Current Practices in Log Yard Design and Operations in the Province of Quebec, Canada

2019 ◽  
Vol 69 (4) ◽  
pp. 248-259
Author(s):  
Marta Trzcianowska ◽  
Daniel Beaudoin ◽  
Luc LeBel

Abstract Log yards play an important role in the forest supply chain by connecting raw material supply to manufacturing processes. Log yard design and operations have not been thoroughly represented in the scientific literature, though research in other industrial sectors has demonstrated the strategic operational importance of warehouses. This article investigates the log yard design and operations in current industrial practices. An analysis of existing log yards was conducted in Quebec. Detailed information about throughput, equipment, personnel, inventory management, and design considerations was gathered by means of questionnaires, on-site visits, and meetings with yard managers. The survey of current practices (design, management, and operations) confirms that most existing yards have been designed without a systematic method. Crucial performance inhibitors included log yard shape, in-flow management, and poor surface material. Results point toward a potential gain in competitiveness by improving log yard practices, optimizing log yard shape and layout, better coordinating the forest–mill operations, and enhancing surface material.


2015 ◽  
Vol 2 (1) ◽  
pp. 6-12
Author(s):  
Agus Sugiarta ◽  
Houtman P. Siregar ◽  
Dedy Loebis

Automation of process control in chemical plant is an inspiring application field of mechatronicengineering. In order to understand the complexity of the automation and its application requireknowledges of chemical engineering, mechatronic and other numerous interconnected studies.The background of this paper is an inherent problem of overheating due to lack of level controlsystem. The objective of this research is to control the dynamic process of desired level more tightlywhich is able to stabilize raw material supply into the chemical plant system.The chemical plant is operated within a wide range of feed compositions and flow rates whichmake the process control become difficult. This research uses modelling for efficiency reason andanalyzes the model by PID control algorithm along with its simulations by using Matlab.





2017 ◽  
Vol 907 ◽  
pp. 104-118
Author(s):  
Maria Stoicănescu ◽  
Eliza Buzamet ◽  
Dragos Vladimir Budei ◽  
Valentin Craciun ◽  
Roxana Budei ◽  
...  

Dental implants are becoming increasingly used in current dental practice. This increased demand has motivated manufacturers to develop varieties of product through design, but also looking for new materials used to improve surface characteristics in order to obtain a better osseointegration. But the increase in the use of implants goes to a consequent increase in the number of failures. These failures are caused either by treatment complications (peri-implantitis), by fatigue breakage under mechanical over-stress, by defective raw material, or due to errors during the insertion procedures. Although they are rare, these complications are serious in dentistry. Before to market a dental implant to clinical practitioners, the product is validated among other determinations in number of biocompatibility research. Raw material issues, details about its structure and properties are less published by the scientific literature, but all this are subject of a carefully analysis of the producers. Breaking of dental implants during surgical procedures, during the prosthetic procedures or during use (chewing, bruxism, accidents, etc.), is the second most common cause of loss of an implant after consecutive peri-implantitis rejection. Although the frequency of this type of failure for a dental implant is much smaller than those caused by the peri-implantitis, a detailed study of broken implants can explain possible causes. The use of scanning electron microscopy (SEM) in the study of the cleave areas explain the production mechanism of cleavages, starting from micro-fissures in the alloy used for the production of dental implants. These micro-fissures in weak areas of the implant (anti-rotational corners of the polygons, etc.) could generate a serious risk of cleavage first time when a higher force is applied.



