study on the Water/Polymer Co-Flooding Seepage Law and Reasonable Polymer Injection Volume in Offshore Oilfields

Processes ◽  
2020 ◽  
Vol 8 (5) ◽  
pp. 515
Author(s):  
Jiwei Wang ◽  
Liyang Song ◽  
Kaoping Song ◽  
Chi Dong ◽  
Lingyu Tian ◽  
...  

To analyze the water/polymer co-flooding seepage law in offshore oilfields, we took the Jinzhou 9-3 oilfield as an example, analyzed the dynamic characteristics of water/polymer co-flooding, and then applied streamline simulation and tracer simulation technology to obtain the water/polymer co-flooding seepage law. The interference degree of the water/polymer co-flooding was quantified, and the accuracy of the seepage law was tested. Finally, a reasonable polymer injection volume was obtained using the economic law. The results demonstrated that the water-cut of the Jinzhou 9-3 oilfield in the water/polymer co-flooding stage was high, the annual decrease of polymer store ratio increased by 2.02 times, and the swept area of polymer was limited to some extent. Mutual interference existed in the water/polymer flooding, and the oil increment of per ton polymer decreased by 36.5%. In the late stage of the water/polymer co-flooding, the utilization rate of water and polymer was low, and the plane swept area and vertical swept volume were small. If the oil price was 50 dollars/bbl, when the output-input ratio was set at 1, the reasonable polymer injection volume was 0.59 PV, and the continuous polymer injection volume was 0.29 PV in the water/polymer co-flooding stage. The study results could improve the development benefit of the Jinzhou 9-3 oilfield, and they could also provide the references for the development of the same type oilfield.

2011 ◽  
Vol 51 (2) ◽  
pp. 672
Author(s):  
Daniel León ◽  
John Scott ◽  
Steven Saul ◽  
Lina Hartanto ◽  
Shannon Gardner ◽  
...  

After successful design and implementation phases that included both subsurface and facilities components, an EOR polymer injection pilot has been operational for two years in Australia's largest onshore oil field at Barrow Island (816 MMstb OOIP). The pilot's main objective was to identify a suitable EOR technology for the complex, highly heterogeneous, very fine-grained, bioturbated argillaceous sandstone—high in glauconite, high porosity (∼23 %), low permeability (∼5 mD, with 50+ mD streaks)—reservoir that will ultimately increase the recovery of commercial resources past the estimated ultimate recovery factor with waterflooding (∼42 %). This was achieved using the in-depth flow diversion (IFD) methodology to access new unswept oil zones—both vertically and horizontally—by inducing growth in the fracture network. During the pilot operating phase, the main focus has been on surveillance and monitoring activities to assess the effectiveness of the process, including: injection pressure at the wellheads—indicating any increase in resistance to flow; pressure fall off tests at the injectors—to determine fracture growth, if any sampling and lab analysis at the producers—to identify polymer breakthrough; frequent production tests—quantifying reduction in water cut and oil production uplift; and, pressure build up surveys at the producers. These activities provided input data to the fit for purpose simulation model built in Reveal incorporating fractures and polymer as a fourth phase. With more than 96 % compliance to the surveillance plan, this paper will present the present findings and evaluation of the results, which may lead to the continuation of the pilot in other patterns of the reservoir and, possibly, to further expansion in the field.


2008 ◽  
Vol 11 (06) ◽  
pp. 1117-1124 ◽  
Author(s):  
Dongmei Wang ◽  
Randall S. Seright ◽  
Zhenbo Shao ◽  
Jinmei Wang

