Asset Integrity Assessment and Management Program for Life Preservation of a Purpose Built FPSO and Associated Subsea System Facilities

Author(s):  
Abe Nezamian ◽  
Robert J. Nicolson

Floating facilities for production, storage and offtake (FPSO) and other offshore production facilities have been used safely and reliably throughout the oil industry for many years. Asset Integrity is increasingly important to optimising safety and operational life and asset performance efficiency. Operators need to comply with Corporate, Regulatory and Certification requirements but recognise that developing and managing an effective and compliant Asset Integrity Management System is both time consuming and costly. Review of operational history of existing large FPSOs around the world indicated low confidence in operational life expectancy and to achieve the design life without possible dry docking or major repair. FPSOs have certain loading characteristics and damage consequences that make them different to other offshore installations and conventional ships, and often more challenging to maintain and operate. Maintenance and inspection campaigns are important inputs in the Asset Integrity Management (AIM) system of FPSOs and other floating offshore facilities. Considering that the unit shall stay on site during the whole life of the field, where disconnection or the removal of the mooring system is not planned, a comprehensive methodology for the asset integrity management, survey, inspection, testing, maintenance and repair of the unit during this period needs to be developed and subject to review based on the results of the scheduled inspections and audits. So as well as class and statutory requirements, inspection and survey, maintenance and repair plans should reflect the required availability, functionality, survivability and durability of the unit, giving due regard to its field life, as part of the safety management of the facility. Risk Based Integrity management methodology has been adopted in several projects and is an important tool to establish a rational inspection campaign for structural components, mainly for those located in areas where access is critical and operational constraints are an important parameter. This paper gives an overview of the challenges and discusses various aspects of ageing related to FPSO facilities, represented risk to the integrity of a facility and the required procedures and reassessment criteria for maintaining the structural integrity. This paper also provides an overall view on the regulatory requirements, documentation and calibrations/validations of the original design values to maintain the safety level by means of a maintenance and inspection programs balancing the ageing mechanisms and improving the reliability of assessment results. A brief summary of an example project of an asset integrity assessment and management program for life preservation of a purpose built FPSO and associated subsea system facilities is presented.

Author(s):  
C. J. Billington ◽  
S. A. Caruana

The offshore industry has experienced significant changes in the regulation and control of oil and gas exploration and production. The move away from the prescriptive approach towards a goal-setting regime gives Duty Holders greater control and accountability over the safety management of operations. Whilst this approach encourages greater ownership of safety by Duty Holders and provides greater flexibility, it also places greater demands and responsibility for ongoing integrity management, particularly when operational life is extended beyond the original specification with the need to account for the ageing mechanisms. Therefore it is increasingly important to ensure that those responsible for integrity management have all the necessary competences for this task and that the Duty Holder provides the necessary system competence to support this activity. This paper examines the factors which influence competence throughout the life-cycle of Structural Integrity Management (SIM) activities, and provides a model that relates this to a systematic safety management context.


2010 ◽  
Vol 26 (02) ◽  
pp. 106-110
Author(s):  
Ge Wang ◽  
Michael Lee ◽  
Chris Serratella ◽  
Stanley Botten ◽  
Sam Ternowchek ◽  
...  

Real-time monitoring and detection of structural degradation helps in capturing the structural conditions of ships. The latest nondestructive testing (NDT) and sensor technologies will potentially be integrated into future generations of the structural integrity management program. This paper reports on a joint development project between Alaska Tanker Company, American Bureau of Shipping (ABS), and MISTRAS. The pilot project examined the viability of acoustic emission technology as a screening tool for surveys and inspection planning. Specifically, testing took place on a 32-year-old double-hull Trans Alaska Pipeline System (TAPS) trade tanker. The test demonstrated the possibility of adapting this technology in the identification of critical spots on a tanker in order to target inspections. This targeting will focus surveys and inspections on suspected areas, thus increasing efficiency of detecting structural degradation. The test has the potential to introduce new inspection procedures as the project undertakes the first commercial testing of the latest acoustic emission technology during a tanker's voyage.


