Factors that Contribute to the Generation of Construction Waste at Sites

2010 ◽  
Vol 163-167 ◽  
pp. 4501-4507 ◽  
Author(s):  
Siti Nazziera Mokhtar ◽  
Noor Zalina Mahmood ◽  
Che Rosmani Che Hassan ◽  
Ahmad Firman Masudi ◽  
Nik Meriam Sulaiman

Construction industry in Malaysia is growing rapidly with high demand due to vast development and urbanization. Therefore, many commercial and residential buildings are being developed. The increasing number of construction projects in Malaysia will indirectly contribute to the increase of construction waste generation. Thus, waste minimization is an important area of concern in the implementation of the construction waste management in the construction industry of Malaysia. Data collection and observations was conducted at three construction sites which adopt different type of method with different type of building and size of project in Klang Valley. The calculation of the construction waste index generated at these sites is adopted from Poon et al., (2001). Result showed that construction method, size of projects (GFA), type of building, storage method system, human error and technical problem can affect the amount of waste index (debris) and amount of wastage level generated at construction sites. Therefore waste index and wastage level can be used as operational an indicator for waste minimization of the construction activities.

2020 ◽  
Vol III (I) ◽  
pp. 1-16
Author(s):  
Bilal Anwar ◽  
Muneeb Asif ◽  
Muhammad Imran Ashraf

Waste disposal has become an issue worldwide and the major cause of this issue is considered to be the construction activities producing wastes. Pakistan being the 6 most populated country in the world is considered to have a huge amount of waste due to the various construction and particularly megaprojects and this amount of construction waste is increasing consistently in the country. Pakistan produces of construction waste per year and is increasing annually by 2%. These increasing wastes and issues associated with these construction wastes lead to a crucial need for improvement of waste management practices in the construction industry of the country through various measures. Despite of the large need for waste minimization research in Pakistan, , deductive approach was used, and quantitative method was selected, the present study has used cross-sectional design. The researcher used a sample of 323 individuals and conducted a questionnaire-based study.


2012 ◽  
Vol 446-449 ◽  
pp. 937-944 ◽  
Author(s):  
M.A Kazerooni Sadi ◽  
Arham Abdullah ◽  
Masoud Navazandeh Sajoudi ◽  
M.F.M. Kamal ◽  
Fatemeh Torshizi ◽  
...  

The construction industry consumes a substantial amount of raw materials in its processes and the output is obviously the product and most importantly the waste material. Other than that, the construction industry is well known as one of the worst environmental polluters. This study is to determine the use of waste minimisation technique in creating sustainable waste management in order to identify the technique which has the most capabilities to reduce on-site waste. The objective of this study is to assess the waste minimization techniques taken from the 4R concept (which includes reduce, reuse, recycle and recovery techniques) in minimizing the waste in construction waste management. The most used waste minimization technique found in the 4R concept would be waste reduction. This shows that the local construction industry has the knowledge necessary to plan out the waste management processes but the implementation is still far from satisfying. Additionally, the findings reveal that because the industry is profit-driven, construction practitioners are motivated by profit to adapt to this techniques.


2019 ◽  
Vol 8 (2S11) ◽  
pp. 2642-2644

The rules and regulations on waste management in the construction and demolition sector are analyzed corresponding to the present scenario of C&DW in India. C&D waste from construction sites has emerged as a significant threat to India because of its severe footprint on the environment. Vast quantities of construction waste will have unfavorable consequences on the surroundings if they are not properly managed. Therefore it is necessary to manage the development of C&DW by the experts within the construction industry. The approach represented is specialized in rules and regulations on waste management so that the environmental impact of construction activities can be minimized.