Summary This paper describes the design procedures that led to favorable incremental oil production and reduced water production during 12 years of successful polymer flooding in the Daqing oil field. Special emphasis is placed on some new design factors that were found to be important on the basis of extensive experience with polymer flooding. These factors include (1) recognizing when profile modification is needed before polymer injection and when zone isolation is of value during polymer injection, (2) establishing the optimum polymer formulations and injection rates, and (3) time-dependent variation of the molecular weight of the polymer used in the injected slugs. For some Daqing wells, oil recovery can be enhanced by 2 to 4% of original oil in place (OOIP) with profile modification before polymer injection. For some Daqing wells with significant permeability differential between layers and no crossflow, injecting polymer solutions separately into different layers improved flow profiles, reservoir sweep efficiency, and injection rates, and it reduced the water cut in production wells. Experience over time revealed that larger polymer-bank sizes are preferred. Bank sizes grew from 240-380 mg/L·PV during the initial pilots to 640 to 700 mg/L·PV in the most recent large-scale industrial sites [pore volume (PV)]. Economics and injectivity behavior can favor changing the polymer molecular weight and polymer concentration during the course of injecting the polymer slug. Polymers with molecular weights from 12 to 35 million Daltons were designed and supplied to meet the requirements for different reservoir geological conditions. The optimum polymer-injection volume varied around 0.7 PV, depending on the water cut in the different flooding units. The average polymer concentration was designed approximately 1000 mg/L, but for an individual injection station, it could be 2000 mg/L or more. At Daqing, the injection rates should be less than 0.14-0.20 PV/year, depending on well spacing. Introduction Many elements have long been recognized as important during the design of a polymer flood (Li and Niu 2002; Jewett and Schurz 1970; Sorbie 1991; Vela et al. 1976; Taber et al. 1997; Maitin 1992; Koning et al. 1988; Wang et al. 1995; Wang and Qian 2002; Wang et al. 2008). This paper spells out some of those elements, using examples from the Daqing oil field. The Daqing oil field is located in northeast China and is a large river-delta/lacustrine-facies, multilayer, heterogeneous sandstone in an inland basin. The reservoir is buried at a depth of approximately 1000 m, with a temperature of 45°C. The main formation under polymer flood (i.e., the Saertu formation) has a net thickness ranging from from 2.3 to 11.6 m with an average of 6.1 m. The average air permeability is 1.1 µm2, and the Dykstra-Parsons permeability coefficient averages 0.7. Oil viscosity at reservoir temperature averages approximately 9 mPa·s, and the total salinity of the formation water varies from 3000 to 7000 mg/L. The field was discovered in 1959, and a waterflood was initiated in 1960. The world's largest polymer flood was implemented at Daqing, beginning in December 1995. By 2007, 22.3% of total production from the Daqing oil field was attributed to polymer flooding. Polymer flooding should boost the ultimate recovery for the field to more than 50% OOIP--10 to 12% OOIP more than from waterflooding. At the end of 2007, oil production from polymer flooding at the Daqing oil field was more than 11.6 million m3 (73 million bbl) per year (sustained for 6 years). The polymers used at Daqing are high-molecular-weight partially hydrolyzed polyacrylamides (HPAMs). During design of a polymer flood, critical reservoir factors that traditionally receive consideration are the reservoir lithology, stratigraphy, important heterogeneities (such as fractures), distribution of remaining oil, well pattern, and well distance. Critical polymer properties include cost-effectiveness (e.g., cost per unit of viscosity), resistance to degradation (mechanical or shear, oxidative, thermal, microbial), tolerance of reservoir salinity and hardness, retention by rock, inaccessible pore volume, permeability dependence of performance, rheology, and compatibility with other chemicals that might be used. Issues long recognized as important for polymer-bank design include bank size (volume), polymer concentration and salinity (affecting bank viscosity and mobility), and whether (and how) to grade polymer concentrations in the chase water. This paper describes the design procedures that led to favorable incremental oil production and reduced water production during 12 years of successful polymer flooding in the Daqing oil field.


2020 ◽  
Vol 143 (8) ◽  
Author(s):  
Peng Wang ◽  
Fenglan Zhao ◽  
Shijun Huang ◽  
Meng Zhang ◽  
Hairu Feng ◽  
...  

Abstract Excessive water production is a common matter that seriously affects production efficiency during the development of edge-water fault-block reservoirs. Gas huff-n-puff is an effective water shutoff technology that has the characteristics of small injection volume, no interwell connectivity impact, and minor gas channeling. However, gas injection can destroy the stability of the asphaltene to induce asphaltene deposition. In this article, the laboratory experiment had been conducted to investigate the effect of injection ratio and injection sequence on oil increment and water cut control for gas mixture huff-n-puff. Experimental results indicated that the effect of N2 huff-n-puff on water cut control was the most obvious, while CO2 huff-n-puff had the best performance on oil increment. Oil increment and water cut control of gas mixture huff-n-puff with CO2 injected in advance were obviously better than that of N2 injection preferentially. Subsequently, PVTsim Nova was utilized to investigate whether reducing CO2 injection volume can inhibit asphaltene deposition and predict the possibility of asphaltene deposition at reservoir conditions. Simulation results demonstrated that the asphaltenes were easily deposited with CO2 injection while N2 injection will be unlikely to induce asphaltene deposition. Asphaltene deposition pressure envelope can qualitatively analyze the possibility of asphaltene deposition and provide a reference for screening the appropriate gas injection ratio based on giving full play to the synergistic effect of CO2 and N2. In this study, 7:3 is selected as the optimum injection ratio considering the synergistic effect and the possibility of asphaltene deposition.


