Curbing PPP construction projects’ failure using enhanced stakeholder management success in developing countries

2019 ◽  
Vol 10 (1) ◽  
pp. 50-63
Author(s):  
Emmanuel Eyiah-Botwe ◽  
Clinton O. Aigbavboa ◽  
Wellington Didibhuku Thwala

Purpose Globally, inadequate resources, skills deficiency and poor infrastructure have necessitated public-private partnerships (PPPs) as investment initiative for public sector projects. The purpose of this paper is to evaluate the key constructs for improved stakeholder management (SM) success in curbing PPP projects’ failure in developing countries to fill the research gap. Pre-stakeholder identification (PSI); implementation, monitoring and feedback (IMF) factors impact on PPP projects’ success in Ghana were examined. Design/methodology/approach In total, 16 models were studied as part of literature review followed by a qualitative three-round Delphi survey for SM key factors and validated using a quantitative questionnaire survey. The findings were analysed using structural equation modelling and a model fit test. Findings PSI, IMF factors directly influence PPP SM success model hence are key constructs. Furthermore, stakeholder consideration, a clear statement of objectives, adopting design and build are variables established as influencing PPP projects failures. Stakeholder identification, engagement, communication and analysis are generic factors. Practical implications Project managers can achieve stakeholder satisfaction and improve PPP projects delivery by considering the innovative PPP SM model. Furthermore, considering the identified factors and variables in holistic models will enhance stakeholder involvement thereby curbing PPP projects failure. Social implications Reducing PPP projects’ failure will enhance socio-economic growth. Originality/value PSI; IMF factors have never been included in holistic PPP SM model. They are proposed to curb PPP projects’ failure.

2019 ◽  
Vol 27 (1) ◽  
pp. 205-226
Author(s):  
Bon-Gang Hwang ◽  
Xiaojing Zhao ◽  
Jane Lim

Purpose Green building is a promising approach to improve resource efficiency and achieving sustainable development. The success of green construction projects is closely associated with the performance of project managers (PMs), while job satisfaction plays a major role in the performance of PMs. However, the emphasis placed on the job satisfaction of PMs in green construction projects remains minimal. The purpose of this paper is to identify the relationships between the job satisfaction of PMs and its key influencing factors in green construction projects, and to propose feasible strategies to improve the job satisfaction of PMs. Design/methodology/approach A questionnaire survey is conducted, data collected from 105 construction PMs are analysed using structural equation modelling. Interviews with five industry experts are further conducted to substantiate the results. Findings The results identified four major components of job satisfaction, namely, “job content”, “resource adequacy”, “work context” and “the personality and competence of jobholders”. The analysis also found that “technical requirement” and “split incentive” condition of green construction projects, “the expertise and awareness of PMs” and “demand and support from stakeholders” has significant impacts on PMs’ job satisfaction. Furthermore, this study developed eight strategies to improve PMs’ job satisfaction, including “increase recognition opportunities for PMs”, “government incentives and financial support” and “introductory and training courses on green construction legislation and processes”. Originality/value The findings assist construction companies in formulating measures to improve the job satisfaction and performance of PMs in green construction projects.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Nathaniel Ayinde Olatunde ◽  
Henry A. Odeyinka

PurposeStudies on stakeholder management (SM) in developing countries have largely focused on public projects. However, projects of private organisations also need much improvement. The purpose of the study was to examine the extent of SM practices in building projects procured by private corporate organisations.Design/methodology/approachPurposive sampling technique was used to select project managers (PMs) and client representatives (CRs) who have been involved in projects procured by private corporate organisations between 2008 and 2017 in Southwestern Nigeria. The PMs are comprised of executive and non-executive PMs as well as contract administrators. Both the PMs and CRs were requested to provide information on one building project in which they were involved within the period under consideration. The data collected were analysed using mean score (MS) analysis, t-test, and analysis of variance.FindingsThe results showed that structured SM processes were followed in only 30.65% of building projects procured by private corporate organisations in the study area. Results further showed on a five-point scale 5-max scale that SM practice was highest with an MS of 3.92 on projects where executive PMs were appointed and lowest (MS = 2.85) on projects where PMs were appointed as contract administrators. Furthermore, it was found that respondents placed the highest premium (MS = 3.73) on stakeholder identification while they placed the lowest premium (MS = 3.45) on developing implementation strategies and stakeholder classification.Practical implicationsThe study examines the status quo regarding SM practice in the study area in order to devise a means of refinement.Originality/valueThe study is an attempt to evaluate the premium placed on different components of SM practices by differing categories of project managers.