2009 ◽  
Vol 413-414 ◽  
pp. 219-228 ◽  
Author(s):  
John R. Maguire

This case study describes a structural integrity assessment of a 220 kV overhead power line. The line comprises 70 pylons over a distance of approximately 30 km, predominantly in a valley location. The pylons are spaced at intervals of approximately 400 m and each pylon is approximately 32 m in height. The line was originally constructed in the 1950’s, approximately 50 years prior to the requested structural integrity assessment. This paper describes the independent assessment that was carried out. The review established site-specific safety factors at the time of original design and construction; at the time of the review (2007), accounting for the possible presence of the “Thomasstahl” steel; and in the future, at the anticipated end of pylon life (in 2012).


Sensors ◽  
2020 ◽  
Vol 20 (2) ◽  
pp. 525
Author(s):  
Virgil Florescu ◽  
Stefan Mocanu ◽  
Laurentiu Rece ◽  
Robert Ursache ◽  
Nicolae Goga ◽  
...  

This paper introduces a new method for the use of tensor-resistive sensors in large spherical storage tank equipment (over 12,000-mm diameters). We did an experiment with 19 petroleum or ammonia product sphere-shaped storage tanks with volumes of 1000 and 1800 cubic meters, respectively. The existing literature only contains experiments based on sensors for tanks with diameters no larger than 600 mm. Based on a number of resistive strain sensor measurements on large spherical pressurized vessels regarding structural integrity assessment, the present paper is focused on the comparison between "real-life" obtained sensor data versus finite element method (FEM) simulation results. The present paper is structured in three parts and examines innovative directions: the use of the classic tensor-resistive sensors in a new approach concerning large structural equipment; an original 3D modeling method with the help of the FEM; and conclusions with possible implications on the regulations, design, or maintenance as a result of the attempt of mutual validation of the new methods previously mentioned.


Author(s):  
Ingar Scherf ◽  
Trine Hansen ◽  
Gudfinnur Sigurdsson

Offshore Structures operate for decades in extremely hostile environments. It is important during this period that the structural integrity is efficiently managed to ensure continuous and safe operation. Increased use of enhanced oil and gas recovery means it is likely that many existing installations will remain operational for a significant period beyond the original design life. The operator needs to capture, evaluate and, if necessary, mitigate design premise changes which inevitably occur during the life of a structure. Further, advances in knowledge and technology may imply changes in codes and standards as well as in analysis methodologies. Changes in corporate structures, transfer of operator responsibility and retirement of experienced engineers call for reliable means to transfer historical data and experience to new stakeholders. Effective emergency preparedness capabilities, structural integrity assessments and inspection planning presuppose that as-is analysis models and corresponding information are easily accessible. This paper presents an implementation of the in-service integrity management process described in the new revision of NORSOK standard N-005 [1] for a large fleet of jackets at the Norwegian Continental Shelf. The process, comprising management of design premise changes as well as state-of-the-art technical solutions over a range of disciplines, has enabled the operator to prolong the service life with decades at minimum investments. A structure integrity management system (SIMS) has been developed and digitized over years and streamlined to meet the needs and challenges in the operation and management of the jacket platforms. SIMS enables a rather lean organization to control the structural integrity status of all load-bearing structures at any time. Platform reinforcements and modifications along with other operational risk reducing measures like unman the platforms in severe storms enable continued use with the same level of safety as for new manned platforms. Advanced analyses are used to document regulatory compliance. Modern fatigue and reliability based inspection planning analyses have reduced the costs needed for inspection of fatigue cracks significantly. The benefits from the SIMS system are substantial and the resulting safety and productivity gains are apparent. The continuity of knowledge and experience is maintained, reducing risk to safety and regularity. The digital transformation related to management of structural integrity status as described in NORSOK standard N-005 is realized through SIMS.


