scholarly journals Perancangan Tata Letak Stasiun Kerja dengan Menggunakan Metode Systematic Layout Planning

2021 ◽  
Vol 5 (2) ◽  
pp. 118
Author(s):  
Elfania Hartari ◽  
Dene Herwanto

PT. Adhimix Precast Indonesia is engaged in the construction sector by producing concrete and construction. Layout design is needed so that the existing land can be utilized optimally and material transfer is more effective and efficient. This can affect the distance and time of the transfer so that the cost of moving can be minimized. In practice, the company's trajectory condition only has one path (trajectory) for alternating current and crossing production lines, so it is considered inefficient to move both goods and workers, coupled with the existence of land that is not used properly, therefore improvements are needed to the production floor layout. in order to minimize the cost of moving goods and have a definite path (trajectory). Systematic Layout Planning (SLP) is a method for redesigning a layout (re-layout) based on the results of distance optimization and Material Handling Costs (OMH). The amount of OMH in the initial layout (now) is Rp. 2,614,200 with a total track distance of 39.82m and OMH in the proposed layout with a total track distance of 19.17m, the result is Rp. 1,534,200, this proves that the proposed layout can be applied because there is a decrease in total OMH by 35.44% or Rp. 926,580. PT. Adhimix Precast Indonesia bergerak di bidang pembangunan dengan memproduksi beton dan konstruksi. Perancangan tata letak diperlukan agar lahan yang ada dapat dimanfaatkan dengan maksimal dan pepindahan material lebih efektif dan efisien. Hal ini dapat mempengaruhi besar jarak dan waktu perpindahan sehingga besar biaya perpindahan dapat diminimalkan. Pada pelaksanaannya kondisi lintasan perusahaan hanya memiliki satu jalur (lintasan) untuk arus bolak balik dan persilangan alur produksi maka dianggap tidak efisien untuk dilakukan perpindahan baik barang maupun pekerja, ditambah dengan adanya lahan yang tidak dimanfaatkan dengan baik oleh karena itu dibutuhkan perbaikan pada layout lantai produksi agar dapat meminimalkan biaya perpindahan barang dan memiliki jalur (lintasan) yang pasti. Systematic Layout Planning (SLP) merupakan metode untuk membuat perancangan ulang suatu layout (re-layout) berdasarkan hasil dari optimalisasi jarak dan Ongkos Material Handling (OMH). Besar OMH pada layout awal (sekarang) adalah Rp 2.614.200 dengan total jarak lintasan 39,82m dan OMH pada layout usulan dengan total jarak lintasan 19,17m didapat hasil sebesar Rp. 1.534.200, hal ini membuktikan bahwa layout usulan dapat diterapkan karena terjadi penurunan total OMH sebesar 35,44% atau Rp. 

2018 ◽  
Vol 2 (1) ◽  
pp. 45
Author(s):  
Dede Muslim ◽  
Anita Ilmaniati

Abstract – Unplanned layout and inefficient material flow between work units can lead to increased cost. PT Transplan Indonesia's current material flow path is inefficient with material flow distance 115.5 meters and material handling cost that has not been taken into account. This study aims to find out how big the role of facility layout design in cutting the distance of material transfer and pressing the cost of material handling. The method used in this research is Systematic Layout Planning (SLP) approach, which is comparing the distance of material transfer between initial layout with proposed layout. The results of this study indicate that the distance of the material flow path on the production floor with proposed layout changed to 71,7 meters, with material handling cost per meter reduced from Rp. 1,105,954 to Rp. 712,402 or decrease as much as 35%. Based on the results of the research, the layout of the proposal is considered more effective and efficient because it can reduce the distance of material transfer and reduce the cost of material handling on the packing/shipping floor.Keywords: Layout Design; Material handling cost; Systematic Layout Planning (SLP)


Author(s):  
Nur Kalim ◽  
Lukmandono

Factors that influence the amount of material handling costs are the distance of material movement, methods, and tools (equipment) used. The distance of material movement is strongly influenced by the layout of the production facility. The new layout design using the SLP method is expected to reduce the distance of material or product movement in PT. A B C. From the analysis results obtained the total distance of material transfer at the initial layout of the production process at PT. ABC of 1761 meters / month with material handling costs of Rp. 315,390,000.00 / month. Then an analysis of the use of material transport equipment results in the replacement of a crane with a sloping plane to connect the production machine. So the cost of material handling using the inclined plane becomes Rp. 0. The use of sloping fields can only be used on certain production machines. By using the Systematic Layout Planning (SLP) method, there are 3 alternative layouts produced. The most optimal alternative layout is alternative layout 3 with monthly material handling cost savings of Rp. 68,100,000.00 or 21% of the initial material handling layout cost.


