Comparison of alternative approaches to modelling gas migration through a higher strength rock

2012 ◽  
Vol 76 (8) ◽  
pp. 3319-3326 ◽  
Author(s):  
A. R. Hoch ◽  
M. James

AbstractThe Radioactive Waste Management Directorate of the UK Nuclear Decommissioning Authority has prepared a generic disposal system safety case (DSSC) that covers a range of possible host rock environments. In many of the waste packages considered in the DSSC, the formation of gases by chemical and microbial processes is likely to occur. In order to demonstrate safety, it is necessary to understand the rates at which the gases are generated and their subsequent migration from a disposal facility after closure. This paper is concerned with modelling gas migration through a fractured higher strength host rock. A first set of simulations compares alternative approaches to modelling gas migration through a fractured rock. The approaches differ in their representation of the interaction between the fractures and the rock matrix. As expected, the gross features of many of the simulations are very similar, with a single continuum approach in which the porosity is set equal to either the fracture porosity or the matrix porosity providing the bounding cases. Gas migration is slower for those simulations where the gas can access more of the rock matrix. A final simulation, with a heterogeneous permeability field, is compared with the other simulations, again showing a very similar evolution.

2012 ◽  
Vol 76 (8) ◽  
pp. 3483-3489 ◽  
Author(s):  
D. A. Galson ◽  
L. E. F. Bailey

AbstractA three-year European Commission project entitled performance assessment methodologies in application to guide the development of the safety case (PAMINA) was conducted in the period 2006–2009 and brought together 27 organizations from ten European countries, including the Nuclear Decommissioning Authority and Galson Sciences Ltd from the UK. The PAMINA project had the aim of improving and developing a common understanding of performance assessment (PA) methodologies for disposal concepts for spent fuel and other long-lived radioactive wastes in a range of geological environments.Work undertaken within PAMINA focussed on four areas: (1) review of PA methodologies in participating organizations; (2) treatment of uncertainty in PA and the safety case; (3) other methodological advancements in PA; and (4) relevance of advanced PA approaches to practical cases.The state of development of a radioactive waste disposal programme has a strong influence on the type of safety case and supporting PA that is produced. A range of PA methodologies has been developed by different waste management organizations. This paper presents a selection of conclusions from the PAMINA project, in the context of general understanding developed on what would constitute an acceptable safety case for a geological disposal facility, and outlines areas for further development.


2012 ◽  
Vol 76 (8) ◽  
pp. 2881-2890 ◽  
Author(s):  
C. Padovani ◽  
S. J. Williams ◽  
P. Wood

AbstractIn the UK, radioactive wastes currently planned for disposal in a geological disposal facility (GDF) include intermediate level waste, some low level waste and high level waste. Disposal of other materials, including spent fuel, uranium and plutonium is also being evaluated to inform the safety case for a GDF, if such materials were to be classified as wastes in the future. This paper describes the generic safety functions through which waste packages can contribute to the safety case of a GDF in the UK. It describes the engineering approach used or envisaged, in the UK and internationally, to ensure that waste packages retain their safety functions for the required periods of time and summarizes the scientific basis underpinning the current understanding of relevant evolution processes. Where gaps in the knowledge exist, the Nuclear Decommissioning Authority Radioactive Waste Management Directorate has identified specific research activities needed to close out such gaps to a level of maturity sufficient for this stage of the disposal programme (generic). This paper describes the latest results from their R&D programme and presents a summary of the research activities planned to meet the current needs of the disposal programme with specific reference to the topics of package evolution and criticality safety.