2010 ◽  
Vol 163-167 ◽  
pp. 4564-4569 ◽  
Author(s):  
Ahmad Firman Masudi ◽  
Che Rosmani Che Hassan ◽  
Noor Zalina Mahmood ◽  
Siti Nazziera Mokhtar ◽  
Nik Meriam Sulaiman

Estimation of construction and demolition (C&D) waste amount is crucial for implementing waste minimization program. Estimation of C&D waste amount generated is a mean in assessing the potential for waste reduction. Thus, a better understanding of C&D waste generation in terms of causes and sources can be achieved. The aim of this paper is to conduct a review on available construction waste quantification methods from previous studies, which have been utilized in certain countries, while attempting to choose the most suitable and applicable method, and to direct future studies for better quantification methods. This review is applicable only for building construction projects and did not include civil/infrastructure, demolition, renovation, and excavation projects. Six quantification methods and/or waste audit tool available from literatures are discussed, which include their limitation and future direction for this study. It is believed that some combination of these quantification methods could make a good impact in accurate numerical estimation of construction waste amount generated in building construction projects. A strong and accurate database as presented by Soliz-Guzman, combined with effective, vital, and resourceful estimation suggested by Jalali’s Global Index (GI), also with the aid of user-friendly software tool like the SMARTAudit could provide an effective and reliable waste quantification.


2015 ◽  
Vol 23 (2) ◽  
pp. 311-318 ◽  
Author(s):  
Rafiq Muhammad CHOUDHRY

Improvement of safety and productivity are major concerns throughout the construction industry. There is a dearth of efforts that document the need for simultaneous achievement of safety and productivity on construction sites. The objective of this research is to investigate productivity and safety simultaneously on construction projects by con­ducting a survey. In total, 1,800 hard-copy questionnaires were distributed and the response rate was 81%, resulting in 1,454 valid questionnaires for analysis. Safety and productivity were investigated on 25 construction projects by means of statistical analysis. The results indicated that eleven of the fifteen significant findings pertained to safety and the rest to productivity. The results confirmed that it is possible to improve productivity and safety simultaneously on construc­tion projects. All measures were found to be correlated with both safety and productivity. The findings of this research provide practical knowledge to project managers and safety practitioners on construction projects to achieve safety and productivity simultaneously. The methodology of research might be useful for research at other construction projects in other regions and cultures.


Author(s):  
Mohd Hilmi Izwan Abd Rahim ◽  
◽  
Sulzakimin Mohamed ◽  
Narimah Kasim ◽  
Mazianah Rahmat ◽  
...  

This nowadays an increasing number of construction projects in Malaysia have contributed to the production of construction waste which has had a negative impact on the environment, especially through illegal dumping. The increasing number of illegal dumping activities is a sign that construction waste management needs to be examined. To date, a comprehensive criterion for construction waste management, in developing countries is still not clearly defined. Therefore, the objectives of this paper are to investigate current illegal dumping activities, and identify the challenges towards reducing illegal dumping activities in the Malaysian construction industry. Hence, this research conducted interviews with 20 expert stakeholders related to construction waste management in order to scrutinise illegal dumping activities in Malaysia. The data from these semi-structured interviews were analysed by content analysis. The findings are used to determine the current challenges for reducing illegal dumping activities in the Malaysian construction industry. The elements in the current findings are potentially to improve construction waste management in order to archive the proper construction waste management. Finally, this findings will help to identify strategies to reduce illegal dumping activities and to enhance challenges towards reducing illegal dumping activities in the Malaysian construction industry.


Construction is one of the most important employment sectors in India with very minimal research being done to identify the delay factors and causes that affect the construction Industry. The opinions of the construction professional required for the research was obtained by conduction interviews. A set of questions were circulated between the professionals working on the site to acquire the causes and effects of delays faced by them. To resolve the issues various studies and researches have been done by various researchers. The data analyzed in the research was done by using Relative Important Index (RII) which helpsto categories and rank the causes of delays according to the importance of the causes with respect to its contribution towards time delays, arbitration, litigation, cost overrun and total abandonment. Spearmen’s rank correlation coefficient was used compare the effect of delays between contractors, owners and consultants. In this paper, the research is aimed towards finding the effects of various causes on the various parties on construction sites of coastal parts of Mumbai and methods of minimization of the same.


