Status and Psychology of DBB and BOT Construction Project Participants

2011 ◽  
Vol 71-78 ◽  
pp. 160-166
Author(s):  
Wen Hao Leu ◽  
Andrew S Chang

Adopting the BOT (build-operate-transfer) delivery method for construction projects has brought opportunities for desired performance. Studies have investigated many issues of BOT projects such as concessionaire selection criteria or risk factors, but the soft issue of the status and psychology change of project participants from traditional DBB (design-bid-build) method is not investigated. This research explored the status and psychology of DBB and BOT project participants and drew implication for performance. By using the case study method, this study selected ten projects in which five from DBB and five from BOT methods; interviewed 36 owners, designers, constructors and other participants in 14 times; and analyzed and compared their design and construction work interaction, designer and constructor status, and owner and concessionaire psychology. It is found that for DBB civil projects performance would be stable because of completed design, more cautious owner, and respected designer that is good to performance. For BOT civil projects, performance would vary and the designer and constructor can better cooperate. The flexibility and vitality brought by the BOT mechanism should be better used to create better performance.

Author(s):  
Azizul Hassan ◽  
Mizan Rahman

Purpose – The purpose of this paper is to argue that the World Heritage Site (WHS) status as a label plays an important role in branding, creating awareness among the tourists and promoting a specific place – be it natural or cultural. Design/methodology/approach – The study is based on qualitative research and utilised interviews and explanatory case study method, taking Maritime Greenwich WHS as a case. Findings – It is found that the status of WHS motivates the tourists in general and heritage tourists in particular to visit the case study site. Also, the status helps in boosting the level of confidence of the tourists while selecting the site. Overall, it helps to reinforce the identity of a place. However, sustainability and conservation should not take a back seat when the very purpose of branding a site as WHS is this. Originality/value – It is ideal to have a balance in managing the demand and supply side of place management and marketing making sure that the heritage value and trust is kept intact.


2015 ◽  
Vol 61 (4) ◽  
pp. 3-18 ◽  
Author(s):  
A. Sobotka ◽  
A. Radziejowska ◽  
J. Czaja

In Poland, it often happens that construction objects are subject to demolition work for different reasons. Demolition, according the Construction Law, is defined as a type of construction works and, as such, represents a particular type of construction project. As in other construction projects, a very important phase, in addition to execution of the works, is to prepare, design and plan demolition works. Some demolition activities are covered by appropriate regulations and can be described as typical. On the other hand the technical side of demolition works depends on many factors such as: the type of building, its age, technical condition, type of construction, etc. This article covers the analysis of the stages and tasks in the preparatory phase of the building demolition. This work will also present a description of the tasks carried out during the demolition works based on the example of a historic tenement house located in Krakow. This analysis aims to identify implementation problems and sources of risk that may occur during this type of construction work.


Author(s):  
Patrick Bohl

Today’s business leaders must constantly review and develop their firm’s abilities to adapt to and benefit from external changes. Dynamic capabilities are the capacity of an organization to purposefully create, extend or modify its resource base. They enable it to exploit business, technological and market opportunities and adapt to market changes, an ability more often observed in highly dynamic industries, such as consumer electronics or telecommunications. Using the case study method, this article identifies dynamic capabilities in traditional, less dynamic industries when faced with a sudden drop of revenue. Four distinct routines emerge, namely structure and practices enduring time-sensitive strategic decision-making by the tice, and a culture encouraging learning and coevolving. Seemingly strategic paradox objectives encourage the management team to question the status quo and, when managed well, transform the tensions between old and new into an ability to advance superior ideas faster.


Climate ◽  
2021 ◽  
Vol 9 (2) ◽  
pp. 33
Author(s):  
Kyeong-Tae Kim ◽  
Ik Kim

In Korea, a greenhouse gas (GHG) environmental impact assessment (EIA) has been conducting since 2012, which sets the evaluation procedures and methods for GHG items during the EIA. However, the current EIA on GHG emissions can support wrong decision-making because the evaluation does not consider Scope 3 GHG emissions. Accordingly, this study proposed the life cycle EIA (LCEIA) method to identify changes in GHG emissions that need to be managed by considering Scope 3 GHG emissions in construction projects. The LCEIA method incorporates life cycle CO2 (LCCO2) including Scope 1, Scope, and Scope 3 GHG emissions using the concept of life cycle assessment (LCA) into the scoping step of the EIA process. The case study was conducted using existing EIA on GHG emission and LCEIA methodology for a development project in Gwangyang City. Scenario 1 is defined as an approach that calculates GHG emissions using the existing EIA method, and scenario 2 is also defined as a process using the LCEIA method. Results reveal that Scenario 2, including Scope 3 GHG emissions, had 46.4−51.2% more GHG emissions than Scenario 1. Sensitivity analysis for electricity and liquefied natural gas (LNG) density was also performed. Although the change in the carbon emission factor of electricity had a slightly sensitive effect on the research results, the LNG density was found to be less sensitive. This study believes the importance of switching to an EIA reflecting life cycle carbon dioxide (LCCO2) to calculate the exact amount of GHG emissions for construction work.