2021 ◽  
Vol 16 (Number 1) ◽  
pp. 57-68
Author(s):  
Bambang Suhardi ◽  
Lulu Elvira ◽  
Rahmaniyah Dwi Astuti

Good equipment and product design are meaningless if there is no good layout planning. Problems owned by PT. Pilar Kekar Plasindo occurs in the production of small polyethylene. This is because small polyethylene production has large material total transfer distance. Small polyethylene problems include the distance between stations, cross-movement, backtracking, and the broken machine that is still placed in the production section. These conditions make the material handling costs and distance large. Therefore, this research aims to produce a layout design of production facilities that can minimize the distance and cost of material movement. The method used in this study is Systematic Layout Planning (SLP). Three alternative designs were compared, and the second proposed facility layout was chosen because it can reduce the total cost of material transfer by 68.3% and reduce the distance of material transfer by 59.6% from the initial facility layout.


2021 ◽  
Vol 10 (2) ◽  
Author(s):  
Beni Harma ◽  
Helga Ika Sudra

Activities carried out in the warehouse include material handling. Generally, the costs involved in material handling activities are quite large. One method that can be used in managing the layout of raw material placement in raw material warehouses is the class based storage method. Class based storage is a policy that divides storage into three classes A, B and C based on Pareto law. Pareto law is the principle of putting items that have the greatest accessibility near the Input-Output point. The distance of material handling to the initial layout raw material warehouse is 3,513,337 meters / month and the material handling costs are Rp. 134,534,765 / month, because the initial layout of the raw material warehouse still uses random storage and the raw materials that are widely used are not placed close to the intake floor of the production, so that the distance to get raw materials for production needs is far. After the re-layout design was made based on the placement of raw materials in the class based storage method, the material handling transfer distance was reduced to 2,644,459 meters / month and the material handling cost for the repair raw material warehouse layout fell to Rp. 99,949,520 / month. In other words, there was a decrease in material handling distance by 25% and material handling costs by 26%.


2020 ◽  
Vol 1 (4) ◽  
pp. 448-456
Author(s):  
J Tampubolon ◽  
L D Agoestine Simangunsong ◽  
M D Agustina Sibuea ◽  
A C Sembiring and A Mardhatillah

Abstract. The facility layout is a strategic design that is used for a long time. All manufacturing industries must pay attention to the right layout to increase the productivity of the industry. A prayer paper manufacturing industry located in the Tanjung Morawa area, Medan has an error in the placement of raw materials and the placement of production machines, so that the distance from the temporary warehouse to the printing and cutting work stations is far apart, causing high material handling costs. Seeing these problems, research was carried out to improve the layout of the facilities and redesign. The method used for this research is Systematic Layout Planning (SLP), which is one of the methods used to regulate a workplace in a factory by using two areas with high frequency and logical relationships with each other. And the Computerized Relative Allocation of Facilities Technique (CRAFT) Algorithm is a repair program, which is a program that looks for optimal design by making gradual improvements to the layout. CRAFT evaluates the layout by interchanging departmental locations. Inputs required for the CRAFT algorithm include initial layout, data flow or frequency of movement, cost data per unit distance, and the number of departments that do not change or remain. The CRAFT method is usually applied using Quantitative Systems (QS) software. By comparing the layout between SLP and CRAFT, the optimal result is obtained using the SLP method by reducing the distance between departments by 1.407 meters or a distance efficiency of 39.91%.


