scholarly journals Implementation of TQM and the Integration of BIM in the Construction Management Sector in Saudi Arabia

2021 ◽  
Vol 2021 ◽  
pp. 1-9
Author(s):  
Mohammad Abazid ◽  
Hüseyin Gökçekuş ◽  
Tahir Çelik

Total Quality Management (TQM) is based on the conceptions of managing and enhancing the success of construction projects. When applied, TQM improves execution of time management of project, satisfies clients’ needs, minimizes the expenses and increases the profit of contractor, and fulfils safety regulations on the construction site. This research is aimed at evaluating the impacts of employing the concepts of TQM to the construction projects in Saudi Arabia. The results of the study were obtained through utilization of a descriptive analytical approach, where 300 questionnaires were distributed to engineering firms and companies with a response rate of 200 questionnaires, hence achieving the study sample for this research. The data gathered was analyzed by applying the Statistical Package for Social Science (SPSS) program and calculating the relative importance index (RII) and the mean values. From the research conducted, the outcomes showed that the management’s ability to commit using TQM while applying BIM obtained a relative importance of (0.717), while the relative importance for the management’s ability to commit using TQM without the application of BIM is (0.552). The results showed that construction projects in Saudi Arabia still sustain setbacks from applying TQM concepts and suffer from the lack of administrative, scientific, and technical applications.

Author(s):  
Mohammad Abazid ◽  
Hüseyin Gökçekuş ◽  
Tahir Celik

This research is aimed at evaluating two different scenarios, firstly, appraising the impacts of employing the concepts of Total Quality Management (TQM) to the construction projects in Saudi Arabia. The results of the study were obtained through utilization of a descriptive analytical approach, where 300 questionnaires were distributed to engineering firms and companies with a response rate of 200 questionnaires, hence achieving the study sample for this research. The data gathered was analyzed by applying the Statistical Package for Social Science (SPSS) program and calculating the Relative importance index (RII) and the mean values. From the research conducted, the outcomes showed that the management’s ability to commit using TQM while applying BIM obtained a relative importance of (0.717), while the relative importance for the management’s ability to commit using TQM without the application of BIM is (0.552). The results showed that construction projects in Saudi Arabia still sustain setbacks from applying TQM concepts and suffer from the lack of administrative, scientific and technical applications. In a second scenario, a hybridized support vector regression (SVR) Harris-hawks optimization (HHO) (i.e., SVR-HHO) were used to predict the TQM. The performance accuracy of the models was checked through three different evaluation metrics namely; mean square error (MSE), correlation co-efficient (CC) and Nash-Sutcliffe efficiency (NSE). the hybridized emerging SVR-HHO outperformed the other two data driven approaches in both the training and testing stages based on the employed evaluation metrics. Overall, the obtained results showed that both the machine learning and metaheuristic approaches were capable of predicting TQM.


2019 ◽  
Vol 8 (3) ◽  
pp. 2100-2107

Construction-related conflict is one of the issues that require considerable attention in the construction industry. Hence, this study intends to identify the factors causing conflict among the construction players in Sarawak, Malaysia. Simple random sampling was used to select the respondents for this research. Respondents for this research comprised contractors, consultants, and clients in organizations. Out of 196 distributed copies of the questionnaire, a total of 80 copies were completed and returned amounting to40.81% response rate. The Statistical Package for Social Science (SPSS) was used to obtain descriptive statistics. The Relative Importance Index (RII) was used to rank the factors causing conflict. A total of twenty-five (25) factors were identified. Insufficient funding was ranked the most severe among factors causing the client-related conflict. Changes in design was ranked first among factors causing the contractor-related conflict. Poor contract management was ranked first among the factors causing the consultant-related conflict. The findings in this research complement the existing body of knowledge on construction-related disputes. This research has provided a better understanding of the factors that could lead to conflicts among the construction players during the execution of construction projects.