2012 ◽  
Vol 76 (8) ◽  
pp. 2995-3001 ◽  
Author(s):  
T. M. Beattie ◽  
S. J. Williams

AbstractThe near field, together with the containment and isolation provided by the geosphere, contributes to the long-term safety provided by a geological disposal facility (GDF) after closure. The different engineered barriers can prevent or limit the release of radionuclides and their migration to the undisturbed host rock or geosphere and are expected to fulfil their post-closure safety functions for many thousands to hundreds of thousands of years. They will continue to contribute to containment after their eventual degradation when there would no longer be confidence that they would continue to fulfil all of their safety functions in their totality. By that time, significant radioactive decay will have occurred, substantially reducing the hazard associated with the wastes. Therefore, demonstration of long-term safety requires an understanding of the evolution of the engineered barriers and the consequences for the generic safety functions that the different barriers provide. This paper provides an overview of the research of the Nuclear Decommissioning Authority Radioactive Waste Management Directorate into the evolution of the near field of a GDF.


Energies ◽  
2021 ◽  
Vol 14 (7) ◽  
pp. 1998
Author(s):  
Haishan Luo ◽  
Kishore K. Mohanty

Unlocking oil from tight reservoirs remains a challenging task, as the existence of fractures and oil-wet rock surfaces tends to make the recovery uneconomic. Injecting a gas in the form of a foam is considered a feasible technique in such reservoirs for providing conformance control and reducing gas-oil interfacial tension (IFT) that allows the injected fluids to enter the rock matrix. This paper presents a modeling strategy that aims to understand the behavior of near-miscible foam injection and to find the optimal strategy to oil recovery depending on the reservoir pressure and gas availability. Corefloods with foam injection following gas injection into a fractured rock were simulated and history matched using a compositional commercial simulator. The simulation results agreed with the experimental data with respect to both oil recovery and pressure gradient during both injection schedules. Additional simulations were carried out by increasing the foam strength and changing the injected gas composition. It was found that increasing foam strength or the proportion of ethane could boost oil production rate significantly. When injected gas gets miscible or near miscible, the foam model would face serious challenges, as gas and oil phases could not be distinguished by the simulator, while they have essentially different effects on the presence and strength of foam in terms of modeling. We provide in-depth thoughts and discussions on potential ways to improve current foam models to account for miscible and near-miscible conditions.


2021 ◽  
pp. 9-19
Author(s):  
P. A. Boronin ◽  
N. V. Gilmanova ◽  
N. Yu. Moskalenko

The object of research in this article is the productive deposits of the pre-Jurassic complex. The pre-Jurassic complex is of great interest, this is an unconventional reservoir with a complex structure and developed fractured zones. High flow rates cannot be determined by the rock matrix, since the matrix permeability coefficient is on average 2−3 md. In this regard, there is the problem of separation of fractured intervals according to a standard set of well testing.


2018 ◽  
Vol 482 (1) ◽  
pp. 241-260 ◽  
Author(s):  
V. Tsitsopoulos ◽  
S. Baxter ◽  
D. Holton ◽  
J. Dodd ◽  
S. Williams ◽  
...  

AbstractThe Prototype Repository (PR) tunnel is located at the Äspö Hard Rock Laboratory near Oskarshamn in the southeast of Sweden. In the PR tunnel, six full-sized deposition holes (8.37 m deep and 1.75 m in diameter) have been constructed. Each deposition hole is designed to mimic the Swedish reference system for the disposal of nuclear fuel, KBS-3V. The PR experiment is designed to provide a full-scale simulation of the emplacement of heat-generating waste. There are three phases to the experiment: (1) the open tunnel phase following construction, where both the tunnel and deposition holes are open to atmospheric conditions; (2) the emplacement of canisters (containing heaters), backfill and seal in the first section of the tunnel; and (3) the emplacement of canisters, backfill and seal in the second section of the tunnel. This work describes the numerical modelling, performed as part of the engineered barrier systems (EBS) Task Force, to understand the thermo-hydraulic (TH) evolution of the PR experiment and to provide a better understanding of the interaction between the fractured rock and bentonite surrounding the canister at the scale of a single deposition tunnel. A coupled integrated TH model for predicting the wetting and the temperature of bentonite emplaced in fractured rock was developed, accounting for the heterogeneity of the fractured rock. In this model, geometrical uncertainties of fracture locations are modelled by using several stochastic realizations of the fracture network. The modelling methodology utilized information available at early stages of site characterization and included site statistics for fracture occurrence and properties, as well as proposed installation properties of the bentonite. The adopted approach provides an evaluation of the predictive capability of models, it gives an insight of the uncertainties to data and demonstrates that a simplified equivalent homogeneous description of the fractured host rock is insufficient to represent the bentonite resaturation.


