scholarly journals Detailed Study on Critical Delay Factors Affecting the Construction Industry

Author(s):  
Ravisankar K.L. ◽  
Bragateeswaran T

The Construction industry of India is an important indicator of the growth as it generates investment opportunities across various related sectors. Delay in construction projects is considered one of the most common problems causing a multitude of negative effects on the construction projects. Construction delays can be defined as the late completion of work compared to the planned schedule or contract schedule. Construction delays can be minimized only when their cause are identified. The objective of this study was to identify the major causes of construction delays. In this context the management of the delay may influence the financial performance of the project, since the overall value of contractual penalties may exceed ten percentage or more than that of the project budget. This study was carried out based on literature review and a questionnaire survey. The data for this study will be gathering through a detailed questionnaire survey. The questionnaire consists of total factors of seventeen group were contributed to the causes of construction delay based on literature review. In that seventeen groups have been consist of total 50 factors for delay. The questionnaire form is forwarded to various construction industries through email and in personal. The objectives of the study were successfully achieved. The top five most important factors that contributed to the causes of delays were Delay in financial support by owner to the contractor (Stage by stage payment), Design errors made by designers due to unfamiliarity with local conditions & environment, Equipment allocation problem, Poor site management & Inaccurate site investigation, Fluctuation of prices. To minimize delay in construction projects it has been identified that the top three effective methods of minimizing construction delays includes: site management and supervision, effective strategic planning, and clear information and communication channels.

2021 ◽  
Vol 9 (3) ◽  
pp. 52-57
Author(s):  
Yasir Mohamed Hassan Amin ◽  
Mohamed Abdulla Nugdalla Ahmedi

Quality management is considered one of the most important obstacles facing the construction industry in Sudan. The application of a quality assessment system contributes to the development of quality in projects as it is possible to measure the quality in projects. This paper aims to introduce one of the quality assessment systems, which is the system followed and applied in the Singapore (CONQUAS). This system assesses quality based on structural, architectural, mechanical and electrical work. The paper also aims to study the factors affecting the application of the quality assessment system in Sudan. The study is carried out in the region of Khartoum. The study is focusing on the construction projects. The study is carried out by questionnaires and other literature review. The respondents are consultants and contractors. The data has been distributed and analyzed by using the Average Index. From the study it was found that CONQUAS standard is assessed the building based on workmanship standards by the assessors from the BCA on site using standard score sheets. The assessment is done throughout the construction process for structural, mechanical and electrical works, and from questionnaire results the main factors affect construction industry in Sudan is lack of standardization in Sudan. The author recommended that more study shall be conducted to identify factors affecting quality in Sudanese construction industry and how to improve the quality.  


Author(s):  
Samiullah Sohu ◽  
Abdul Fattah Chandio ◽  
Kaleem ullah

The problem of delay in construction industry is a regular phenomenon worldwide, and construction industry of Pakistan has no exception, particularly in highways projects. Delay can be described as the extension of time to complete the construction project. The aim of this paper is to identify main causes of delays in highway projects of Pakistan, and to determine mitigating measures for the identified causes. The research method of this study is based on literature review, questionnaire survey and semi structured interview. From in-depth literature review, twenty-six common causes of delay were found. A questionnaire survey was carried out among construction professionals of highway projects. The causes of delay in highways projects were ranked referring to their Mean values. A semi structured interview was carried out to determine mitigation measures for the top ten causes of delays. The data gathered from questionnaire survey was analyzed using SPSS (Statistical Package for the Social Sciences) while, data collected through semi structured interviews was analyzed using Nvivo software. The findings of this study are expected to be useful for construction parties, to mitigate the delays in highway construction projects of Pakistan.


