THE RELATIONSHIP BETWEEN CONFLICT, CHANGE AND PROJECT MANAGEMENT STRATEGY

Author(s):  
P.D. GARDINER ◽  
J.E.L. SIMMONS
Author(s):  
Neama Mostafa RaKaban ◽  
Hanaa Saeed Salama

The research aims to study the relationship between the management strategies of the small projects of the workers in their dimensions: (Project phase strategy, making decisions, the project management strategy of financial production, Marketing Productive Management Strategy, the strategy of managing productive legal projects) with satisfaction with life dimensions: (Psychological compatibility, Self-compliance, Work environment, and Social compatibility) . The research sample consisted of 102 persons working in four small projects, "Ceramics - Bamboo - Serma - Hand Carpets". They were selected in a pesky-purpose manner from the employees of these projects in Sakiet Abu Shaara village, Sentris, Menoufia Governorate and 10th of Ramadan City. "General data form", "Project Management Strategies scale", and "measure of satisfaction with life" were applied. The study followed the descriptive and analytical approach. The data were categorized and analyzed using appropriate statistical methods through the SPSS statistical program such as number and percentages, arithmetic mean, standard deviation, T-test, Pearson correlation coefficient, Chi-square and F-test. The most important results are related to the relationship between the project management strategy and the financial productivity and self-compliance at the level of significance of 0.01, which means that the realization of the requirements of the project in terms of finance and meet the needs, resulting in self-compatibility.  There is also a correlation between the project management strategy and the business environment at the level of 0.01 meaning that whenever the project needs to be met in terms of funding and meet the needs of the project as this leads to compatibility with the place of residence of the project and the surrounding environment, there is an inverse correlation Between the social situation and the decision-making at the level of significance of 0.01, which means that the greater the number of employees are married the less ability to make the decisions needed in those small projects, which means the impact of the ability to make decisions on the social situation of the individual. There were statistically significant differences between the averages of the different projects in terms of the overall project management strategy according to the dwelling. The highest value was for the medium in the ceramics project and the lowest in the hand carpets where the ceramic represents the highest average 2.000 while the carpets represent the lowest average by 1.809 at the level of significance 0.1. There were significant differences between the mean of the various projects in terms of satisfaction with total life according to the dimension of psychological compatibility and the highest value for the average in the hand carpet project where the results showed that the average and standard deviation of hand carpets is (23.745 ± 4.38) The recommendations of the government, decision-makers and ministries to establish a culture of entrepreneurship and motivate young people to set up private projects through the media, paying attention to the enactment of laws on small projects to motivate young people to establish and develop small and micro enterprises, In various stages to ensure the success and continuity of the project.


2020 ◽  
Vol 8 (1) ◽  
pp. 34-61
Author(s):  
Neama Mostafa RaKaban ◽  
Hanaa Saeed Salama

The research aims to study the relationship between the management strategies of the small projects of the workers in their dimensions: (Project phase strategy, making decisions, the project management strategy of financial production, Marketing Productive Management Strategy, the strategy of managing productive legal projects) with satisfaction with life dimensions: (Psychological compatibility, Self-compliance, Work environment, and Social compatibility) . The research sample consisted of 102 persons working in four small projects, "Ceramics - Bamboo - Serma - Hand Carpets". They were selected in a pesky-purpose manner from the employees of these projects in Sakiet Abu Shaara village, Sentris, Menoufia Governorate and 10th of Ramadan City. "General data form", "Project Management Strategies scale", and "measure of satisfaction with life" were applied. The study followed the descriptive and analytical approach. The data were categorized and analyzed using appropriate statistical methods through the SPSS statistical program such as number and percentages, arithmetic mean, standard deviation, T-test, Pearson correlation coefficient, Chi-square and F-test. The most important results are related to the relationship between the project management strategy and the financial productivity and self-compliance at the level of significance of 0.01, which means that the realization of the requirements of the project in terms of finance and meet the needs, resulting in self-compatibility.  There is also a correlation between the project management strategy and the business environment at the level of 0.01 meaning that whenever the project needs to be met in terms of funding and meet the needs of the project as this leads to compatibility with the place of residence of the project and the surrounding environment, there is an inverse correlation Between the social situation and the decision-making at the level of significance of 0.01, which means that the greater the number of employees are married the less ability to make the decisions needed in those small projects, which means the impact of the ability to make decisions on the social situation of the individual. There were statistically significant differences between the averages of the different projects in terms of the overall project management strategy according to the dwelling. The highest value was for the medium in the ceramics project and the lowest in the hand carpets where the ceramic represents the highest average 2.000 while the carpets represent the lowest average by 1.809 at the level of significance 0.1. There were significant differences between the mean of the various projects in terms of satisfaction with total life according to the dimension of psychological compatibility and the highest value for the average in the hand carpet project where the results showed that the average and standard deviation of hand carpets is (23.745 ± 4.38) The recommendations of the government, decision-makers and ministries to establish a culture of entrepreneurship and motivate young people to set up private projects through the media, paying attention to the enactment of laws on small projects to motivate young people to establish and develop small and micro enterprises, In various stages to ensure the success and continuity of the project.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Matti Haverila ◽  
Jenny Carita Twyford