2017 ◽  
Vol 24 (3) ◽  
pp. 426-450 ◽  
Author(s):  
Jurbe Joseph Molwus ◽  
Bilge Erdogan ◽  
Stephen Ogunlana

Purpose Stakeholder management plays a significant role in successfully delivering construction projects. However, being able to carry out effective stakeholder management in construction is contingent upon understanding the interrelationships among critical success factors (CSFs) for stakeholder management in construction and how they are related to project success (PS). This would enable the persons responsible for stakeholder management to know the logical process for addressing the CSFs in order to get stakeholder management right. The understanding of this relationship has not been addressed. The purpose of this paper is to investigate the interrelationships between the CSFs for stakeholder management and PS in construction. Design/methodology/approach From an extensive literature review, 23 CSFs for stakeholder management in construction were identified. A conceptual structural equation model (SEM) of the relationships between CSFs was developed (including measurement and structural models) using the groupings of the CSFs for stakeholder management in construction. A questionnaire survey was used to collect data from construction industry practitioners. The data so collected were analysed using SEM in analysis of moment structures (AMOS). Findings The SEM analysis of data collected resulted in the best fitting measurement model comprising 16 CSFs as indicators of four latent variables, namely, stakeholder characteristics and project characteristics (SCPC); stakeholder analysis (SA); stakeholder dynamics (SD); and stakeholder engagement/empowerment (SE). Furthermore, it was found that only SE has a direct positive impact on PS. The other three constructs SCPC, SA and understanding SD collectively impact on PS through the construct, SE. Research limitations/implications The research reported in this paper was carried out in the UK; hence, the findings may have portrayed the UK construction professionals’ opinion. However, the theoretical principles on which the research was based are general and similar research could be replicated in different countries whose construction procurement processes and industries are structured like those of the UK or otherwise. Practical implications The main contribution of this study to existing knowledge is an empirical evidence of the interrelationships among the CSFs for stakeholder management in construction through their latent variables which is portrayed in the best fitting structural model showing the relationships between the constructs of CSFs for stakeholder management and PS. This should serve as a guide to construction project management team or responsible professionals for undertaking stakeholder management in construction projects. Originality/value The paper contributes to theory by empirically identifying the interrelationships among the CSFs for stakeholder management linking to PS which will serve as a guide to construction professionals.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Nathaniel Ayinde Olatunde ◽  
Imoleayo Abraham Awodele ◽  
Henry Agboola Odeyinka

PurposeThe purpose of the study is to examine the stakeholder identification (SI) methods used in building projects procured by private corporate organisations in Southwestern Nigeria to draw a correlation between methods used for SI and project performance in the study area, thereby enhancing project performance.Design/methodology/approachThe study used a census survey to purposively select 30 projects managers (who indicated from a first-stage questionnaire) that they have participated in structured stakeholder management (SM) from a list of 106 project managers and client representatives who have been involved in SM of building projects procured by private corporate organisations between 2008 and 2017 in the study area. A second-stage questionnaire was designed to elicit information from the respondents. The quantitative data that were collected were analysed using mean score (MS) analysis and Analysis of variance (ANOVA).FindingsThe study found that brainstorming in group meetings (MS = 4.33), interviews with the expert (MS = 3.20) and identification by other stakeholders (MS = 3.00) are the most frequently used SI methods in the study area. It was also found that the use of a questionnaire (MS = 0.87), Delphi method (MS = 0.80) and public hearing (MS = 0.57) was rare for SI in the study area. A further result showed that there was no significant difference in the opinion of project managers on 85% of methods used for SI in the study area irrespective of the procurement method employed.Practical implicationsThe study examined the methods project managers used for SI on building projects procured by private corporate organisations to advocate for more robust and all-inclusive SI methods.Originality/valueThe study empirically examined methods used for SI and correlated them to project performance.


2018 ◽  
Vol 25 (6) ◽  
pp. 690-706 ◽  
Author(s):  
Rebecca Jing Yang ◽  
Sajani Jayasuriya ◽  
Chathuri Gunarathna ◽  
Mehrdad Arashpour ◽  
Xiaolong Xue ◽  
...  

