scholarly journals Modeling of Waste Material Costs on Road Construction Projects

2018 ◽  
Vol 7 (2.14) ◽  
pp. 474 ◽  
Author(s):  
Mega Waty ◽  
Sofia W. Alisjahbana ◽  
Onnyxiforus Gondokusumo ◽  
Hendrik Sulistio ◽  
Cholil Hasyim ◽  
...  

Material waste is a term from the amount of waste material percentage and is one of the serious problems in the implementation of road construction project. The research objective is to calculate the average percentage of waste material in road construction projects and obtain waste material influencing profit and make a regression model of % material waste to % profit contractors. The data obtained are 158 projects in East and North Kalimantan divided into 51 road building projects and 107 road improvement projects. The percentage of waste material on road building project is B aggregate as the largest (26%) and ready mix concrete (5.3%) as the smallest. The percentage of waste material on road improvement project is B aggregate as the largest (24.2%) and ready mix concrete (6.14%) as the smallest. The influencing waste material on the road construction project is B aggregate, lean concrete and ready mix concrete with regression equation to determine the estimated % profit contractor as a function of % material waste is Y = 7.363 -0.032 X3 - 0.078 X4 - 0.066 X6. The influenced waste material on road improvement projects are cement, B aggregate, and Land Fill  with the regression equation to determine the estimated % profit of contractor as a function of % material waste is Y = 8,702- 0,037 X4-  0,054 X5- 0,044 X7.  

2020 ◽  
Vol 26 (1) ◽  
pp. 104-117
Author(s):  
Mega Waty ◽  
Hendrik Sulistio

Early risk identification of the sources and causes of waste material for road construction projects has been carried out, and the research continues to carry out further risk identification which then becomes the final risk identification. Description and validity tests and reliability tests were carried out to obtain further risk identification. Each source variable and indicator of the cause of material waste in each material is differentfrom one another because each has a difference. The results of continued identification resulted in:   1) ready mix concrete has eight variables of waste material sources and 21 indicators of material waste causes, 2) lean concrete has seven variables of waste material sources and 18 indicators of material waste causes, 3) aggregate B has seven variables of waste material sources and 12 indicators of material waste causes,  4) landfill has eight variables of material waste sources and 26 indicators of material waste causes, 5) cement has seven variables of material waste sources and 31 indicators of material waste.


2019 ◽  
Vol 9 (1) ◽  
pp. 14-17 ◽  
Author(s):  
Magdalena Kowacka ◽  
Dariusz Skorupka ◽  
Artur Duchaczek ◽  
Paweł Zagrodnik

AbstractThe work contains information on the implementation of surveying works in the road construction process. The aim of the research was to identify geodetic risk factors occurring at the stage of preparation of a construction project, the presence of which can greatly disrupt the undertaking such as the road construction. The research was carried out on the basis of expert knowledge, documentation obtained from various road construction projects and the analysis of disturbances at the initial stage of works.


2017 ◽  
Vol 15 (03) ◽  
pp. 395-416 ◽  
Author(s):  
Ehsan Mousakhani ◽  
Mohammadreza Yavarkhani ◽  
Soheyla Sohrabi