Author(s):  
Muizz Sanni-Anibire ◽  
Abubakar Mahmoud ◽  
Majed Al-Ayouni

The construction industry is recognized as one of the most hazardous industries globally. Moreover, the rising trend of urbanization in many developing countries has ushered in a new era of high-rise construction, thus increasing the frequency of hazards related to working at height. Accident records in Saudi Arabia reveal that the construction industry accounted for 46.4% of industrial accidents, while fall-related injury accounted for 27% of the recorded injuries. Scaffolding is the most common access equipment used to work at height. Thus, the first stage in controlling the risks of falls from a height may be to identify the causes of scaffold accidents. This study presents 36 causes of scaffold accidents classified into five relevant groups, which have been identified through a thorough review of the extant literature. Additionally, the causes have been arranged in a survey designed based on a Likert scale of importance. Subsequently, 120 copies were administered to construction professionals in the Eastern Province of Saudi Arabia, with a 75% response rate. The Relative Importance Index (RII) was adopted to analyze the feedback. The results revealed that the top three causes of scaffold accidents include: “insufficient bracing/anchorage” (RII of 0.927), “scaffolding erected by incompetent professionals” (RII of 0.926), and “missing/faulty guardrails” (RII of 0.919). This study is of potential benefit to concerned stakeholders in the construction industry.


Author(s):  
Milind T. Phadtare

Delay in construction projects is a universal phenomenon. However, the topic is not adequately studied in the Indian context. This paper attempts to identify the causes of delays in construction of budget hotels in India and suggest remedies to avoid some delays. A business group constructing budget hotels across the country is approached for this study. Forty causes of delay have been identified and Relative Importance Index was calculated. The contribution of each category of causes of delay to overall delay in the projects was computed. Remedies such as, joint effort of the participants of the industry, training, coordination between project participants and project timing and scheduling are suggested and validated.


2020 ◽  
Vol 12 (1) ◽  
pp. 1666-1678
Author(s):  
Mohammed H. Aljahdali ◽  
Mohamed Elhag

AbstractRabigh is a thriving coastal city located at the eastern bank of the Red Sea, Saudi Arabia. The city has suffered from shoreline destruction because of the invasive tidal action powered principally by the wind speed and direction over shallow waters. This study was carried out to calibrate the water column depth in the vicinity of Rabigh. Optical and microwave remote sensing data from the European Space Agency were collected over 2 years (2017–2018) along with the analog daily monitoring of tidal data collected from the marine station of Rabigh. Depth invariant index (DII) was implemented utilizing the optical data, while the Wind Field Estimation algorithm was implemented utilizing the microwave data. The findings of the current research emphasis on the oscillation behavior of the depth invariant mean values and the mean astronomical tides resulted in R2 of 0.75 and 0.79, respectively. Robust linear regression was established between the astronomical tide and the mean values of the normalized DII (R2 = 0.81). The findings also indicated that January had the strongest wind speed solidly correlated with the depth invariant values (R2 = 0.92). Therefore, decision-makers can depend on remote sensing data as an efficient tool to monitor natural phenomena and also to regulate human activities in fragile ecosystems.


1968 ◽  
Vol 35 (1) ◽  
pp. 91-105 ◽  
Author(s):  
J. P. Walsh ◽  
J. A. F. Rook ◽  
F. H. Dodd

Summary(1) A tentative scheme is proposed for the quantitative estimation of the effects of various factors on one major milk constituent, lactose, from analyses of the milk of individual cows within herds. The potential lactose content in the milk of individual cows is predicted from the observed potassium-to-lactose ratio in the milk, and the difference between the predicted potential and the actual lactose content is partitioned into fractions that are attributed to effects due to age, inter-quarter difference and changes with stage of lactation. The scheme was applied to 2 commercial herds, one (herd A) producing milk of low and the other (herd B) milk of normal SNF content.(2) Lactation mean values for fat, SNF and lactose contents of the milk of individual cows showed a wide range of the same order in each of the 2 herds. Of the mean difference in SNF percentage of 0·30 between the herds, 0·14, or 47%, was due to a difference in lactose content.(3) The predicted potential milk lactose content of the cows in the 2 herds ranged from 5·04 to 5·66 (g/100 g milk water). Herd mean values were 5·394 for herd A and 5·244 for herd B.(4) Herd mean values for the effect on the lactose content (g/100 g milk water) of age, of changes with stage of lactation and of inter-quarter difference were −0·127, −0·080, and 0·073 respectively in herd A, and −0·197, −0·058 and −0·078, respectively, in herd B.(5) The relative importance of the various factors in accounting for differences between the herds in the lactose content of their bulk milk were: predicted potential lactose content 61%, effect of age 28%, effect of changes with stage of lactation 9% and effect of inter-quarter difference 2%.(6) The errors attached to the estimation of potential milk lactose content and the effects of age, of changes with stage of lactation and of inter-quarter difference are discussed.


