scholarly journals Engineered Resilient System Life Cycle Costing Model

2016 ◽  
Vol 4 (2) ◽  
pp. 149-155
Author(s):  
Allen Blash ◽  
William Butler ◽  
Lindy Clark ◽  
Kyle Fleming ◽  
LTC Jennifer Kasker

In order to make the best use of the defense spending budget, it is critical that the Department of Defense (DoD) accurately predict the Research, Development, Test and Evaluation (RDT&E), Procurement, and Operation and Support (O&S) costs down to the third level of the Work Breakdown Structure for Major Defense Acquisition Project (MDAP) wheeled or tracked vehicles. This research utilizes historical data, extracted from government databases, to develop cost estimating relationships (CERs) that predict the life cycle cost of wheeled and tracked vehicles based on attributes. This research can also be leveraged for defense acquisition programs across the DoD portfolio. The model will be integrated into a tradespace analysis tool, ERS & CREATE-GV, which was developed by ERDC to predict the cost of each alternative created in the tradespace.

2014 ◽  
Vol 638-640 ◽  
pp. 2370-2376
Author(s):  
Yan Zheng ◽  
Di Su ◽  
Xu Wang ◽  
Yu Cai

Life Cycle Cost of Construction engineering project management is a combination of modern management theory—system theory, cybernetics and information theory combined with the construction project. In this paper, a model of substation life cycle cost is built comprehensively, by making a model for the cost estimating of substation design and construction cost. Meanwhile, the operation loss, operation maintenance cost are analyzed and calculated, the estimate of the retirement costs is carried on. On these basics, analyzes the relationship between the cost, then the numerical example is given ultimately. Eventually, optimal reliability and economical efficiency is achieved.


2021 ◽  
Vol 11 (4) ◽  
pp. 1423
Author(s):  
José Manuel Salmerón Lissen ◽  
Cristina Isabel Jareño Escudero ◽  
Francisco José Sánchez de la Flor ◽  
Miriam Navarro Escudero ◽  
Theoni Karlessi ◽  
...  

The 2030 climate and energy framework includes EU-wide targets and policy objectives for the period 2021–2030 of (1) at least 55% cuts in greenhouse gas emissions (from 1990 levels); (2) at least 32% share for renewable energy; and (3) at least 32.5% improvement in energy efficiency. In this context, the methodology of the cost-optimal level from the life-cycle cost approach has been applied to calculate the cost of renovating the existing building stock in Europe. The aim of this research is to analyze a pilot building using the cost-optimal methodology to determine the renovation measures that lead to the lowest life-cycle cost during the estimated economic life of the building. The case under study is an apartment building located in a mild Mediterranean climate (Castellon, SP). A package of 12 optimal solutions has been obtained to show the importance of the choice of the elements and systems for renovating building envelopes and how energy and economic aspects influence this choice. Simulations have shown that these packages of optimal solutions (different configurations for the building envelope, thermal bridges, airtightness and ventilation, and domestic hot water production systems) can provide savings in the primary energy consumption of up to 60%.


Author(s):  
Kosuke Ishii ◽  
Cheryl Juengel ◽  
C. Fritz Eubanks

Abstract This study develops a method to capture the broadest customer preference in a product line while minimizing the life-cycle cost of providing variety. The paper begins with an overview of product variety and its importance in overhead costs: supply chain, equipment and tooling, service, and recycling. After defining the product structure graph as a representation of variety, the paper introduces an approximate measure for the customer importance and life-cycle cost of product variety The cost measure utilizes the concept of late point identification which urges standardization early in the manufacturing process and differentiation at the end of the process. The variety importance-cost map allows engineers to identify cost drivers in the design of the product or the manufacturing system and seek improvements. The refrigerator door example illustrates the concept. On-going work seeks to validate and enhance the method with several companies from different industries.


Author(s):  
Wai M. Cheung ◽  
Linda B. Newnes ◽  
Antony R. Mileham ◽  
Robert Marsh ◽  
John D. Lanham

This paper presents a review of research in the area of life cycle costing and offers a critique of current commercial cost estimation systems. The focus of the review is on relevant academic research on life cycle cost from 2000 onwards. In addition to this a comparison of the current cost estimation systems is presented. Using the review findings and industrial investigations as a base, a set of mathematical representations for design and manufacturing costs and the introduction of the critical factors is proposed. These are considered in terms of the operational, maintenance and disposal costs to create a method for ascertaining the life cycle cost estimate for complex products. This is presented using as an exemplar, research currently being undertaken in the area of low volume and long life electronic products in the UK defence sector. The benefit of the method proposed is that it aims to avoid the inflexibility of traditional approaches which usually require historical and legacy data to support the cost estimation processes.


