scholarly journals Software product management: planning tool integration

2020 ◽  
Vol 311 ◽  
pp. 02011
Author(s):  
Аndrey Polianskii ◽  
Darya Chukalova

The article discusses the problems of using software for project management and calculating the complexity of design work on the example of planning projects for the production of software products. Approaches to using project management standards and the project subject area to form a work breakdown structure, calculating the complexity of individual work packages and the project as a whole are investigated, requirements for integration software are formulated.

2020 ◽  
Vol 4 (26) ◽  
pp. 45-53
Author(s):  
M. O. Gidroets ◽  
◽  
L. I. Grishanova ◽  

This article discusses the main methodologies for developing software products. The most common cascading and flexible methodologies are characterized. Considered the pros and cons of each methodology. The situations of expedient application of cascade and flexible approaches to software product development are determined. Key words: development methodologies, waterfall model, agile model, project management, planning, software product development.


Author(s):  
Ju. A. Tikhonova

The article discusses the development trends of the modern preschool education system in the aspect of the activity of the teacherpsychologist of the preschool educational organization. The experience of using 1C software products in the practical work of the psychological service of kindergarten 318 of the city of Perm in the aspects of psychological monitoring of children’s readiness to study at school and correctional and developmental work with preschool children is presented. The components of the child’s psychological readiness for school are described. On practical examples, diagnostic methods for determining the level of readiness of children for schooling are analyzed. The data of testing kindergarten pupils at the beginning of the 2019/2020 school year on the parameters allowing to identify urgent problems and determine the direction of the necessary correctional development work are presented. Features of the practical application of the software product 1C:Preschool Psychodiagnostics in the process of psychological support of preparing children for school are considered. Methods are described, the scope of which is aimed not only at the study of personality traits, but also at its development. The possibilities of using games of the 1C:Educational Collection in the correctional and developmental work are disclosed. The description of game collections is given, options for their use are presented.


Author(s):  
V. A. Martynyuk ◽  
V. A. Trudonoshin ◽  
V. G. Fedoruk

The article considers applications of foreign CAD-systems in creating the challenging projects at domestic enterprises and design bureaus. As stated in the article "... presently, there is no domestic CAD-system that could completely replace such foreign products as NX, CATIA, Credo". Besides, due to international cooperation in creating the challenging projects (for example, the project to create a modern wide-body aircraft, proposed jointly with China), it makes sense to use the worldwide known and popular CAD systems (the aforementioned NX, CATIA, Credo). Therefore, in the foreseeable future, we will still have to use foreign software products. Of course, there always remains a question of the reliability of the results obtained. Actually, this question is always open regardless of what software product is used - domestic or foreign. This question has been haunting both developers and users of CAD systems for the last 30 to 40 years. But with using domestic systems, it is much easier to identify the cause of inaccurate results and correct the mathematical models used, the methods of numerical integration applied, and the solution of systems of nonlinear algebraic systems. Everything is much more complicated if we use a foreign software product. All advertising conversations that there is a tool to make the detected errors available to the developers, remain only conversations in the real world. It is easily understandable to domestic users, and, especially, to domestic developers of similar software products. The existing development rates and competition for potential buyers dictate a rigid framework of deadlines for releasing all new versions of the product and introducing the latest developments into commercial product, etc. As a result, the known errors migrate from version to version, and many users have accepted it long ago. Especially, this concerns the less popular tools rather than the most popular applications (modules) of a CAD system. For example, in CAD systems, the "Modeling" module where geometric models of designed parts and assembly units are created has been repeatedly crosschecked. But most of the errors are hidden in applications related to the design of parts from sheet material and to the pipeline design, as well as in applications related to the analysis of moving mechanisms and to the strength or gas dynamic analysis by the finite element method.The article gives a concrete example of a moving mechanism in the analysis of which an error was detected using the mathematical model of external influence (a source of speed) in the NX 10.0 system of Siemens.


Author(s):  
Pavlo Rodionov ◽  
◽  
Anna Ploskonos ◽  
Lesya Gavrutenko ◽  
◽  
...  