2014 ◽  
Vol 18 (01) ◽  
pp. 11-19 ◽  
Author(s):  
J.. Buciak ◽  
G.. Fondevila Sancet ◽  
L.. Del Pozo

Summary This paper deals with the learning curve of a five-plus-year polymer-flooding pilot conducted in a mature waterflood that includes, for example, several works related to injector and producer wells and reservoir management. The scope of this paper is to describe the learning curve during the last 5 years rather than the reservoir response of the polymer-flooding technique; focus is on the aspects related to reduce cost per incremental barrel of oil for a possible extension to other waterflooded areas of the field. Diadema oil field is in the San Jorge Gulf basin in the southern portion of Argentina. The field is operated by CAPSA, an Argentinean oil-producer company; it has 480 producer and 270 injector wells (interwell spacing is 250 m on average). The company has developed waterflooding over more than 18 years (today, this technique represents 82% of oil production in the field) and produces approximately 1600 m3/d of oil and 40 000 m3/d of gross production (96% water cut) with 38 400 m3/d of water injection. The reservoir that is polymer-flooded is characterized by high permeability (average of 500 md), high heterogeneity (10 to 5,000 md), high porosity (30%), very stratified sandstone layers (4 to 12 m of net thickness) with poor lateral continuity (fluvial origin), and 20 °API oil (100 cp at reservoir conditions). Diadema's polymer-flooding pilot started in October 2007 on five water injectors (it includes 13 injectors today) with an injected rate of 1000 m3/d (today, 2000 m3/d). Polymer solution is made with produced water (15,000 ppm brine) and 1,500 ppm of hydrolyzed polyacrylamide polymer reaching 15- to 20-cp fluid-injection viscosity. Oil-production rate from the original “central” producers (wells that are aided with 100% of polymer injection) has increased 100% at the same time as average reduction in water cut is approximately 15%. The main aspects presented in this work are depth profile modification with crosslinked gel injected along with polymer, use of “curlers” to regulate injection in multiple wells with one injection pump without shearing the polymer, and an improved technology on producer wells with progressing-cavity pumps to decrease shut-in time and number of pump failures. The plan for the future is to extend this project to other areas with the acquired knowledge and to improve different aspects, such as water quality and optimization of polymer plant operation. These improvements will allow the company to reduce operating costs per incremental barrel of oil.


SPE Journal ◽  
2021 ◽  
pp. 1-14
Author(s):  
Zheyu Liu ◽  
Yiqiang Li ◽  
Xin Chen ◽  
Yukun Chen ◽  
Jianrong Lyu ◽  
...  

Summary Surfactant-polymer (SP) flooding has been regarded as an efficient technique for enhanced oil recovery in the development of mature oil fields, especially for those with heterogeneous conglomerate reservoirs. However, people are still unclear about the optimal SP flooding initiation timing (OSPT) that is expected to contribute to the maximum ultimate recovery factor in the case with a limited amount of SP solution injection. Accordingly, this study aims to investigate OSPT through conducting a series of experiments, including nuclear magnetic resonance (NMR) online monitoring, full-diameter coreflooding, and microfluidic study. The fractional-flow curve is used to identify OSPT, of which the effect on the oil recovery is analyzed. OSPT is demonstrated to be dependent on the amount of injected SP solution. An earlier-started SP flooding is favorable for achieving higher oil recovery factors under the premise of sufficiently high SP solution injection [more than 1.5 pore volume (PV)]. With the commonly used 0.65 PV of SP solution in the reservoir scale, OSPT is suggested to be at the moment when a water cut of 80 to 90% is reached. The formation of dense emulsions in the early-started SP flooding affects the performance of the post-waterflooding, which eventually decreases the ultimate oil recoveries because of inadequacy of SP solution. An earlier-started SP flooding contributes to a larger swept volume, but the initial efficiency of the SP flooding is lower than that of the waterflooding when the injection pressure is constant. OSPT is proposed through analyzing the fractional-flow curve in the case of 0.65 PV of SP injection, and the determined OSPT is validated by coreflooding experiments and field data. Moreover, OSPT for the conglomerate reservoir is suggested to be earlier than that for the relatively homogenous sandstone reservoir.


2021 ◽  
Author(s):  
Weeraya Wuttipittayamongkol ◽  
Pannapon Trinavarat ◽  
Warisa Nuntaprayoon ◽  
Monrawee Pancharoen ◽  
Rapheephan Laochamroonvorapongse