PurposeDrawing upon the relational exchange theory, the longitudinal relationship between various stages of project management customer satisfaction, value for money and repurchase intent are examined.Design/methodology/approachUsing a survey questionnaire, data were gathered over four consecutive quarters (N = 2,537). The statistical methods included exploratory factor analysis, confirmatory composite analysis (CCA) and partial least squares structural equation modeling (PLS-SEM).FindingsProject management was perceived as a three-dimensional construct (proposal, installation, commissioning/start-up). There was a significant longitudinal relationship between project stages and satisfaction in the complete data set. The results varied on the quarterly basis. The relationship customer satisfaction/repurchase intent was significant in the whole data set and during all quarters. This was the case for the relationships between value for money and customer satisfaction and between value for money and repurchase intent. The effect sizes were small between project management stages and customer satisfaction, small to medium for the value for money construct and large for the customer satisfaction construct.Originality/valueAn important implication is the significant relationship between the stages of project management and satisfaction. However, the effect sizes were small, however. The importance of the effect size in comparison to the significance of the relationships is highlighted especially when the sample size is large. The paper also confirms the linear relationship between satisfaction and repurchase intent. The nature of the relationship between customer satisfaction and loyalty is based on a moderate exchange relationship in the relational exchange continuum. The study contributes to the relational exchange theory in the context of project management.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Aqsa Ameer ◽  
Farah Naz ◽  
Bushra Gul Taj ◽  
Iqra Ameer

Purpose The purpose of this study is to determine the effect of conscientiousness and extraversion personality traits on project success. The relationship is mediated by affective professional commitment, whilst the relationship between personality traits and project success is moderated by organizational project management maturity. Design/methodology/approach The deductive approach is used to achieve the objectives of this study. Data were collected through a purposive sampling technique from 250 respondents with the help of questionnaires from information technology sectors. The structural equation modelling (SEM) in partial least squares-SEM and SPSS is used to analyse the data and to examine the hypothesis. Findings The outcomes demonstrate the partial mediating impact of affective professional commitment between the relationship of conscientiousness and extraversion personalities with project success. Additionally, it proves the moderating effects of project management maturity between the relationship of conscientiousness and extraversion personalities with project success. Practical implications This study reflects that employee personality appears to be a reliable indicator of how an employee is faithful to his profession. This faithfulness or duty decides the employee’s execution in terms of offering a successful project. Thus, achieving employee commitment needs to be done by completing the project successfully by the organizations in the presence of project management maturity systems. Originality/value It is the first study of its kind to provide experimental proof of the impact of a manager’s personality traits on project success in the presence of affective professional commitment (mediator) and organizational project management maturity (moderator).


Author(s):  
Brian J. Galli

The purpose of this study is to examine the risks of using statistical tools in a project basis. A systematic search of certain academic databases has been conducted for this study. Statistical tools could be used in a project, and they should be properly planned and designed. Statistical tools include major activities, such as collecting and analyzing data, providing meaningful interpretation, and reporting findings. When dealing with statistical tools, there are several risks that may exist and impact the project either positively or negatively. This study covers a brief outline of the risk management, statistical tools, and the relationship between the two concepts. Finally, a discussion of the common type of risks that are initiated by using statistical analysis tools are provided, which could be planned, identified, and analyzed in the early stages of the project.


2019 ◽  
Vol 9 (2) ◽  
pp. 56-65
Author(s):  
Michael Pace

Abstract This non-experimental correlational study extends previous research investigating the relationship between project management methodology and reported project success, as well as the moderating variables of industry and project manager experience. The sample included North American project managers with five years’ experience, 25 years of age or older, and experience with multiple project management methodologies. The survey instrument consisted of 58 questions, utilizing a 5-point Likert scale to record responses. The survey contained three sections, including demographic information, questions related to a successful project, and questions related to a less-than successful (failed / challenged) project. 367 usable responses were received. The examination of the constructs included Pearson’s correlation coefficient as well as linear regression to determine the impact of moderating variables. Results indicated that project management methodology has a weak correlation with reported project success, and this correlation is not moderated by industry nor project manager experience. The results did not align with previously conducted studies, illustrating a need to continue the study of methods impacting success including investigating additional moderating variables.