2013 ◽  
Vol 838-841 ◽  
pp. 3102-3108
Author(s):  
Boon Hoe Goh ◽  
Byung Gyoo Kang ◽  
Chung Lian Liew ◽  
Wee Kang Choong ◽  
Tuck Wai Yeong

Risk management is one of the most important areas in project management particularly in the construction industry. However it is not possible to analyze all of the potential risks as it will require too much time and effort. Therefore in order to identify and analyze the significant risks, the risks should be categorized and ranked. This research applied the concept of risk significance index score to construction projects in Malaysia. A comprehensive list of 40-potential risks has been developed through literature review and an interview survey. A questionnaire survey was conducted to produce project risk significance index score for the risks. The ranks of the risks have been identified and solutions for the significant risks have been produced through interviews. This research proves the practical use of risk significance index score for construction projects in Malaysia.


Author(s):  
Ahmed Salem Ahmed Marey Alhammadi ◽  
◽  
Aftab Hameed Memon ◽  

UAE construction industry frequently faces poor cost performance which commonly known as cost overrun problem. This problem is resulted from several factors and it is important to identify these cost overrun factors in order to avoid and minimize it. Hence, this paper focused on determined the relevancy of factors affecting cost performance in construction projects of UAE. Through a review of past research works conducted globally, 27 factors of cost overrun were listed and used for developing a structured questionnaire. A survey was conducted with 33 practitioners from client, consultant and contractors organizations involved in handling construction projects in UAE. The respondents were requested to state their perception regarding the relevancy of each of the factors that was perceived in context with cost overrun issue using 5-points Likert scale. The responses were analysed using average index method and the results found that all the 27 factors are relevant with construction industry of UAE in causing cost overrun. These factors can be used for further investigation to uncover critical problems of cost overrun.


2021 ◽  
Vol 14 (2) ◽  
pp. 62-70
Author(s):  
Huda Yaseen ◽  
Hafeth I. Naji

Construction projects are of a special nature affected by many factors, which makes them exposed to multiple risks that may lead to the abandonment of projects. Recently, the Iraqi construction sector is facing a number of problems. Abandoned construction projects are one of the most common and dangerous problems in the construction industry in Iraq, with their negative effects on stakeholders, the economy, and the environment due to the lack of sufficient financial and administrative capabilities to complete construction projects, which is reflected in exceeding the time limit for the completion of projects. The aim of this research is to use the analytic network process (ANP) technique to choose the best form of Public-Private Partnership (PPP) contracts to fund abandoned projects in Iraq. using a questionnaire survey to determine the most criteria and alternatives for selecting appropriate financing for the abandoned project. The results shown final weight of the Build-Own-Operate (BOO) contract from ANP is 0.533, which is the best form of PPP contract among the alternatives proposed to fund the project.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benti Gadisa ◽  
Hong Zhou

PurposeIt is well recognized that the construction industry is characterised by inefficient and ineffective service delivery due to various causative factors. Thus this study aims to examine the influential factors affecting public construction project performance in Ethiopia to improve the industry's service delivery.Design/methodology/approachFrom the extensive literature reviewed, 58 potential factors affecting construction project performance have been compiled. Based on the evidence accumulated, the conceptual model of this paper has been developed. By using survey questionnaires, valuable data were collected from the construction industry professionals in Ethiopia; analysed and interpreted with the use of both SPSS and AMOS software.FindingsIt is concluded that failure factors related to the “performance” of the contractor, the “capability” of the owner, the “project design-procurement process,” and project contract management can significantly contribute to the poor performance of public construction projects in Ethiopia. Ten key factors include inadequate contractor capacity, weak project site management and supervision, weak project management skills and capabilities of the owner, additional work orders, delayed payment, lack of comprehensive project plans between parties and incomplete project design, rising material prices, ineffective project schedules, and cost management, rising market prices and devaluation of the currency.Research limitations/implicationsThe scope of this study confined to public projects in Ethiopia. It suggests that further research needs to consider public and private construction from a comprehensive perspective in the developing countries.Practical implicationsIt provides practitioners with information and guidance on the factors that affect the performance of construction projects.Originality/valueIt provides inclusive evidence related to many factors that affect the performance of public construction projects.