Abstract Becoming more mature with field-wide water flooding implementation for more than 30 years, Sirikit Oil Field (S1) is going forward to the next rejuvenating step of enhanced oil recovery (EOR). Generally, the field contains light oil (40° API) in highly stratified sand-shale sequences with low net-to-gross ratios. High reservoir temperature, low permeability, and high water cut observed from production make it even more challenging for polymer injection projects. Nonetheless, the success from a small-scale field trial has shown a promising future of EOR application in the field and brought an execution of the first large-scale polymer injection pilot. Polymer screening laboratory tests, a reservoir simulation study, data acquisition program and techniques, injectivity tests, polymer injection unit design, and risk assessment were parts of the pilot preparation, in which the key learnings from the previous pilot have been incorporated. The gathering and determination of baseline parameters including production performance, injection profiles, reservoir fluid saturation profiles, etc., were registered for ultimate evaluation. Then, the continuous polymer injection has been started since October 2019 in two separated fault blocks where 12 injectors and 20 producers are located in different injection patterns. During several months of polymer injection, both foreseen and unforeseen changes have enlivened the pilot management. Although the injectivity test with polymer solution prior to the pilot demonstrated no injection difficulty, several wells have shown injectivity deterioration with time. Mechanical degradation is induced in these wells by the installation of flow restriction devices to lessen solution viscosity and, hence, prolong polymer injectivity. Well integrity issues and artificial lift breakdown negatively affect field production and close-in wells make it harder for voidage replacement control. Immediate troubleshooting and close monitoring have been placed and eventually leads to the recognition of encouraging results. Polymer helps improve vertical injection profiles as seen from injection logging. Saturation logging presents a sign of oil saturation decrease around the wellbore area. Reduction of water cut and rise of oil production have pleasantly come after a few months from the start. Intensive surveillance program will be continued over the course of pilot injection. The critical success of the EOR pilot execution depends on the detailed planning, prudent surveillance and comprehensive evaluation. Sirikit oil field is moving to a turning point and the pilot outcome would lead the way to a further milestone, so as to avoid premature end of the field's production.


2014 ◽  
Vol 584-586 ◽  
pp. 1761-1767
Author(s):  
Li Yang Song ◽  
Ji Cheng Zhang

According to the feature of the second oil layer in the west block of Beierxi, this paper investigated the relationship between the permeability contrast and the recovery efficiency, and the relationship between the permeability contrast and the descent range of water cut of polymer flooding, using the numerical simulation. From the comparative analysis of the development effect with different methods of polymer-injection, it got the boundary of the interlayer permeability contrast of the positive and inverted rhythm layer in the second oil layer with the separated zone and separated quality polymer-injection respectively. That provided certain theoretical foundation for carrying on the polymer flooding in the region of interest.


2016 ◽  
Vol 2016 ◽  
pp. 1-9 ◽  
Author(s):  
Lisha Zhao ◽  
Li Li ◽  
Zhongbao Wu ◽  
Chenshuo Zhang

An analytical model has been developed for quantitative evaluation of vertical sweep efficiency based on heterogeneous multilayer reservoirs. By applying the Buckley-Leverett displacement mechanism, a theoretical relationship is deduced to describe dynamic changes of the front of water injection, water saturation of producing well, and swept volume during waterflooding under the condition of constant pressure, which substitutes for the condition of constant rate in the traditional way. Then, this method of calculating sweep efficiency is applied from single layer to multilayers, which can be used to accurately calculate the sweep efficiency of heterogeneous reservoirs and evaluate the degree of waterflooding in multilayer reservoirs. In the case study, the water frontal position, water cut, volumetric sweep efficiency, and oil recovery are compared between commingled injection and zonal injection by applying the derived equations. The results are verified by numerical simulators, respectively. It is shown that zonal injection works better than commingled injection in respect of sweep efficiency and oil recovery and has a longer period of water free production.


Author(s):  
Alfredo Rivera ◽  
Jacob Kashiwagi ◽  
Dean Kashiwagi

The State Agency is the regulatory agency responsible for ensuring quality of air, land, and water resources. Historically the State Agency has experienced difficulty in managing environmental professional services. To potentially address the issues, the State Agency tested a new approach to managing their projects, the Best Value Project Management Model (BV PMM), which focuses on using logic and natural laws instead of technical information and experience to improve project performance. This paper presents a case study on the State Agency’s implementation of the BV PMM on their indefinite delivery indefinite quantity (IDIQ) Water Quality contract that ran 60 individual projects. The main functions of the water quality unit program is to identify, assess and remediate sites that are contaminated with hazardous substances. This paper presents the BV PMM, its development, and documents the case study results after one year of implementation. Results include an improved PM utilization rate (22% increase), increase in vendor work performed (102%) in 33% less time, and increase in customer satisfaction (22%).


2012 ◽  
Vol 616-618 ◽  
pp. 1013-1016
Author(s):  
Bin Huang ◽  
Kao Ping Song ◽  
Kun Yang ◽  
Xu Su

In order to simulate heterogeneous reservoir, six parallel homogeneous cores are used to conduct laboratory experiments of polymer flooding after water drive and the indexes of shunt rate, water cut and recovery factor are compared under different alternating injection cycle of polymer flooding stages. The results show that, when the alternating injection cycle is 0.2PV, it can better restrain profile reversal in the process of polymer injection displacement and make profile reversal appear later. Meanwhile it can improve the sucking fluid proportion of low-permeability layer and make overall water cut stay at low point much longer and then get higher recovery factor.


Sign in / Sign up

Export Citation Format

Share Document