2016 ◽  
Vol 2016 ◽  
pp. 1-10 ◽  
Author(s):  
Sung-Min Choi ◽  
Yeon-Sil Lee

Currently, repair and maintenance cycles that follow the completion of construction facilities lead to the necessitation of subsequent data on the analysis of study and plan for maintenance. As such, an index of evaluation was drafted and a plan of maintenance cycle was computed using the investigation data derived from surveying target housing units in permanent rental environmental conditions, with a minimum age of 20 years, and their maintenance history. Optimal maintenance and replacement methods were proposed based on this data. Economic analysis was conducted through the Risk-Weighted Life Cycle Cost (RWLCC) method in order to determine the cost analysis of maintenance life cycle methods used for repair. Current maintenance cycle methods that have been used for 20 years were also compared with alternative maintenance cycles.


2021 ◽  
pp. 1-4
Author(s):  
Heinz P. Bloch ◽  
Allan R. Budris

2017 ◽  
Vol 5 (2) ◽  
pp. 15 ◽  
Author(s):  
Stanislav Szabo ◽  
Ivan Koblen

<p align="LEFT">The paper in the introductory part underlines some aspects concerning the importance of Aviation Technology Life Cycle Management and informs on basic international standards for the processes and stages of life cycle. The second part is focused on definition and main objectives of system life cycle management. The authors subsequently inform on system life cycle stages (in general) and system life cycle processes according to ISO/IEC/IEEE 15288:2015 standard. Following the fact, that life cycle cost (LCC) is inseparable part and has direct connection to the life cycle management, the paper contains brief information regarding to LCC (cost categories, cost breakdown structure, cost estimation a.o.). Recently was issued the first part of Aviation Technology Life Cycle Management monograph (in Slovak: ”Manažment životného cyklu leteckej techniky I”), written by I.Koblen and S.Szabo. Following this fact and direct relation to the topic of article it is a part of article briefly introduced the content of two parts of this monograph (the 2nd part of monograph it has been prepared for the print). The last part of article is focused on issue concerning main assumptions and conditions for successful application of aviation technology life cycle management in aviation companies, aerospace industry organizations as well as from the relevant stakeholders side.</p>


2012 ◽  
Author(s):  
Jin How Ho ◽  
Azlan Abd. Rahman

Artikel ini membincangkan kajian ringkas berkaitan analisis kos kitaran hayat terhadap langkah-langkah pembaikan pengaratan bagi jambatan dan struktur marin konkrit yang terdedah kepada karbonasi atau serangan natrium klorida daripada air laut atau sumber-sumber lain. Perisian kos kitaran hayat, Bridge LCC 2.0 digunakan untuk menjalankan analisi kitaran hayat untuk tiga kes kajian melibatkan kaedah nilai bersih kini. Keputusan kajian menunjukkan analisis kos kitaran hayat berkeupayaan untuk membantu jurutera dan agensi pengangkutan dalam menilai keputusan penyelenggaraan yang efektif berkaitan dengan masalah pengaratan. Ia boleh digunakan sebagai alat analisis ekonomi kejuruteraan yang membantu mantaksir kos-kos perbezaan dan membuat pilihan terhadap langkah pembaikan pengaratan yang berkesan. Analisis kos kitaran hayat bagi langkah pembaikan dipengaruhi oleh banyak pemboleh ubah seperti kos permulaan, kos penyelenggaraan, tahun kekerapan, dan jangka masa analisis. Amalan terbaik untuk analisis kos kitaran hayat bukan sahaja mengambil kira perbelanjaan oleh agensi, tetapi perlu mempertimbangkan kos-kos oleh pengguna dan analisis sensitiviti di sepanjang jangka hayat sesuatu langkah pembaikan. Kata kunci: Analisis kos kitaran hayat, jambatan konkrit, pengaratan, langkah, pembaikan, pemulihan struktur, keberkesanan kos, kaedah nilai bersih kini (NPV) This paper discusses a short study on life cycle cost analysis (LCCA) on corrosion remedial measures for concrete bridges and marine structures, which are subjected to carbonation or ingress of sodium chloride from sea water and other sources. Life cycle costing software, Bridge LCC 2.0, was used to perform life cycle cost analyses on three case studies, based on net present value method. The analysis of the results showed that LCCA is capable of assisting engineers or transportation agencies to evaluate optimum maintenance decisions in corrosion–related problems. It can be used as an engineering economic analysis tool that helps in qualifying the differential costs and choosing the most cost–effective corrosion remedial measures. Life cycle costs for the remedial measures are influenced by many costing variables such as initial costs, periodic maintenance costs, frequency years and analysis period. The best practice of LCCA should not only consider agency expenditures but also user costs and sensitivity analysis throughout the service life of a remedial measure. Key words: Life cycle analysis, concrete bridges, corrosion, remedial measures, structural rehabilitation, cost-effective, net present value method (NPV)


1978 ◽  
Vol 22 (1) ◽  
pp. 267-271
Author(s):  
F. Thomas Eggemeier ◽  
Gary A. Klein

Life cycle cost estimates of training equipment for F-16 Avionics Intermediate Station personnel were developed. The major purpose was to compare the cost of intermediate level maintenance training when conducted on simulated vs actual avionics test equipment. This was the initial phase of a planned two-part effort. The analysis was therefore limited to estimates of training device acquisition and maintenance costs. Total estimated fifteen year costs for simulated equipment trainers were approximately 50% less than comparable estimates for actual equipment trainers.