Author(s):  
Abe Nezamian ◽  
Joshua Altmann

The ageing of offshore infrastructure presents a constant and growing challenge for operators. Ageing is characterised by deterioration, change in operational conditions or accidental damages which, in the severe operational environment offshore, can be significant with serious consequences for installation integrity if not managed adequately and efficiently. An oil field consisting of twelve well head platforms, a living quarter platform (XQ), a flare platform (XFP) and a processing platform (XPA) are the focus of this paper, providing an overview of the integrity assessment process. In order to ensure technical and operational integrity of these ageing facilities, the fitness for service of these offshore structures needs to be maintained. Assessments of the structural integrity of thirteen identified platforms under existing conditions were undertaken as these platforms are either nearing the end of their design life or have exceeded more than 50% of their design life. Information on history, characteristic data, condition data and inspection results were collected to assess the current state and to predict the future state of the facility for possible life extension. The information included but was not limited to as built data, brown fields modifications, additional risers and clamp-on conductors and incorporation of subsea and topside inspection findings. In-service integrity assessments, pushover analyses, corrosion control and cathodic protection assessments and weight control reports were completed to evaluate the integrity of these facilities for requalification to 2019 and life extension to 2030. The analytical models and calculations were updated based on the most recent inspection results and weight control reports. A requalification and life extension report was prepared for each platform to outline the performance criteria acceptance to achieve requalification until 2019 and life extension until 2030. This paper documents the methodology to assess the platform structural integrity in order to evaluate platform integrity for the remaining and extended design life. An overview of various aspects of ageing related to these offshore facilities, representing risk to the integrity, the required procedures and re assessment criteria for deciding on life extension of these facilities is presented. This paper also provides an overall view of the structural requirements, justifications and calibrations of the original design for the life extension to maintain the safety level by means of maintenance and inspection programs balancing the ageing mechanisms and improving the reliability of assessment results.


Author(s):  
Hao Song ◽  
Chenteh Alan Yu ◽  
Yongming Cheng ◽  
Jing Hou

Abstract The riser is a critical element in a subsea production system for transporting hydrocarbons from the seafloor to the surface. The track record of existing riser systems worldwide has shown that risers tend to be designed conservatively to accommodate dynamic loads, strength and fatigue requirements, and corrosion/erosion provision needs. Among all the riser types, the steel catenary riser (SCR) is the most installed riser configuration for deepwater oil and gas production worldwide in the last two decades. This is mainly because of their simple configuration and relatively low manufacturing and installation cost. As riser technology advances, SCRs are designed to tackle more challenging environments and longer service lives. For the riser life extension applications, regulatory bodies prefer riser operations to be managed through an integrity management program, demonstrating that a robust framework with detailed records on the conditions of the risers is in place. This paper studies an integrity management program for SCRs with a 30-year design life in a harsh environment. The planned riser integrity management program is based on successful industry practice and the newly published riser integrity management standard API RP 2RIM [4]. It starts with a review of the riser design basis and as-built data, continuing with key field data measurement and production fluid sampling. A digital model, continuously calibrated with the measured data, is established to assess the integrity of the riser system. Key physical quantities are selected to monitor the structural health of the SCRs, including vessel motion measurement, measurement of SCR top hang-off angles and tensions, and full water column current measurement. The relationship between the measurement data and the riser strength and fatigue performance is established. Details of the riser integrity assessment in a digital model utilizing the measurement data are presented. The implemented proposed riser integrity management program is expected to provide a more focused and efficient method with a higher level of confidence in operating the SCRs during the design life and potentially beyond.


Author(s):  
Honglong Zheng ◽  
Muyang Ai ◽  
Lijian Zhou ◽  
Mingfei Li ◽  
Ting Wang ◽  
...  