2016 ◽  
Vol 13 (2) ◽  
pp. 371-378 ◽  
Author(s):  
Shanmugasundaram Subramanian

Proxy advisory firms play a significant role in shareholder voting and in the formulation of corporate governance policy. This paper analyses the status of budding proxy advisory industry in India using a case study method. The paper first traces the history of the global proxy advisory industry and also reviews the literature. Then we study the Indian Proxy Advisory Industry, which was born when the market regulator SEBI came out with a regulation in 2010 on “mutual funds” shareholding resolution voting policy. Quickly, three proxy advisory firms came to the market with differing ownership structure. Indian financial market offered great potential for investment through institutional investors. However the institutional investors in India are traditionally restrained them from taking activist role by voting on the shareholder meeting proposals. This poses a challenge to Indian proxy advisory firms along with other challenges typical of an emerging industry. The proxy advisory firms need to overcome the challenges to ensure their success. This pioneering work on Indian proxy advisory industry would open up new research ideas


2017 ◽  
Vol 23 (6) ◽  
pp. 824-846 ◽  
Author(s):  
Mostafa KHANZADI ◽  
Zenonas TURSKIS ◽  
Gholamreza GHODRATI AMIRI ◽  
Alireza CHALEKAEE

Conflict between parties is a common issue in construction projects. In the present article, the conflicts be-tween contractor and employer in delayed Design-Bid-Build projects have been studied. Defining a case study, a dispute resolution method has been proposed. This case has been considered as a MCDM problem. This problem has been as-sumed as a discrete zero-sum two-person matrix game with grey numbers. Among the four alternatives available for con-tractor and employer in the proposed case study, termination is the last alternative that decision makers choose. Based on different risk values, authors determined the optimal solution for both parties. This article integrates some linguistic criteria together with time and cost, providing the better conditions to avoid lengthy bargaining.


Author(s):  
Priyanka Thapa ◽  

Coronavirus disease 2019 (COVID-19), a global pandemic as declared by World Health Organization (WHO) is causing severe impacts in almost all aspects of life in Nepal. In response to this pandemic, Nepal Government announced a country-wide lockdown from 24th March 2020 and ended on 21st July 2020. Coronavirus pandemic is an unprecedented event affecting almost every aspect of the construction sector in Nepal. Hence, this study was carried out to assess the impact of COVID-19 lockdown on Nepal’s construction sector based on selected construction projects. For this purpose, a case study of five ongoing construction projects was taken into account and questionnaires were distributed to responsible officials (client, consultant and contractor) of those projects. This study intended to find out the impact of COVID-19 lockdown on supply-demand trend analysis, cost and time of construction projects. Besides, this study also intends to find the contractual issues and claims associated with COVID-19 lockdown. The study reveals that COVID-19 caused serious disruption to the supply chain. Subsequently, project cost and time increases due to uncertainty regarding the availability of subcontractors/ suppliers/labour. The impact of COVID-19 lockdown however varies with the nature, scale and size of the project. Besides, the study also implies that contractual disputes are likely to increase due to lockdown. Each contract and its conditions have to be carefully analyzed to determine a party’s specific entitlement. There is uncertainty as to when the situation becomes normal and construction work can be carried out with optimum efficiency.


2021 ◽  
Vol 2 (2) ◽  
pp. 184-200
Author(s):  
Ambar Wati ◽  
Arman Paramansyah ◽  
Dessy Damayanthi

The problem to be looked for  the answer in this study is the process of applying Islamic business ethics in buying and selling transactions in the traditional market of Pendopo, Empat Lawang. This research uses a qualitative approach to the case study method, which emphasizes efforts to obtain information about the status of a picture of phenomena, as well as to draw the meaning of a desired problem with respect to a case. The data collection technique used triangulation with interviews, observation, and documentation study. The results of the study conclude that the understanding of traders in the traditional Pendopo market towards Islamic business ethics, traders have not maximally understood Islamic business ethics, both the expression of feelings that are reflected, the pattern of application of business ethics in Islam which emphasizes trading ethics in buying and selling transactions in the Pendopo market. It has been running quite well without being overtaken by the traders, there is still a lack of awareness of the traders about raising prices by hoarding goods with the aim of seeking high profits from consumer needs in general. traders feel they can compete so that their merchandise can sell cheaply and cheerfully. The measurement of the application of business ethics in Islam carried out by the seller / trader shows that not some traders have implemented business ethics in Islam. Based on these findings, it is suggested the need for periodic counseling to increase the insight and knowledge of traders to be aware of the meaning and benefits of business ethics in Islam which emphasizes trading ethics in sales transactions. the role of the community in this case is that buyers are also required to understand and understand the business ethics system in Islam    


2020 ◽  
Vol 2020 ◽  
pp. 1-13
Author(s):  
Zhen Chen

PPP program is characterized by great organizational complexity, complicated communication network, and high coordination cost, which lead governance problems to be more complex than usual construction projects. Investigating 49 stakeholders of the D characteristic town construction program, the author constructs the work interaction network and supervision network of characteristic town PPP program based on organizational relationship. Through the calculation and comparison of network parameters, the network problems were analyzed, and the governance improvement scheme was proposed. The results show that, during the construction phase of the PPP program, (1) the SPV is still the core stakeholders; (2) the PPP program supervison belongs to hierarchical supervision characteristics and (3) the government regulators and loan institutions have limited influences on the program but they can restrict the SPV by strengthening supervision with subprogram stakeholders.


2018 ◽  
Vol 1 (2) ◽  
pp. 1-17
Author(s):  
Tedi Budiman

One example of the growing information technology today is mobile learning, mobile learning which refers to mobile technology as a learning medium. Mobile learning is learning that is unique for each student to access learning materials anywhere, anytime. Mobile learning is suitable as a model of learning for the students to make it easier to get an understanding of a given subject, such as math is pretty complicated and always using formulas.The design method that I use is the case study method, namely, learning, searching and collecting data related to the study. While the development of engineering design software application programs that will be used by the author is the method of Rapid Application Development (RAD), which consists of 4 stages: Requirements Planning Phase, User Design Phase, Construction Phase and Phase Cotuver.