The paper analyzes the factors that affect the amount of effort required to create a mobile application and its cost. It is established that the main factors of influence are the design of the application, its functionality, the type of mobile platform, the availability and level of testing and support, as well as the individual characteristics of the developer. Based on the analysis of information sources, the main methods and approaches to forecasting the cost of software products are identified, which include the COCOMO model, Price-to-win method, expert evaluation, algorithmic methods and the method of analogies. It is proposed to consider the method of analogies as a tool that allows you to make predictions about the cost of resources required for the successful implementation of IT projects based on the experience of similar projects. It is proved that the advantages of this method are the simplicity of its implementation and the clarity of the results obtained, which follows from the practical orientation of this tool. Among the limitations of the method of analogy is the mandatory need for reliable data relating to similar projects, as well as the difficulty of taking into account unspecified indicators. Taking into account the mentioned limitations of the method of analogies and on the basis of the analysis of scientific sources the possible directions of its optimization are determined. Thus, among the ways to improve the effectiveness of this method are those aimed at optimizing the project selection process, the data for which are used as a basis for forecasting. Attempts to improve the method of analogies by including parameters that were previously ignored by this technique seem promising. This in turn can lead to an expansion of the scope of the method of analogies and increase the accuracy of forecasts. As prospects for further research, the need to continue research in the field of optimization of the method of analogies with the subsequent practical verification of theoretical positions on the data of real projects.


Author(s):  
Е.М. Studenikina ◽  
Yu.I. Stepkin ◽  
O.V. Klepikov ◽  
I.V. Kolnet ◽  
L.V. Popova

The paper considers the problematic issues of the geographical information systems (GIS) use in the sociohygienic monitoring (SHM). We analyzed scientific and practical publications on this subject that are freely available on the largest Russian information portal of scientific electronic library eLIBRARY.RU during 2014- 2018, which allowed us to formulate the principles of organization and requirements for effective operation of geographic and information systems in the socio-hygienic monitoring. An analysis of the implementation of these principles at the present stage of development for the socio-hygienic monitoring system is presented, the results of which were used in formulating priority tasks in the area of geographic and information technology implementation into socio-hygienic monitoring and risk-based planning of control and supervisory measures: to determine the necessary level of detail and an information list depicted on electronic maps for the implementation of risk-based control planning; to provide organizational and regulatory and methodological support for the hierarchical principle of GIS within Rospotrebnadzor operating on a single software product of domestic developers for organizations and institutions; to work out the need to combine GIS with similar systems of other departments involved in the data collection of social and hygienic monitoring (Rosstat, Roshydromet, Rosprirodnadzor, Ministry of Health, etc.) to enable automated data export and import; to solve staffing issues to ensure customization and subsequent GIS operation; to provide budget funding for the purchase of licensed software products for GIS in SHM, preferably of Russian developers.


2018 ◽  
Vol 27 (1) ◽  
pp. 31-35
Author(s):  
MARA HAJDU-MACELARU ◽  
◽  
IOANA ZELINA ◽  

Just about everything changes, and so should a software quality model in order to provide a better understanding of quality for any software product to which is applied. But how can we develop such a software quality model? A software quality model pattern that can be adapted to different software products, and provide an accurate evaluation of the overall software quality. This paper presents an adaptable software quality model which is intended to be used for the quality evaluation of different software products.


DYNA ◽  
2018 ◽  
Vol 85 (207) ◽  
pp. 74-83 ◽  
Author(s):  
Daniel Correa ◽  
Raúl Mazo ◽  
Gloria Lucia Giraldo Goméz

Software product lines facilitate the industrialization of software development. The main goal is to create a set of reusable software components for the rapid production of a software systems family. Many authors have proposed different approaches to design and implement the components of a product line. However, the construction and integration of these components continue to be a complex and time-consuming process. This paper introduces Fragment-oriented programming (FragOP), a framework to design and implement software product line domain components, and derive software products. FragOP is based on: (i) domain components, (ii) fragmentations points and (iii)fragments. FragOP was implemented in the VariaMos tool and using it we created a clothing stores software product line. We derivedfive different products, integrating automatically thousands of lines of code. On average, only three lines of code were manually modified;which provided preliminary evidence that using FragOP reduces manual intervention when integrating domain components.


2021 ◽  
Author(s):  
Andrey Manukovskiy ◽  
I. Efremov

This article discusses the features of the development and applicationBIM technologies in the preparation of BIM projects for timber roads in the Russian Federation. The main types of software products used in the preparation of BIM-projects of forest roads have been established. The procedure for using software products is given, their main types are established and functional capabilities are analyzed. The drawbacks and limitations of software products for general-purpose project management in the context of the use of BIM technologies are identified. The necessity of developing a specialized software product for the preparation of elements of projects for the organization of construction «Planworks», in order to increase the efficiency of the use of BIM-technologies in the preparation of projects of timber haul roads. The article describes the proposed procedure for using the developed software product, and also formulates the main stages of developing a project for organizing construction in it. The main list of the initial data required for the preparation of the organization’s project in the developed software product is disclosed. The features of the automated generation of a network model of tasks for the construction of structural elements of a timber road are described, the main types of generated tasks, as well as the features of automated task linking, are given. The advantages of using the developed software product at the stages of development of a technical design and construction of a timber road have been determined.


Sign in / Sign up

Export Citation Format

Share Document