Determining the Relationship between Time of Construction and Cranes Organization by Applying the Bees Algorithm for Reducing the Time of Construction of Houses
Keyword(s):
You can get a wide range of strong cranes able to lift and move heavy weights with constant acceleration, that result in an optimization in the construction time. However, it is possible that factors such as lack of cranes, incorrect cranes for work, lack of coordination, lack of communication, which result in a material is two transportation or more times occur, that once a job is done when another crane at the same time could be doing the following process. This is known as deferred construction time.