2010 ◽  
Vol 16 (4) ◽  
pp. 499-509 ◽  
Author(s):  
Romuald A. Rwamamara ◽  
Ove Lagerqvist ◽  
Thomas Olofsson ◽  
Bo M. Johansson ◽  
Kazys Algirdas Kaminskas

Many construction work tasks are physically very strenuous and the incidence of work‐related musculoskeletal disorders (WMSDs) among construction workers is considerably higher than those in most other occupations. The aim of the study presented in this paper was to contribute to understanding a healthy construction site brought about by the best practices implemented by large construction sites to prevent WMSDs. A triangulation method made of interviews, site observations and studies on company's documents was used to identify the best practices in 13 several construction projects. A range of the best practices both in the pre‐construction and construction phases of the projects were identified in six different areas of the balance of the construction workplace system; however, there seems to be a significant need for good practices in the management of a systematic work environment. It is now established that Swedish construction industry has several best practices to protect work‐related musculoskeletal health. However, inadequate worker participation and the neglect of health and safety issues by designers in the planning process as well as the implications of some remuneration methods on the production schedule were perceived as detrimental to the musculoskeletal health of construction workers. Santrauka Daug statybos darbu yra fiziškai labai itempti, o su darbu susijusiu raumenu ir skeleto sistemos pažeidimu dažnis tarp statybininku yra kur kas aukštesnis negu tarp daugelio kitu profesiju. Šio tyrimo tikslas – pletoti supratima apie sveikatos būkle ir jos svarba dirbant statybu aikštelese, igyvendinant didelius statybos objektus, siekiant išvengti su darbu susijusiu raumenu ir skeleto sistemos pažeidimu. Tyrimams buvo taikytas interviu, pagristas trianguliacijos metodu, darbo procesu stebejimo statybos aikštelese metodas, buvo nagrineti statybos kompaniju dokumentai, siekiant identifikuoti 13 skirtingu statybos projektu. Geriausia praktika, prieš pradedant statybas ir jau statant, buvo nustatyta šešiuose skirtinguose statybu regionuose, tačiau tokia praktika yra svarbi darbo aplinkos vadyboje. Pripažinta, kad Švedijos statybos pramoneje taikomi keli būdai, kaip apsaugoti statybininkus nuo raumenu ir skeleto sistemos pažeidimu. Vis delto mažas darbininku domejimasis šia problema, sveikatos bei saugos problemu nepaisymas planavimo procese, kai kuriu atsilyginimo būdu itraukimas i gamybos veiksniu saraša buvo vertinti kaip faktoriai, žalingai veikiantys statybininku raumenu ir skeleto sistema.


10.29007/919j ◽  
2018 ◽  
Author(s):  
Parth Raval ◽  
Jaydev Bhavsar ◽  
Dharmesh Oza

Waste in the construction industry has been the theme of several research projects around the world in recent years. Researchers implement different methods to reduce the amount of waste in the construction industry. In the construction industry, contractors only consider physical waste which leads the project to cost overruns. i.e. material waste. Construction industry is also affected by time overrun. Impact of time overrun on the construction projects is considerably high and requires special attention in addition to physical waste. In the present study, construction waste is categorized in mainly of two types: value added waste and non-value added waste. This categorization includes both-material waste as well as time waste, which are main causes of occurrence of waste. A case study was also carried out at a residential building project in Ahmedabad, Gujarat to get the idea about the percentage of waste occurs in a construction project.


2021 ◽  
Vol 43 (6) ◽  
pp. 453-460
Author(s):  
Ali Hussain

Objectives : This research evaluate the level of construction waste materials in Iraq construction industry and compare construction material waste among three types of executing projects including specialist contractors, general building contractor and government department.Methods : The target materials in this study were brick, cement, sand, steel, gravel and thermo-stone. SPSS V24. Descriptive and inferential analyses were applied in this study.Results and Discussion : Field observation show that the highest percentage of waste was “Brick” with 15.21% followed by “Sand” with 12.52% and “Thermo-stone” with 12.02%. The lowest percentage of waste in Iraq construction project was “Steel” and “Cement” with 3.96% and 4% respectively. The results of a comparison between these three groups confirmed that for all types of construction project waste, the governmental project had the highest percentage (12.77%), special contractor (11.19%), a general building contractor (9.71%). The major waste from materials was handling with 31.9%, concrete construction with 28.09% and 24.26% the finishing.Conclusion The percentage of losses in the construction sites is very high compared to the permissible limit implementing inexpensive preventive measures, mostly related to managerial practice improvements.