scholarly journals Research on the Law of Large-Scale Deformation and Failure of Soft Rock Based on Microseismic Monitoring

2018 ◽  
Vol 2018 ◽  
pp. 1-8 ◽  
Author(s):  
Feng Chen ◽  
Tianhui Ma ◽  
Chun’an Tang ◽  
Yanhong Du ◽  
Zhichao Li ◽  
...  

Based on the existing Canadian ESG microseismic monitoring system, a mobile microseismic monitoring system for a soft rock tunnel has been successfully constructed through continuous exploration and improvement to study the large-scale nucleation and development of microfractures in the soft rock of the Yangshan Tunnel. All-weather, continuous real-time monitoring is conducted while the tunnel is excavated through drilling and blasting, and the waveform characteristics of microseismic events are analysed. Through the recorded microseismic monitoring data, the variation characteristics of various parameters (e.g., the temporal, spatial, and magnitude distributions of the microseismic events, the frequency of microseismic events, and the microseismic event density and energy) are separately studied during the process of large-scale deformation instability and failure of the soft rock tunnel. The relationship between the deterioration of the rock mass and the microseismic activity during this failure process is consequently discussed. The research results show that a microseismic monitoring system can be used to detect precursors; namely, the microseismic event frequency and energy both will appear “lull” and “active” periods during the whole failure process of soft rock tunnel. Two peaks are observed during the evolution of failure. When the second peak occurs, it is accompanied by the destruction of the surrounding rock. The extent and strength of the damage within the surrounding rock can be delineated by the spatial, temporal, and magnitude distributions of the microseismic events and a microseismic event density nephogram. The results of microseismic analysis confirm that a microseismic monitoring system can be used to monitor the large-scale deformation and failure processes of a soft rock tunnel and provide early warning for on-site construction workers to ensure the smooth development of the project.

2021 ◽  
Vol 11 (19) ◽  
pp. 8906
Author(s):  
Wenqi Ding ◽  
Shi Tan ◽  
Rongqing Zhu ◽  
He Jiang ◽  
Qingzhao Zhang

The weakening effect is one of the most important causes triggering large deformation and failure of soft-rock engineering; however, few studies paid attention to damage evolution and constitutive relationship of rock in tensile damage in the excavation unloading and water-weakening process, not to mention the coupling process of unloading and water-weakening. In this paper, the mechanism and engineering characteristics of unloading softening and water-softening of water-rich soft rock are analyzed and summarized. Then with the aid of the strain equivalent principle, the damage of surrounding rock caused by unloading softening and water-softening is coupled, and the compression shear damage and the tensile damage of surrounding rock under the unloading process are analyzed. A damage constitutive model of rock subjected to excavation unloading and water-weakening is proposed considering the influence of water immersion time, and the proposed model is applied in a newly established finite element simulation method, which is suitable for excavation in the water-rich soft rock. Based on the mechanical-hydraulic-damage coupled method, the progressive failure process of surrounding rock under the dual softening effects can be reflected by the deteriorated parameters of damage elements. Finally, the field monitoring data of a typical section in the Xujiadi tunnel is used to verify the applicability and accuracy of the proposed dual softening model and simulation method.


Minerals ◽  
2021 ◽  
Vol 11 (4) ◽  
pp. 423
Author(s):  
Chunde Ma ◽  
Jiaqing Xu ◽  
Guanshuang Tan ◽  
Weibin Xie ◽  
Zhihai Lv

Red shale is widely distributed among the deep mine areas of Kaiyang Phosphate Mine, which is the biggest underground phosphate mine of China. Because of the effect of various factors, such as high stress, ground water and so on, trackless transport roadways in deep mine areas were difficult to effectively support for a long time by using traditional supporting design methods. To deal with this problem, some innovative works were carried out in this paper. First, mineral composition and microstructure, anisotropic, hydraulic mechanical properties and other mechanical parameters of red shale were tested in a laboratory to reveal its deformation and failure characteristics from the aspect of lithology. Then, some numerical simulation about the failure process of the roadways in layered red shale strata was implemented to investigate the change regulation of stress and strain in the surrounding rock, according to the real rock mechanical parameters and in-situ stress data. Therefore, based on the composite failure law and existing support problems of red shale roadways, some effective methods and techniques were adopted, especially a kind of new wave-type bolt that was used to relieve rock expansion and plastic energy to prevent concentration of stress and excess deformation. The field experiment shows the superiorities in new techniques have been verified and successfully applied to safeguard roadway stability.