As a preventative management mode, integrity management which is significantly effective is now applicable in modern industry. Based on the successful application of integrity management for the pipeline, managers expect an extension of the integrity management program for the oil and gas stations such as pumping stations, so as to make the best arrangement of resources and guarantee the safety of station facilities. The differences between station integrity management system in China and abroad are analyzed. It is claimed that the oil and gas station integrity management is more difficult and complicated in China. An integrity management program is developed for the oil and gas stations in China. The authors summarily introduce the station integrity management framework, and determine the processes and elements of management. For the main parts of the stations are plenty of facilities, the authors attempt to carry out the management on each category of facilities in particular. According to the characteristics and working status, field facilities can be classified into three categories: static facilities, dynamic facilities, and electrical instruments. For all these facilities, integrity management approach consists of five steps: data collection, risk assessment, integrity assessment, repair & maintenance, and performance evaluation. Station integrity management system comprises five aspects: system documents, standards & specifications, supporting technologies, management platforms and applications. This paper should be considered as a reference for the oil and gas station integrity managers in the future.


Author(s):  
P. Babics ◽  
S. Ratkai ◽  
D. Szabo ◽  
P. Trampus

The owner of Paks NPP, Hungary’s nuclear generating facility, is aiming at adjusting the ISI program to meet ASME Code requirements. The objective is to achieve an internationally acceptable level in structural integrity assessment of long-lived and passive components, and to create the basis for a proper ageing management program for the operations period beyond design life of the units. Apart from this, it would allow to extend the current four-year inspection interval for Class 1 components up to an eight-year one, which would contribute to a more cost-efficient operation and maintenance. Hungarian nuclear regulatory regime gives an opportunity for this because the nuclear safety regulation does not determine explicitly the applicable codes neither for the design nor for the ISI. First, the basic regulatory principles related to ASME adaptation will be summarized. They focus on aspects of maintaining the current licensing basis as well as on the necessity to demonstrate the compliance with Section III requirements. The substantial part of the work is the construction review of selected Class 1 and 2 components. Then, the results of comparison of the current ISI program, mainly based on Russian normative documents, and the Section XI based one will be shown. These comparative studies have justified the feasibility of the project. The licensing of the ASME based ISI program is under way, and the regulator’s position will be presented as well.


Author(s):  
M. Robb Isaac ◽  
Saleh Al-Sulaiman ◽  
Monty R. Martin ◽  
Sandeep Sharma

In early 2005, Kuwait Oil Company (KOC) initiated a Total Pipeline Integrity Management System (TPIMS) implementation in order to carry out a major integrity assessment of its operating facilities, equipment, buried plant piping and pipeline network and to establish a continuing integrity management program. KOC Transit System is a complex infrastructure consisting of over three hundred pipelines, thousands of wellhead flow lines, and consumer and offshore lines for which there was a significant loss of data when the facilities were destroyed during a military invasion in 1990. An initial pipeline system assessment identified issues and actions regarding condition of the pipelines, corridors, requirements on in-line inspection (ILI), documentation, RISK assessment, status of international code compliance, and overall state of the system. Following recommendations from that initial assessment led to the development of a long term strategy; the execution of which required the implementation of a comprehensive integrity management program. This case study discusses the results obtained after five years of implementation of TPIMS at KOC. It will demonstrate some of the complex components involved in managing the integrity of the Transit System that have been made possible through the implementation of the system. The general concept and structure of TPIMS will be described, and how it deals with the complexity of the KOC pipeline system. The system made it possible to integrate and manage data from various sources, by conducting integrity assessment using ILI, Direct Assessment and hydrostatic testing, as well as structure a comprehensive RISK & Decision Support mechanism. This is one of the world’s first implementations of this magnitude which encompasses such a wide range of services and variables; all being managed in a single environment and utilized by a multitude of users in different areas at KOC. The biggest challenge in a project of this scope is data management. Examples will be shown of the integration structure to illustrate the benefits of using a single comprehensive and versatile platform to manage system requirements; ultimately providing system reliability and improving overall operational efficiency.


Sign in / Sign up

Export Citation Format

Share Document