Purpose The complicated nature of megaprojects requires appropriate analysis of multiple stakeholders to achieve project objectives and to accommodate stakeholder interests. During the last two decades, many stakeholder theories and empirical studies have sprouted. Although previous studies have contributed to the development of stakeholder theory, it seems that these theoretical advances have not been fully adopted and acknowledged in practices, especially in megaprojects. The purpose of this paper is to explore the evolution of stakeholder analysis and engagement practices adopted in the Australian megaprojects over the last two decades. Design/methodology/approach Four mega construction projects are described and analysed in this study. Secondary data were first assembled in order to get general knowledge of each case. Interviews were conducted with the project directors. Project documents were collected from the project teams and reviewed. Wherever the project information was unclear, e-mails were sent to the directors and the team members to confirm the details. Findings Project teams have started to apply snowball rolling and stakeholder attribute assessment methods to analyse stakeholders. However, there is still a way to adopt the “network” analysis perspective because the project teams are reluctant to use complicated tools which need specialists’ assistance. The stakeholder engagement practices have evolved to an extent where the project teams monitor the dynamics of stakeholders’ requirements. Projects teams have identified the importance of continuity to manage stakeholders in these massive projects. However, a structured method selection mechanism for stakeholder engagement has not been developed. Originality/value This study will help academics to understand the adoption progress and status of stakeholder management methods.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benviolent Chigara ◽  
Tirivavi Moyo

Purpose The purpose of this study was to investigate the perceptions of construction professionals relative to factors that affect the delivery of optimum health and safety (H&S) on construction projects during the COVID-19 pandemic. Design/methodology/approach The study adopted a quantitative design which entailed the distribution of a web-based questionnaire among construction professionals, namely, architects, construction/project managers, engineers, H&S managers and quantity surveyors working for contractors and construction consultants in Zimbabwe. The data were analysed with descriptive and inferential statistics. Factor analysis was used to reveal interrelated significant sets of factors affecting the delivery of optimum H&S. Findings Factor analysis revealed nine components/factors: change and innovation-related, monitoring and enforcement-related, production-related, access to information and health service-related, on-site facilities and welfare-related, risk assessment and mitigation-related, job security and funding-related, cost-related and COVID-19 risk perception-related factors as the significant factors affecting the delivery of optimum H&S during the COVID-19 pandemic in Zimbabwe. Research limitations/implications The results highlighted the need for social dialogue among construction stakeholders to support initiatives that will enhance the delivery of H&S on construction projects. Construction stakeholders may find the results useful in highlighting the areas that need improvement to protect workers’ H&S during the pandemic. However, the small sample limits the generalisability of the results to construction sectors in other regions. Originality/value The study investigated factors affecting the delivery of optimum H&S during the COVID-19 to inform interventions to enhance H&S.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Charles Igwe ◽  
Fuzhan Nasiri ◽  
Amin Hammad

PurposeThis study highlights the findings of an empirical study to investigate waste factors (WFs) affecting the performance and delivery of construction projects in developing countries. The objectives of this study are to identify non-physical WFs in developing nations and rank the identified factors based on their degree of influence on the key performance indicators (KPIs) of cost, quality and time.Design/methodology/approachIn total, 34 WFs were identified through a detailed literature review and consolidated using semi-structured interviews with construction practitioners. The statistical analysis involved a normality test using the Shapiro–Wilk test to determine if sample data have been drawn from a normally distributed population, ranking the WFs using the Frequency Index (FI), Severity Index (SI) and Importance Index (IMPI), ranking the WFs based on their effect on the project KPIs of cost, quality and time, and identify clustering structures for the identified WFs to using factor analysis (FA).FindingsThe results revealed ineffective planning and scheduling, rework/repair of defective work and resource quality problems (human, material and equipment) as the three most important WFs affecting construction projects. The factor analyses showed that WFs can be grouped into five interrelated components, suggesting the need for integrated and holistic strategies to overcome the identified WF.Practical implicationsUnderstanding the effects of WFs on construction projects is a first step towards designing holistic solutions to ensuring projects deliver value to the clients and other stakeholders. The findings of this study provide direction to construction practitioners on where to focus appropriate strategies to manage the identified WFs effectively and, therefore, improve the productivity of construction projects.Originality/valueThis study provides the first holistic analysis of WFs affecting the productivity of construction projects in developing countries.