2011 ◽  
Vol 90-93 ◽  
pp. 2307-2312 ◽  
Author(s):  
Wen Jiang Li ◽  
Su Min Zhang ◽  
Xian Min Han

The stability judgement of surrounding rock is one of the key jobs in tunnel engineering. Taking the Erlongdong fault bundle section of Guanjiao Tunnel as the background, the stability of surrounding rock during construction of soft rock tunnel was discussed preliminarily. Based on plastic strain catastrophe theory, and combining numerical results and in-situ data, the limit displacements for stability of surrounding rock were analyzed and obtained corresponding to the in-situ monitoring technology. It shows that the limit displacements obtained corresponds to engineering practice primarily. The plastic strain catastrophe theory under unloading condition provides new thought for ground stability of deep soft rock tunnel and can be good guidance and valuable reference to construction decision making and deformation managing of similar tunnels.


2021 ◽  
Author(s):  
Shengrong Xie ◽  
Yiyi Wu ◽  
Dongdong Chen ◽  
Ruipeng Liu ◽  
Xintao Han ◽  
...  

Abstract In deep underground mining, achieving stable support for roadways along with long service life is critical and the complex geological environment at such depths frequently presents a major challenge. Owing to the coupling action of multiple factors such as deep high stress, adjacent faults, cross-layer design, weak lithology, broken surrounding rock, variable cross-sections, wide sections up to 9.9 m, and clusters of nearby chambers, there was severe deformation and breakdown in the No. 10 intersection of the roadway of large-scale variable cross-section at the − 760 m level in the Nanfeng working area of the Wuyang Coal Mine. As there are insufficient examples in engineering methods pertaining to the geological environment described above, the numerical calculation model was oversimplified and support theory underdeveloped; therefore, it is imperative to develop an effective support system for the stability and sustenance of deep roadways. In this study, a quantitative analysis of the geological environment of the roadway through field observations, borehole peeking, and ground stress testing is carried out to establish the FLAC 3D variable cross-section crossing roadway model. This model is combined with the strain softening constitutive (surrounding rock) and Mohr-Coulomb constitutive (other deep rock formations) models to construct a compression arch mechanical model for deep soft rock, based on the quadratic parabolic Mohr criterion. An integrated control technology of bolting and grouting that is mainly composed of a high-strength hollow grouting cable bolt equipped with modified cement grouting materials and a high-elongation cable bolt is developed by analyzing the strengthening properties of the surrounding rock before and after bolting, based on the Heok-Brown criterion. As a result of on-site practice, the following conclusions are drawn: (1) The plastic zone of the roof of the cross roadway is approximately 6 m deep in this environment, the tectonic stress is nearly 30 MPa, and the surrounding rock is severely fractured. (2) The deformation of the roadway progressively increases from small to large cross-sections, almost doubling at the largest cross-section. The plastic zone is concentrated at the top plate and shoulder and decreases progressively from the two sides to the bottom corner. The range of stress concentration at the sides of the intersection roadway close to the passageway is wider and higher. (3) The 7 m-thick reinforced compression arch constructed under the strengthening support scheme has a bearing capacity enhanced by 1.8 to 2.3 times and increase in thickness of the bearing structure by 1.76 times as compared to the original scheme. (4) The increase in the mechanical parameters c and φ of the surrounding rock after anchoring causes a significant increase in σc and σt; the pulling force of the cable bolt beneath the new grouting material is more than twice that of ordinary cement grout, and according to the test, the supporting stress field shows that the 7.24 m surrounding rock is compacted and strengthened in addition to providing a strong foundation for the bolt (cable). On-site monitoring shows that the 60-day convergence is less than 30 mm, indicating that the stability control of the roadway is successful.


2020 ◽  
Vol 2020 ◽  
pp. 1-11
Author(s):  
Rui Wang ◽  
Yiyuan Liu ◽  
Xianghui Deng ◽  
Yu Zhang ◽  
Xiaodong Huang ◽  
...  

With the rapid development of tunnel construction in China, deep buried and long tunnel projects are emerging in areas with complex engineering geological conditions and harsh environment, and thus large deformation of tunnels under conditions of high in situ stress and soft rock becomes increasingly prominent and endangers engineering safety. Therefore, it is of great significance to control the deformation and improve the stability of surrounding rock by analyzing the thickness and distribution law of loose circle according to the unique mechanical properties and failure mechanism of surrounding rock of large deformation soft-rock tunnel. Based on unified strength theory, this paper deduces the radius calculation formula of the loose circle by considering the influence of intermediate principal stress. Furthermore, the theoretical calculations and field tests of the loose circle in the typical sections of grade II and III deformation of Yuntunbao tunnel are carried out, and the thickness and distribution law of loose circle of surrounding rock of large deformation soft-rock tunnel is revealed. The results show that the formula based on the unified strength criterion is applicable for a large deformation tunnel in soft rock.