2018 ◽  
Vol 23 (6) ◽  
pp. 325-335 ◽  
Author(s):  
Seiji Iwanaga ◽  
Nobuyuki Tsuzuki ◽  
Hirofumi Kuboyama


2020 ◽  
Vol 20 (2) ◽  
Author(s):  
Ardhitya Alam Wiguna ◽  
Linda Ekadewi Widyatami

Doho Suwar-Suwir is a Micro Small Medium Enterprises (UMKM) processing Fermented Cassava (Tape Singkong) to become a processed food in Jember, which is Suwar-Suwir. To maintain the stability of production process, needs a control for the stock management towards the raw material at Doho Suwar-Suwir UMKM. The raw material inventory management at Doho Suwar-Suwir UMKM is about fermented cassava raw material inventory which then are processed to become the typical food of Jember Regency, which is Suwar-Suwir. The goal of this research were to analyze the fermented cassava raw material inventory quantity and to analyze the safety stock quantity at Doho Suwar-Suwir UMKM. The method used in this research was stock management calculation or Economical Order Quantity (EOQ) where the result of this research was the quantity of fermented cassava raw material  needed using Economical Order Quantity (EOQ) method at Doho Suwar-Suwir business was 60,6 kg and the number of the safety stock which must exist was 5,5 kg.



Author(s):  
А.А. Agatayeva ◽  
◽  
U.Zh. Jussipbekov ◽  
R.М. Chernyakova ◽  
R.А. Kaiynbayeva ◽  
...  

The processing of phosphorites into elemental phosphorus is accom-panied by the formation of waste - cotrile "milk", in which indium, gallium, and silver are present. This waste can be considered as a cheap raw material for the production of rare and precious metals. In the scientific literature there are data on the sorption capacity of hexacyano-ferrates of iron, which has a crystal lattice with a channel diameter from 3.0 to 3.5Å. Investigation of the sorption process in the model system "Fe4[Fe(CN)6]3·10H2O - Ag+- In3+- Ga3+ - H2O" depending on the norm of iron hexacyanoferrate (sorbent). The initial concentration of silver, indium and gallium ions and their residual content in solutions were determined using the atomic absorption spectrophotometer "PerkinElmer Analyst 400" (USA). The microstructure of the initial iron hexacyanoferrate and iron hexacyano-ferrate, after sorption, was studied on the CarlZeissFESEM and JEOL brand "JXA-8230" (Japan). With a ratio to T:W equal to 1.75-2.5:100, the degree of sorption of Ag+ with iron hexacyanoferrate is 99.5 and 99.8 %. The highest degree of sorption (96.75%) of In3+ ions can be obtained with a sorbent weighing 3 g per 100 g of solution at 60oC. A high degree of sorption of Ga3+ cations is achieved at low (0.5:100 wt. h.) and high (3:100 wt. h.) consumption of iron hexacyanoferrate. It was revealed that iron hexacyanoferrate exhibits sorption properties simultaneously with respect to mono- and trivalent metals, and the basic laws of their sorption were established.



2018 ◽  
Vol 5 (2) ◽  
pp. 138-147
Author(s):  
Eka Nur Afifah ◽  
Alamsyah Alamsyah ◽  
Endang Sugiharti

Scheduling is one of the important part in production planning process. One of the factor that influence the smooth production process is raw material supply. Sugarcane supply as the main raw material in the making of sugar is the most important componen. The algorithm that used in this study was Simulated Annealing (SA) algorithm. SA apability to accept the bad or no better solution within certain time distinguist it from another local search algorithm. Aim of this study was to implement the SA algorithm in scheduling the sugarcane harvest process so that the amount of sugarcane harvest not so differ from mill capacity of the factory. Data used in this study were 60 data from sugarcane farms that ready to cut and mill capacity 1660 tons. Sugarcane harvest process in 19 days producing 33043,76 tons used SA algorithm and 27089,47 tons from factory actual result. Based on few experiments, obtained sugarcane harvest average by SA algorithm was 1651,63 tons per day and factory actual result was 1354,47 tons. Result of harvest scheduling used SA algorithm showed not so differ average from mill capacity of factory. Truck uses scheduling by SA algorithm showed average 119 trucks per day while from factory actual result was 156 trucks. With the same harvest time, SA algorithm result was greater  and the amount of used truck less than actual result of factory. Thus, can be concluded SA algorithm can make the scheduling of sugarcane harvest become more optimall compared to other methods applied by the factory nowdays.