Jurnal Teknik ◽  
2019 ◽  
Vol 8 (1) ◽  
Author(s):  
Tina Hernawati Suryatman ◽  
Hartono Hartono ◽  
Rifqi Maulana Fadil

PT. AP Tbk. A company engaged in the integrated textile industry, one of the companies that produce various types of high-quality production in yarn manufacturing. Problems that occur at PT. AP Tbk. Superior in yarn processing facilities. In the layout production facility has not been used optimally, location settings are not optimal. found a step back that caused the distance to be far away. For that, it is necessary to restructure the layout of these machines so that the total distance of material handling is faster. Based on the results of research and data processing using a systematic Layout Lay out method, the layout is more efficient when compared to the layout before repair. With the SLP method, two alternative layout locations are produced which can minimize the distance of the material flow and the cost of material handling. Layout 1 can save a distance of 45 meters by issuing material handling costs of 3881.52 rupiah from the initial layout, while layout 2 can save a distance of 57 meters by looking for material handling costs of 4744.08 rupiah from the initial layout. Thus, layout 2 is more recommended so that activities and production results are more optimal and handling of cost material becomes smaller.


2020 ◽  
Vol 6 (1) ◽  
pp. 1
Author(s):  
Kuswanto Kuswanto ◽  
Juan Junius ◽  
Anita Christine Sembiring

Facility layout is integrated planning of the flow of a product in an operating system to obtain the most effective and efficient interrelation between workers, materials, machinery, and equipment as well as handling and transferring materials. A company engaged in furniture manufacturing has a problem in its production process, namely, the distance between machines is too far so that it affects the cost of handling materials. Distant workstations are found on profile machines, milling machines, measuring machines, cutting machines. Therefore, improvements must be made to the layout of facilities on the production floor so that facility layout is efficient and material handling costs are reduced. The problem-solving approach used is the Graph Method and CRAFT Algorithm. The results of the research show that material handling costs are reduced by 7.58% or Rp. 17,765 using the CRAFT algorithm.


2021 ◽  
Vol 251 ◽  
pp. 03097
Author(s):  
Lijie Zhao

It has become the main way for heavy industry enterprises to decrease the cost to excavate “logistics resources” according to the Systematic Layout Planning (SLP). Taking the new tool shaft machining workshop of Luoyang yituo zhongcheng machinery co., LTD. as an example, through the method of field investigation and visit, we get the data of the process flow, material handling, the relationship between each process and the general situation of the new workshop. The SLP method is used to divide the work units in the workshop, analyze the relationship between logistics and non-logistics among each work unit, determine the comprehensive relationship between each operation unit, and make the position correlation diagram. Besides, we also combine the current situation of the workshop to sort out the layout scheme to reduce the production costs of the workshop.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Michael C.P. Sing ◽  
Ivan W.H. Fung ◽  
David John Edwards ◽  
Henry Liu

PurposeThis paper develops a platform that can be used to determine how to effectively and efficiently deal with a large number of temporary facilities under a constrained site condition(s). The ultimate goal is to reduce the material handling costs between transformation phases of construction works occurring during the project's development period.Design/methodology/approachEmpirical and deductive research is first adopted to mathematical model dynamic site layout planning using the branch and bond algorithm (B&B). Second, a real-life construction project is examined to illustrate how dynamic site layout planning (using the aforementioned B&B algorithm and a computer software program called LINGO) can reduce the material handling costs. The application of the proposed methodology is then showcased against a case study that utilizes a comparative analysis between the “dynamic” and “statistic” site planning approaches.FindingsBy dividing the construction period into different phases, the developed model is shown to be capable of optimizing the material handling costs between the phases of transformation during construction works. Optimal costs are also considered using the site boundary and unit cost for moving construction materials between two facilities. The comparative analysis results illustrate that the B&B algorithm reduces material handling costs by 33%.Practical implicationsThe proposed model offers an effective planning algorithm for the site layout and location of temporary facilities. More specifically, it can make a substantial improvement in reducing the travel time and material handling cost between the temporary facilities in the construction sites.Originality/valueThe primary knowledge contribution of this study to the site layout is successfully deal with the unequal area problem of temporary site facilities and incorporates the concept of dynamics site planning into the algorithm.


Sign in / Sign up

Export Citation Format

Share Document