Research on the Centralized Procurement Mode of Construction Projects Materials

2012 ◽  
Vol 193-194 ◽  
pp. 333-336
Author(s):  
Li Xin Li ◽  
Yi Bo Zhang ◽  
Hao Sun

Aim: To strengthen management cost of construction projects, reduce procurement cost of materials, guarantee materials quality and to promote the profitability of the project. Approach:Adopt scientific centralized procurement implemented by construction enterprise headquarter.Result: It not only reduces materials procurement cost, but also improves the quality of procurement, which, guarantee the project quality and promote the profitability of both the project and the enterprise that carries it out. Conclusion: The centralized procurement mode of construction project materials can effectively reduce construction cost and promote the profitability of both the project and the enterprise that carries it out.

2017 ◽  
Vol 5 (1) ◽  
Author(s):  
I Gde Eka Dharsika ◽  
IN Budiartha ◽  
I W Yansen

Abstract: Problems in construction projects caused by the extension of working time and an increase in labor costs. A limited ability of project management contribute to the decline in the quality of project work. The quality of project manager has an important role to smooth a construction project. Dedication in this profession requires project managers to carry out the work going according to plan. Analyzing the quality of the project manager for the implementation of construction projectsis one wayto measure the quality of a project. It needs  a right measurements way to providean accurate assessment of qualified and reliable project managers. This study aimed to obtain and analyze the factors that affect the quality of the project manager and its to construction projects.This used a sample of 45 respondents from several construction projects in the area of Badung and Denpasar during the period 2007-2012. The method used in this study is the method of multiple linear regression analysis by testing for the F-test and t-test. The results found 8 dominant factor that has a value eigen values??> 1. Sequentially, the factors that have been named are experience 41.63%,  education 9.278%, knowledge 7.240%, ability 5.088%, character 4.047%, network 3.843%, relationship communication 3.550%, confidence 3.357%. Influence the quality of the project manager on the performance fee of 51.9%, against 43.1% for quality performance, on-time performance, with a value of 57.9%. The results of this study prove that the powerful influence between the quality of the construction project manager to the implementation of construction projects.


2019 ◽  
Vol 277 ◽  
pp. 03013
Author(s):  
Noraziah Mohammad ◽  
Zabidi Hamzah

Variation order refers to any changes from the scope, plan, specification or contract document in the construction project. This changes of work is a common problem in construction projects in Malaysia. It is inevitable in any construction project and this problem can become more serious when variation order causes work progress to be impaired as a results it increased the construction time and cost that affects the construction industry in Malaysia. This paper critically review the causes of variation order in the construction industry on the double-storey terrace housing project in Malaysia. The discussions began with the construction industry in Malaysia and then related parties involved in the construction industry. The extensive local and abroad literature review on the definitions of variation order and analysis of past studies conducted on variation order and the previous study of the prediction model of variation. The extensive literature on variation order in the construction of building project may help to improve the performance in term of time, cost and quality of the construction of building projects in Malaysia.


2021 ◽  
Vol 263 ◽  
pp. 05048
Author(s):  
Maria Bovsunovskaya

The study is devoted to substantiating the need to develop a cost controlling system in order to improve the efficiency of investors, developers, customers, general contractors, as well as representatives of the banking system who are directly involved in the implementation of investment and construction projects. The paper summarizes the innovations of the Ministry of Construction, Housing and Utilities of the Russian Federation in the field of determining the cost of construction at the stages of the life cycle of an investment and construction project, and suggests their adaptation to the activities of commercial customers. The factors of the rise in the cost of construction in the modern conditions of the investment and construction sphere are systematized, including topical issues of the rise in cost due to the increase in prices of building materials. The main risks arising from the implementation of the project associated with an increase in cost are highlighted. As the results of the study, stages of construction cost control with a description of their content and a system of cost controlling of an investment and construction project are proposed.


2020 ◽  
Vol 5 (9) ◽  
pp. 1049-1053
Author(s):  
Onyekachukwu G. Odenigbo ◽  
Koleola T Odusami ◽  
Kevin C. Okolie ◽  
Vincent C. Okafor

Delay in payment to contactors and other relevant parties have caused serious problem on the successful execution of construction projects in the country. It causes several problems to the contractor and other participants. The aim of this study is to determine the causes of delayed payments in the construction industry. The objective of this study is to identify the causes of delayed payment. In order to obtain valid data for the study, questionnaires were designed and distributed to a randomly selected sample of one hundred individuals among contractors, subcontractors, consultant and clients in the Nigerian construction industry. In total, eighty five completed questionnaires were returned and then analysed statistically. The total mean score was used to determine the ranking of the results of the study. Client’s disagreeing on the valuation of work done, slow processing of variation orders and poor quality of works were the major causes of delayed payment identified in the study. It was recommended that the stakeholders should work as a team in the execution of project to avoid bottlenecks usually encountered in agreeing contractors‟ payment. In conclusion, if the necessary action can be enforced, the problem of delayed payment can be reduced drastically.


Author(s):  
Meili Wu

Bidding is a key link during the implementation of a construction project. For the same construction project, there are usually multiple construction companies bidding together to obtain the right to contract for the project. However, there are still various irregularities in the bidding stage. This article analyzed the above problems and proposed a management strategy for the optimization of bidding, looking forward to improving the quality of bidding management of construction projects, solving various illegal bidding problems, and purifying the environment of bidding management.