JUMINTEN ◽  
2020 ◽  
Vol 1 (4) ◽  
pp. 163-172
Author(s):  
Vify Elviana ◽  
Akmal Suryadi

Persediaan merupakan aset perusahaan yang memiliki peran penting dalam operasi bisnis, sehingga perusahaan penting untuk melakukan manajemen persediaan yang baik, artinya perusahaan harus mampu mengantisipasi kendala maupun tantangan yang ada dalam pengelolahan persediaan untuk meminimalisasi total biaya yang harus dikeluarkan oleh perusahaan. Permasalahan yang timbul pada persediaan bahan baku di PT XYZ adalah perusahaan melakukan perencanaan dan pengendalian bahan baku hanya berdasarkan pada pengalaman-pengalaman sebelumnya dan tidak berdasarkan pada metode yang sudah baku. Oleh karena itu pembelian bahan baku tidak sesuai dengan permintaan konsumen. Hal tersebut sering menyebabkan terjadinya kelebihan maupun kekurangan stok bahan baku. Kesalahan dalam penentuan besarnya investasi dalam persediaan akan mengurangi keuntungan perusahaan. Adanya persediaan bahan baku yang terlalu besar, akan menambah beban biaya pemeliharaan dan penyimpanan dalam gudang, serta kemungkinan terjadinya penurunan kualitas bahan baku yang dapat menyebabkan berkurangnya keuntungan perusahaan. Namun jika persediaan bahan baku terlalu sedikit maka akan berakibat pada terhambatnya proses produksi, sehingga tidak terpenuhinya permintaan konsumen. Hasil penelitian ini dapat menyimpulkan bahwa perencanaan kebutuhan bahan baku dengan metode perusahaan didapatkan total cost sebesar Rp 1.796.762.429,-, sedangkan metode Material Requirements Planning (MRP) didapatkan total cost sebesar Rp 1.576.011.801,-. Maka dapat disimpulkan telah terjadi penurunan total cost seluruh bahan baku sebesar 12,28%. Hal ini membuktikan bahwa metode Material Requirements Planning (MRP) lebih efisien daripada metode PT. XYZ. Oleh karena itu untuk mendapatkan total cost yang minimum, metode Material Requirements Planning (MRP) diterapkan pada periode Februari-Juni 2020 sehingga didapatkan total cost sebesar Rp 1.576.011.801,-. Kata Kunci:         Material Requirements Planning (MRP), PT XYZ, Pail Cat, Economic Order Quantity (EOQ), Period Order Quantity (POQ), Lot For Lot (LFL). ABSTRACT                     Inventory is a company asset that has an important role in business operations, so the company is important to conduct good inventory management, meaning that the company must be able to anticipate obstacles and challenges that exist in managing inventory to minimize the total cost to be incurred by the company.The problem that arises in the supply of raw materials in PT XYZ is that the company plans and controls raw materials based only on previous experiences and not based on established methods. Therefore, the purchase of raw materials is not in accordance with consumer demand. This often leads to excess or shortage of raw material stock. Mistakes in determining the amount of investment in inventories will reduce company profits. The availability of raw materials that are too large, will add to the burden of maintenance and storage costs in the warehouse, as well as the possibility of a decline in the quality of raw materials that can lead to reduced company profits. However, if the supply of raw materials is too little, it will result in obstruction of the production process, so that consumer demand is not fulfilled. The results of this study can conclude that the planning of raw material needs by the company method obtained a total cost of Rp 1,796,762,429, - while the Material Requirements Planning (MRP) method obtained a total cost of Rp 1,576,011,801, -. Then it can be concluded that there has been a decrease in the total cost of all raw materials by 12.28%. This proves that the Material Requirements Planning (MRP) method is more efficient than the PT. XYZ. Therefore, to get the minimum total cost, the Material Requirements Planning (MRP) method was applied in the February-June 2020 period so that a total cost of Rp 1,576,011,801 was obtained.   KeyWords: Material Requirements Planning (MRP), PT XYZ, Pail Cat, Economic Order Quantity (EOQ), Period Order Quantity (POQ), Lot for Lot (LFL).



Sign in / Sign up

Export Citation Format

Share Document