2002 ◽  
Vol 33 (4) ◽  
pp. 39-47 ◽  
Author(s):  
Steve D. Giffin

A taxonomy of Internet applications has been created to describe the use of the Internet for project management communication. It is based on the technological characteristics of Internet applications, the requirements of project management communication, and the organizational issues associated with using Internet applications. Its dimensions are the sender/receiver synchronization and the relationship between the number of senders and receivers. The taxonomy is populated with six Internet applications that are used commonly in project management communication. The taxonomy is presented as an aid to understanding the capabilities and limitations of Internet applications for different types of project management communication.


Author(s):  
Mykhailo Vedernikov ◽  
Oksana Chernushkina ◽  
Lesia Volianska-Savchuk ◽  
Maria Zelena ◽  
Natalia Bazaliyska

The purpose of the article. The article considers the features of strategic human resource management as the basis of strategic potential, which affects the competitiveness of the enterprise, determines the directions of its development. The scheme of the system of strategic human resources management is presented. The goals of personnel policy and a set of tasks that allow them to be implemented are determined. The ways of realization of the strategy of human resources management at an industrial enterprise are offered. It is established that the process of implementing the strategy of the enterprise should be divided into certain conditional stages, which should be included in the action plan for the implementation of the strategy.Methodology. The strategic goal of human resources management system is to ensure the development of the enterprise through the efficient use of human capital. When forming a human resources management strategy, the main task is to identify and take into account future changes and trends, to justify changes that contribute to the sustainable development of the enterprise.The process of strategy development and implementation is continuous, which is covered in close connection with the solution of strategic tasks both in the long run and in the medium and short term, i.e. their solution in terms of strategic, tactical and operational management. Such specification of human resources management strategy and bringing it to strategic objectives and individual actions is embodied in the strategic plan – a document containing specific tasks and measures to implement the strategy, the timing of their implementation and responsible executors for each task, the amount of resources required.Results. Implementation of human resources management strategy is an important stage of the strategic management process. For it to be successful, the organization's management must adhere to the following rules: firstдн, the goals, strategies, tasks of personnel management must be carefully and timely communicated to all employees of the organization in order to obtain from them not only understanding of the organization and service personnel management, but also informal involvement in the implementation of strategies, in particular, the development of obligations to employees of the organization to implement the strategy; secondдн, the general management of the organization and the heads of personnel management service must not only ensure the timely use of all necessary resources (material, equipment, office equipment, financial, etc.), but also have a plan for implementing the strategy in the form of targeted guidelines for the state and development labor potential and record the achievement of each goal.Practical implications. The process of implementing the strategy of an industrial enterprise requires fundamentally different approaches than the process of strategy formation. First of all, because it is mainly organizational process, while the formation of strategy is mainly an analytical one. The process of implementing the company's strategy can also be divided into certain conditional stages, more precisely, areas of activity that should be included in the action plan to implement the strategy. Initial among them is decomposition, i.e. the development on the basis of a strategic plan of tactical, operational plans, as well as policies, programs, projects, rules and procedures.Value/originality. Thus, the relationship of personnel strategy and general strategy of enterprise development is realized through a mechanism that includes: coordination of goals of both strategies, the relationship of their functions, coordination of business processes of personnel management with other business processes, integration of personnel strategy results to aggregate results of the organization, control of compliance of the obtained results with the defined strategic goals of the organization. Of particular importance is the approach to human resource management as a business process. Personnel processes as a certain sequence of interrelated actions for the implementation of personnel management functions are aimed at: transformation of human assets of the organization in accordance with its strategic priorities; transformation of working conditions of employees of the organization in accordance with the expectations and needs of staff; creation of new management technologies and other HR-products.


2020 ◽  
Vol 46 (1) ◽  
pp. 9-13
Author(s):  
Ricardo Nunes Cabral ◽  
Waldir Aparecido Marouelli ◽  
Adalberto C. Café-Filho

ABSTRACT Verticillium wilt in eggplants is a root disease of difficult control. In this study, we report the relationship between soil water availability and the disease intensity in order to identify management strategies that are unfavourable to the pathogen and capable of reducing the disease progression and the damage caused by it. Four irrigation management strategies were compared in soil infested or not infested with Verticillium dahliae, which consisted of: irrigating when the available soil moisture was maintained at 90% (WA90%), 55% (WA55%) and 20% (WA20%) during the entire growing cycle, and kept at 20% in the vegetative stage, and at 90% in the production stage (WA20-90%). Experimental design was in randomized blocks, including eight treatments in factorial arrangement (4x2) and three replicates. The management strategy WA20-90% led to a significant reduction in the disease severity and in the extent of xylem colonization by the pathogen. The dry mass of plants in infested soil was 12% lower than that of control treatments and was higher with the irrigation strategy WA90% than with WA55% or WA20%. The strategy WA20-90% was efficient in reducing the disease with no significant reduction in dry mass.


Sign in / Sign up

Export Citation Format

Share Document