2020 ◽  
Vol 2020 ◽  
pp. 1-20
Author(s):  
Meng Wang ◽  
Jia-wen Zhou ◽  
An-chi Shi ◽  
Jin-qi Han ◽  
Hai-bo Li

The stability of the surrounding rock masses of underground powerhouses is always emphasized during the construction period. With the general trends toward large-scale, complex geological conditions and the rapid construction progress of underground powerhouses, deformation and failure issues of the surrounding rock mass can emerge, putting the safety of construction and operation in jeopardy and causing enormous economic loss. To solve these problems, an understanding of the origins and key affecting factors is required. Based on domestic large-scale underground powerhouse cases in the past two decades, key factors affecting the deformation and failure of the surrounding rock mass are summarized in this paper. Among these factors, the two most fundamental factors are the rock mass properties and in situ stress, which impart tremendous impacts on surrounding rock mass stability in a number of cases. Excavation is a prerequisite of surrounding rock mass failure and support that is classified as part of the construction process and plays a pivotal role in preventing and arresting deformation and failure. Additionally, the layout and structure of the powerhouse are consequential. The interrelation and interaction of these factors are discussed at the end of this paper. The results can hopefully advance the understanding of the deformation and failure of surrounding rock masses and provide a reference for design and construction with respect to hydroelectric underground powerhouses.


2013 ◽  
Vol 438-439 ◽  
pp. 949-953
Author(s):  
Hao Bo Fan ◽  
Jin Xing Lai ◽  
Dan Dan Hou

This paper based on Chaoyang tunnel by bench method excavation, using the finite element numerical simulation method, simulates the surrounding rock displacement of soft rock tunnel and the stress characteristics of supporting structure to get the various stages of tunnel surrounding rock stress, strain and the internal force changes of tunnel supporting structure. After the analyses of the numerical simulation results and field monitoring measurement data, the safety and rationality of the method are determined. The research provides certain reference for highway tunnel design and construction.


2013 ◽  
Vol 353-356 ◽  
pp. 1440-1445
Author(s):  
Jin Hua Xu ◽  
Chuan He ◽  
Yi Zhou ◽  
Hai Bin Wu

This paper studies on a certain highway project which passes through Longmen Shan fault zone, the one triggers 5.12 Wenchuan earthquakes directly. The region where the project resides is characterized by high percentage of soft rock mass, in particular the phyllite. Series of landslide have hitherto happened due to the instability of mountains along the highway which was caused by the great earthquake. Besides, since the phyllite-dominated rock was low-strength and easily soften by water, engineering disasters such as cave-in and large deformation of surrounding rock occurred frequently during the construction of tunnels located along the highway. The existing deformation control criteria fail gradually to fill the requirements of safe tunnelling. The author analyzed monitoring data from different tunnels with different cross-section types and different surrounding rock conditions, referred to relevant norms and eventually proposes new deformation control criteria based on allowable deformation and deformation rate.


2013 ◽  
Vol 838-841 ◽  
pp. 889-893
Author(s):  
Biao Li ◽  
Feng Dai ◽  
Nu Wen Xu ◽  
Chun Sha

The right bank underground powerhouse of Houziyan hydropower station is a typical deep-buried type with high geostress and complicated geological conditions. To monitor and analyze the stability of surrounding rock mass during continuous excavation of the powerhouse excavation and locate the potential failure zones, an ESG (Engineering Seismology Group) microseismic monitoring system manufactured in Canada was installed in April, 2013. The wave velocity of the monitoring system was determined through fixed blasting tests. And the average location error is the minimum while P-wave velocity is 5700m/s, less than 10m and meeting the system request. By combining the temporal and spatial distribution regularity of microseimic events with field excavation, micro-crack clusters and potential instability zones were identified and delineated. The results will provide a reference for later excavations and supports of the underground powerhouse. Furthermore, a new monitoring method can also be supplied for the stability analysis of surrounding rock mass in deep-buried underground powerhouses.


2011 ◽  
Vol 90-93 ◽  
pp. 2282-2285
Author(s):  
Cheng Bing Wang ◽  
He Hua Zhu ◽  
Hua Lao Wang

The failure conditions of tunnel surrounding rock under different cross section after full face excavation were studied through a number of model tests. The simulation of unsupported tunnel failure process under gravitational stress is carried out successfully in the tests. The test results show that failure of surrounding rock initiates from the upper part of the tunnel and develops upward progressively. Failure form of tunnel is different under different cross section type. Comparing with two-lane tunnel, the surrounding rock of three-lane tunnel keeps shorter stabilization, failure develops to the ground surface more rapidly, the stress changing amplitude of those beside tunnel is larger, and the rock mass on the top of the tunnel slides downward more clearly.


Sign in / Sign up

Export Citation Format

Share Document