2018 ◽  
Vol 65 ◽  
pp. 03004
Author(s):  
Muhamad Azry Khoiry ◽  
Suhaniya Kalaisilven ◽  
Azlina Abdullah

Construction is an important industry to determine the development of a country. However, this industry faced delay issues caused by various factors that affect proper construction project. Hence, minimizing delay in construction should be focused on overcoming the delay issue. Thus, the objective of this study is to critically review the main criteria of minimizing delay based on the most significant items that suggested in the previous journals. This paper reviewed 47 journals that studied the issues of delays in construction projects. Through this study, the authors have classified four main criteria for minimizing delays, which are; management, interpersonal, technical and technology. Management ensures the proper manage of time, financial and control system in construction to minimize delay. While, interpersonal promote a good relationship between construction parties, hire of competent and skilled labour and responsibility of the owner to avoiding delay. Besides, technical ensure the quality of project and technology could improve the productivity of construction based on fourth industrial revolution development in the construction field. Thus, this study contributes to construction parties able to focus on elements to overcome the delay issue in they faced and applied the ideas based on the element to minimize delay in the construction project.


2016 ◽  
Vol 4 (2) ◽  
Author(s):  
I Putu Widyarsana ◽  
N. Martha Jaya ◽  
Gd. Astawa Diputra

Abstract Badung regency in Bali, where the tourism industry is growing very rapidly. Building continues to grow, such as hotels, villas, resorts, hospitals, and so forth. Implementation of building construction projects in Badung not be separated from the issue of costs, quality of execution and completion time of the project. These problems arise due to lack of skills / competencies project manager of the responsibility to integrate and coordinate all available resources for the achievement of project objectives. In this case the role of Project Manager will determine the success of a project. So, there should be a study of the basic capabilities that must be owned by the Project Manager, among others: Conceptual Skills, Technical Skill, and Soft Skills. Data collection is done by the method of observation and surveys. Factor analysis was conducted to identify factors / characteristics Project Manager that affect the quality of the construction project implementation performance. Multiple linear regression analysis determined the relationship of the performance characteristics of the project manager building construction projects in Badung. Factor analysis resulted in the identification of 22 variables that affect the quality of the building construction project implementation performance. Multiple linear regression analysis determines the characteristics of the Project Manager greatest influence on the quality of the building construction project implementation performance is Social Skills aspect of 33.08% compared to the other two aspects, namely the conceptual skills (32.10%) and Technical (9.40%) . The total value of the influence of the three aspects of the characteristics of the project manager of 74.58% means that there are still approximately 25.42% influenced by other factors, such as the state of nature, the environmental situation, location, and so on, the implementation of building construction projects in Badung.


2020 ◽  
Vol 12 (24) ◽  
pp. 10376
Author(s):  
Sławomir Wawak ◽  
Žanesa Ljevo ◽  
Mladen Vukomanović

Project management frameworks describe the preferred approaches to project quality management, as well as applicable methods and tools. Despite this, quality problems in the construction project are still widespread. This study aimed to identify crucial quality-related factors in construction project management and find relations between them, to help researchers and project managers better respond to quality issues. A systematic literature review (SLR) was used to identify previous studies on quality-related factors. Literature review and further quantitative analysis revealed that quality-related factors are related to three categories: Quality of project process, quality of organisational processes, and quality of results (products), which together create the quality of the whole construction project. The results highlight quality-related factors (14 related to the quality of processes, 6 to quality of an organisation, and 13 to quality of products) that should be taken into account in further research, as well as planning and executing construction projects. Their inclusion at the planning stage should help project managers, sponsors, and steering committees avoid or minimise quality-related problems. Moreover, this study sheds an interesting light on quality. We found that the quality of processes and quality of an organisation has precedence over the final product quality. Based on the results of the study, structural equation modelling (SEM) was used to create a null model that will be the starting point for further research in the construction enterprises.


Author(s):  
Tomáš Mandičák ◽  
Peter Mesároš ◽  
Mária Kozlovská

Abstract The issue of cloud computing is a highly topical issue. Cloud computing represents a new model for information technology (IT) services based on the exploitation of Web (it represents a cloud) and other application platforms, as well as software as a service. In general, the exploitation of cloud computing in construction project management has several advantages, as demonstrated by several research reports. Currently, research quantifying the exploitation of cloud computing in the Slovak construction industry has not yet been carried out. The article discusses the issue of exploitation of cloud computing in construction project management in Slovakia. The main objective of the research is to confirm whether factors such as size of construction enterprise, owner of construction enterprise and participant of construction project have any impact on the exploitation level of cloud computing in construction project management. It includes confirmation of differences in use between different participants of the construction project or between construction enterprises broken down by size and shareholders.


2018 ◽  
Vol 7 (4.35) ◽  
pp. 307 ◽  
Author(s):  
N.S. Azman ◽  
M. Z. Ramli ◽  
M. H. Zawawi

Quality management is essential to improve success in project implementation by using Industrialized Building System (IBS). The development of construction industry in Malaysia is encountering a relocation from ordinary techniques to a more efficient and automated strategy which is by utilizing IBS.There are a few issues in overseeing IBS construction projects which prompt low qualities such as hiring non-expertize in construction, using low quality of materials and problem with management. Therefore, this paper aim is to determine the various success factors affecting the quality management of construction project that using IBS and ranked the success factors. Found that 87 factors from review papers and two most significant factors affecting quality management in IBS are high ranked which is appointment of high experience technical team, using high quality components and materials with overall percentage 2.48% and 1.86%. However, some of the factors are repeatedly listed due to high affecting to quality.