Author(s):  
Obi Chukwuemeka Emmanuel ◽  
Ogunoh Peter Emenike ◽  
Ezeokoli Fidelis Okechukwu ◽  
Ohaedeghasi Christian Ifeanyi

Poor productivity of construction craftsmen is one of the causes of cost and time overruns in construction projects. Successful delivery of construction of projects within the measurable tenets is driven by effective site supervision. Nevertheless, the inability of many supervisors to organize, communicate with workers, and direct activities sufficiently is primarily connected to the quality of the construction. Hence, this study examined how enhanced supervision styles can lead to the improvement of craftsmen performance in Anambra State, Nigeria. Being a survey research, the study employed the use of review of related literature and structured questionnaire. Accordingly, a total one hundred (100) questionnaires administered and seventy-five (75) were retrieved. This corresponds to a response rate of 75%. Data garnered were analysed and presented using relative importance index, mean scores and frequency tables. The study found out that listening to subordinates or supervisees was the most important supervision styles for improved building craftsmen performance in the study area. Therefore, the study concluded by recommending team work and effective communication channels should be adopted for improving building craftsmen performance as regards project delivery.


Author(s):  
Raja Khan Mohammed Gopang ◽  
◽  
Qadir Buxalias Imran ◽  
Sasitharan Nagapan ◽  
◽  
...  

Railway construction industry has devoted vast amount of resources into advancing the management and technology of railway construction, yet most project in this industry often failed to comply with the set deadlines and budget limits. This study was conducted to recognize the critical factors that are causing delays in the construction of Riyadh Metro project, Saudi Arabia. From a thorough literature review, thirty-six (36) factors causing delays were identified which were then distributed to qualified industry experts in a survey questionnaire. A total of 105 respondents were gathered during the data collection. The datawas then evaluated statistically by utilizing different calculation tools that are frequency adjusted importance index for the delay factor ranking, and Spearman's correlation coefficient for the link between two different set of data. The result of this research identified the top five main delay factors to the railway construction projects which are “Client's decision-making process and changes in control procedures”, “Design Errors (including ambiguities and discrepancies of details/specifications)”, “Labor skills level”, “Design changes by Client or Consultant” and lastly, “Issues regarding permissions/ approvals from other stakeholders”.Finally, this study is hoped to help the railway construction industry in bettering itself by highlighting which issues should be focused on to counter the delays and reduce downtimes.


2020 ◽  
Vol 14 (1) ◽  
pp. 98-110
Author(s):  
Mohammed A. Al-Hammadi ◽  
Wei Tian

Background: The Building Information Modeling (BIM) revolution can provide a solution for problems in the Saudi Arabian construction industry and improve its outcomes. Though this technology is increasingly and rapidly adopted in advanced countries, developing countries such as Saudi Arabia and the Gulf Cooperation Council countries (GCC) are still in the early stages of BIM adoption. Objective: This study investigates the current state of BIM technology adoption by exploring and analyzing the critical challenges and barriers to BIM technology utilization in the construction sectors. Methods: The quantitative approach is adopted via a survey questionnaire distributed to participants in the field of construction projects in the Architecture, Engineering, and Construction (AEC) industry. A total of 228 questionnaires are collected and analyzed using the statistical packaging for social science software. Results: Findings show that several significant barriers negatively affect the utilization of BIM. The major barriers to BIM adoption are related to the lack of demand, lack of experts, and poor awareness of BIM benefits, which have relative importance indexes of (RII = 89.910), (RII = 88.475), and (RII = 87.130), respectively. Meanwhile, unspecified data responsibilities, difficulty of learning BIM, lack of data sharing, and sufficient current technology constitute the lowest-ranking barriers with their relative importance indexes of (RII = 71.704), (RII = 70.807), (RII = 66.413), and (RII = 65.874), respectively. Conclusion: The findings of this study are highly significant and can become more helpful and interesting if further research can measure the methodologies to implement BIM technology in the Kingdom of Saudi Arabia.


Sign in / Sign up

Export Citation Format

Share Document