2017 ◽  
Vol 24 (5) ◽  
pp. 736-756 ◽  
Author(s):  
Albert P.C. Chan ◽  
Goodenough D. Oppong

Purpose The consideration of external stakeholders has proven to be more critical than internal stakeholders in construction projects. The purpose of this paper is to present the diverse expectations of external stakeholder groups, i.e. governmental authorities, general public, and affected local communities, in construction projects. The practical steps to manage the expectations are also outlined. Design/methodology/approach A three-stage methodology was adopted for the review. The primary terms “stakeholder,” “project participants,” or “project environment” were first searched in four popularly search engines and eight top journals that publish construction research to retrieve publications. After a second-stage filtering process, the selected data were then analyzed and reviewed in line with the objectives. Findings In total, 49 common expectations were identified and classified. The results indicate that each stakeholder group pursues expectations in line with the social, environmental, and economic sustainability objectives. For effective management, project managers (PMs) must know stakeholder opportunities and threats, fulfill social responsibilities, establish common goals, apply appropriate strategies, and enhance stakeholder satisfaction. Research limitations/implications The identified expectations are only based on the selected publications. Even though the expectations have been categorized in line with the triple bottom line model, the relative importance of the expectations cannot be ascertained since there is no empirical support. Practical implications PMs can play safe by acknowledging the stakeholder expectations and employ such strategies to curtail resulting impacts and maximize mutual benefits. The list of expectations could also be used to promote equitable value optimization in projects, enhance needs fulfillment, and facilitate the evaluation of external stakeholder satisfaction. Originality/value This study provides a comprehensive checklist of construction stakeholder expectations which hitherto, is lacked in the literature. Moreover, practical steps to manage the expectations of external stakeholders have been discussed.


2021 ◽  
Vol 56 (3) ◽  
pp. 473-484
Author(s):  
Zulkifli Lubis

The biggest threat that results in the project not being successful is failure to build a stakeholder project. Based on research on construction projects in developing countries, the lack of communication among workers due to cultural uniformity and the uniqueness of their respective regions can become work constraints that can affect implementation performance and productivity, namely, there is a 69.61% decrease in time performance. The main objective of this research is to analyze the role of communication management in improving the performance of construction project managers in developing countries, particularly the role of construction managers in implementing a construction project. This research uses a qualitative approach and a case study method. Sampling using purposive sampling. Forum Group Discussion to see how the opinions of construction project managers in Indonesia view the importance of communication management in the success of construction projects. The study results explain that the need for Public Relations Infrastructure management plays a role in ensuring various policies and communication to the public. This is a reflection of the effective function of public relations in the implementation of infrastructure development. In carrying out the construction, the construction project manager must pay attention to communication dynamics to support the success of infrastructure development projects. Contractors and other parties involved in infrastructure development must raise awareness of the essence of effective communication in fostering trust in the public concerned with infrastructure development.


2018 ◽  
Vol 11 (3) ◽  
pp. 761-782 ◽  
Author(s):  
Shamil George Naoum ◽  
Carlos Herrero ◽  
Charles Egbu ◽  
Daniel Fong

Purpose It is axiomatic that construction is a fast-paced and competitive industry, which goes hand in hand with many construction professionals suffering from stress including construction project managers (C-PMs). The role of C-PMs is crucial to achieving project success as they are responsible for planning the project, organising human resources, controlling operations and the budget, and forecasting probable difficulties. The purpose of this paper is to investigate the causal relationships between stressors, stresses, stress-coping behaviours and their impact on the performance of C-PMs. Design/methodology/approach To investigate the relationships between stress and performance among C-PMs, a questionnaire was designed based on the extensive literature, and was sent to 150 C-PMs who had amassed at least five years’ direct working experience in the construction industry. A total of 44 completed questionnaires were returned. Correlation analysis and structural equation modelling were employed to understand the integrated relationships between these factors. Based on the data collected and analysis of the results, an integrated structural equation model of the stresses and performances of C-PMs was developed using AMOS version 22.0. Findings The results of structural equation modelling reveal the following: burnout is the type of stress that has the highest impact on the performance of C-PMs, being detrimental to their interpersonal performance (IPP) and positive for their organisational performance (OP), whereas physiological stress worsens the task performance of C-PMs and objective stress improves their IPP. The most active stressor towards the performance of C-PMs is “workgroup cooperation”, which has an impact on the IPP in a positive way but is detrimental to the OP. Career-developing environment, poor organisational structure and role conflict affect both stress and performance together. Originality/value This study provides a comprehensive investigation into the impact of various types of stress on the performances of C-PMs. The result constitutes a significant step towards the stress management of C-PMs in the dynamic and stressful construction industry.