Author(s):  
Jonathan D. Owens ◽  
Usman Talat

This is an empirical investigation considering how the Knowledge Transfer Openness Matrix (KTOM) could facilitate accessibility and Knowledge Transfer (KT) for the UK Higher Education (HE) Management Education Teaching when utilising learning technologies. Its focus is where learning technologies applications currently assist the KT process and support accessibility for the HE teacher and learner. It considers the philosophy of openness, focusing on its usefulness to support accessibility within UK HE Management Education Teaching. It discusses how the openness philosophy may assist the KT process for the HE teacher and learners using learning technologies. In particular, the potential to support accessibility within HE Management Education Teaching environments is appraised. There appear several implications for both teachers and learners. These are characterized in the proposed KTOM. The matrix organises KT events based on the principles of the openness philosophy. The role of learning technologies in events is illustrated with regard to teaching and learning accessibility.


2012 ◽  
Vol 76 (8) ◽  
pp. 2911-2918 ◽  
Author(s):  
G. Deissmann ◽  
S. Neumeier ◽  
G. Modolo ◽  
D. Bosbach

AbstractSeparated stocks of UK civil plutonium are currently held as a zero value asset in storage, as there is no final decision about whether they should be treated as a resource for future use as nuclear fuel or as waste. Irrespective of future UK government strategies regarding plutonium, at least a portion of the UK civil plutonium inventory will be designated for geological disposal. In this context, we performed a high-level review of the performance of potential wasteforms for the disposal of separated civil plutonium. The key issues considered were the durability and chemical reactivity of the wasteforms in aqueous environments and the long-term radionuclide release under conditions relevant to geological disposal. The major findings of the review, relevant not only to the situation in the UK but to plutonium disposal in general, are summarized in this paper. The review showed that, in the event of a decision being taken to declare plutonium as a waste for disposal, more systematic studies would be required to constrain the wasteform performance under repository conditions in order to derive realistic source terms for a safety case.


Author(s):  
Steve Thomas

- UK electricity consumers have paid provisions for decommissioning since before 1980 but by 2002, there were still negligible funds available to pay for decommissioning civil nuclear facilities. By then, the two major UK nuclear companies, British Energy and British Nuclear Fuels Limited (BNFL), were both effectively bankrupt. This paper examines: the pre-2002 provisions for decommissioning and how they were lost; the Nuclear Decommissioning Authority, a new public body which took over ownership of BNFL's facilities including the duty to manage their decommissioning and how it expects to carry out and fund decommissioning of its sites; how the re-launched British Energy will contribute to decommissioning its eight plants; and government plans for collecting decommissioning provisions for any new plants.JEL classifications: L50, L38, H23, H44, L71Key words: Nuclear power, decommissioning cost, funding and polluter pays.


Author(s):  
A. Stacey ◽  
J. V. Sharp

This paper presents a primary integrity management (PIM) framework for mobile installations (semi-submersibles and self elevating installations) and permanently moored floating installations (FPSOs, FSUs, etc.). The primary integrity of self-elevating and floating installations depends on both the primary structure and additional systems. The framework is based upon the UK regulatory requirements for offshore installations, including the need for a thorough review of the safety case accounting for any changes in condition and future plans and verification of the primary integrity management (PIM) process. Requirements and guidance are provided for all aspects of the integrity management process covering: • primary integrity hazard identification and risk control; • resources, organisation and management, including competency assurance; • information management and documentation; • primary integrity management policy, objectives and strategy; • inspection, examination and testing; • evaluation of structure and other primary systems; • maintenance, repair and upkeep; • audit, review and continual improvement. The framework also contains guidance based on the application of existing standards and industry published documents. Finally, guidance is given on the implementation of the framework.


Sign in / Sign up

Export Citation Format

Share Document