2017 ◽  
Vol 22 (3) ◽  
pp. 252-268 ◽  
Author(s):  
Ernest Kissi ◽  
Theophilus Adjei-Kumi ◽  
Edward Badu ◽  
Emmanuel Bannor Boateng

Purpose Tender price remains an imperative parameter for clients in deciding whether to invest in a construction project, and it serves as a basis for tender price index (TPI) manipulations. This paper aims to examine the factors affecting tender price in the construction industry. Design/methodology/approach Based on the literature review, nine independent constructs and one dependent construct relating to tender pricing were identified. A structured questionnaire survey was conducted among quantity surveyors in Ghana. Partial least squares structural equation modelling (PLS-SEM) examined the influences of various constructs on tender price development (TPD) and the relationships among TPD and TPI. Findings Results showed that cultural attributes, client attributes, contractor attributes; contract procedures and procurement methods; consultant and design team; external factors and market conditions; project attributes; sustainable and technological attributes; and TPI have a positive influence on tender price, whereas fraudulent attributes exert a negative influence. Practical implications The findings offer construction professionals broader understanding of factors that affect tender pricing. The results may be used in professional decision-making in the pricing of construction projects, as they offer clearer causal relations between how each construct will influence pricing. Originality/value This study adds to the body of construction pricing knowledge by establishing the relationships and degree of influences of various factors on tender price. These findings provide a valuable reference for practitioners.


2021 ◽  
Vol 9 (3) ◽  
pp. 45-51
Author(s):  
M. S.M. Ali ◽  
O. M. Ahmed

This paper aims to study the humanitarian risks in construction projects that affect the objectives of the project from time, cost and quality, and to identify, analyze and develop the appropriate strategy, monitor and control and specifically the risk of factors affecting construction projects. A questionnaire was designed to collect data and identify risks in construction projects and then distributed to several public and private sector companies registered with the Organizing Council for engineering works contractors in Sudan, and after the risks facing the construction projects were identified through the questionnaire and telephone interviews with The engineers and managers of these companies, these risks were analyzed by Google Form. The results of the questionnaire showed that inflation, increased prices of materials in the market, weak site management, delayed payments from the contractor and awarding the design to unqualified designers, that is the most important factors affecting the objectives of construction projects in Sudan, and the contractor is the most vulnerable among the parties to the project.  


Author(s):  
Ajit Ambekar

Productivity is important in construction. Construction productivity is a significant part of production for construction projects. In the construction industry, many external and internal factors are never constant and difficult to predict. This factor leads to a constant change in productivity. It is necessary to make sure that the reduction of construction productivity does not affect the plan and work schedule and does not cause delays. The consequences of these delays can lead to serious loss of money. In addition, significant costs can be saved if productivity is improved, as the same work can be done with less labor, thereby reducing the total cost of construction.


Author(s):  
Taofeeq Moshood ◽  
◽  
Adekunle Adeleke ◽  
Gusman Nawanir ◽  
Jibril Bamgbade ◽  
...  

One of the critical factors responsible for the successful management of construction projects is individual factors. These factors play a significant role in the decision-makers' attitudes towards risks management. Many previous studies regarding the management of construction projects have focusedon the factors contributing to the success of risk management. However, little attention has been given to factors severely affecting the decision-makers' risk attitudes with particular reference to an individual's risk factors in the construction industry. Therefore, this study aims to identify the factors affecting contractors' risk attitudes and then determine its relationship with government policy. Theoriesof planned behaviour and organisational control wereused to develop the theoretical framework that investigated G-7 contractors in the Kuantan Pahang, Malaysian construction industry. A review of relevant literature and questionnaire was employedto identify the factors affecting contractors' risk attitudes (personal factors). 112copies of a structured questionnaire were analysed with a response rate of 80%. Structural Equation Modelling SEM was utilised to test the hypotheses developed for the study. The results of this study,through SEM,proved that personal factors (working experience, professional competence and physical health) have a significant influence on contractor risk attitudes in the Malaysian construction industry. The findings of this research also confirm that government policy (rules and regulations) plays a moderating role in enhancing the relationship of personal factors affecting contractors’ risk attitudes in construction companies in Malaysia. The findings of the study provide more understanding of the personal factors that affect contractors' risk attitudes to facilitate contractors' decision-making process and serve as a useful reference for further studies in the field of construction project management.