Purpose Road construction projects are one of the strategic industries in each country and their construction and development requires spending huge funds. Regarding the increased demand and resource constraints; a technique which reduces costs by maintaining and improving the functioning is of great importance for the authorities of each country. Value engineering is a comprehensive and coherent means based on innovation and team work which, in addition to maintaining the quality and improving the project function, reduces its cost and is not limited to the design and construction phase; however, it includes exploitation and maintenance as well. This study aims to present a practical model for the implementation and application of value engineering process in a construction project located in a special region (in terms of tourism, positioning in an economic growth path, and the East-West strategic axis of the region). In this regard, after reviewing the advisor's design, considering the interests of the project stakeholders, reviewing design criteria and assessment methods and with the use of value engineering techniques, a new option was presented which led to a significant reduction in costs and time and an increase of quality, safety, and environmental factors. Finally, including initial costs, repair, maintenance, income and expenses, the relative value index of this option, compared to the advisor's option, increased from 0.9 to 3.5. Based on the increased need for development of roads in the country, exploiting this model in similar projects can significantly improve the project value and the effectiveness of investments. Design/methodology/approach This research project was selected with regard to the extremely high credit of the project and its potential in terms of Value Engineering implementation. In this study, technical and financial information were first collected after forming a value engineering team including a value engineering expert who was responsible for coordinating the work, some representatives of the employer, designer, executor, and budget estimator. In functional analysis phase with the use of FAST graph, advantageous, costly, and risky functions were identified. In the creativity phase, ideas related to selected functions were created and investigated and developed in the evaluation phase. Finally, calculating the value index, two variants with higher value index than the baseline plan, were proposed and implemented. Findings Since the determining criteria of designing and implementation of road construction projects including increased safety, reduced travel time, user satisfaction, ease of implementation, cost of construction and maintenance and so on are almost similar in most projects, using this study results and implementing its practical framework in other construction projects can be beneficial. These parameters lead to an increase in quality, value, and safety of the project. With regard to done steps and resulted incomes, this essay can be known as a practical and theoretical model to promote the value of crucial projects especially in developing countries. Research limitations/implications Sanandaj-Hamedan road with the length 176km connects central provinces of Iran. This study is regarding the first part of this route. Based on the specific topography of the region and the existing road limitations, selecting a good variance with all the features of an ideal road from geometric, economic, and safety aspects is a difficult task. Originality/value Employers and project sponsors are always looking for products with greater value and lower cost; therefore, present a practical model for the implementation and application of value engineering process in a construction project and providing a similar work experience can encourage the use of value engineering techniques and significantly improve the project value and the effectiveness of investments.


2020 ◽  
Vol 11 (4) ◽  
pp. 1184
Author(s):  
Ashem Emmanuel Egila ◽  
Oluwaseun Abdulakeem Balogun ◽  
Saheed Olanrewaji Yusuf

Poor road infrastructure in Nigeria is a significant challenge, just like poverty, insecurity, and unemployment. The construction of road in the country is characterized by numerous challenges throughout the project life cycle. Some of these challenges are project delay and cost overrun, corruption and fraud, faulty contractual process among others. Objectives of this study are to identify factors influencing delays and cost overruns in road construction project, to rank these factors base on their impacts and importance, and to suggest conservative ways to address the future challenges that can result from delays and cost overruns of future road construction projects. The research instruments include in-depth literature review, fieldwork, questionnaire administration, and interview. Inferential statistics such as Relative importance index (RII) and Mean Value techniques were used to analyze collected data. The result of the study identified factors influencing delays and cost overruns in road construction projects as; man related, money-related, machine-related, material related, environmental-related, and method related factors. Analysis using RII and MV ranked man and money related as the highest factors for delay and cost overrun respectively. Hence, the research recommends that the Government should create an enabling environment, making suitable policy for the construction company to operate.


Author(s):  
Mega Waty ◽  
Hendrik Sulistio

A Change Order is a written and legal work order that changes the scope of the original contract, with compensation that has been agreed upon by the owner and the contractor. Changes can be in the form of adding or reducing the scope of work, changing materials, or changing schedules. Change Order causes the cost of contract items to swell, planning errors and negligence as well as changes in scope that can be reduced by sharpening planning results. The scope of research on road construction in Indonesia, especially in DKI Jakarta and Banten provinces. This study aims to determine the identification of change orders in road construction projects. Data obtained from real data on road construction projects from 2013-2018 on 16 road construction project packages in the form of road construction project addendum contracts. Based on the addendum contract, added work, less work, addition of new items and removal of work items are determined. The identification of change order risk is seen from three aspects, namely the addition and reduction of work items, the removal of items and the addition of new items and the wishes of the owner, thereby increasing the cost of the change order contract. This study found 732 changes in construction work items. Risk identification is obtained from the frequency of changes above 35% which is an intermediate frequency that tends to increase the occurrence of change orders. The results of risk identification were obtained for 31 construction work items, the highest percentage was for Thermoplastic Road Marking work, followed by 30 other construction work items. Keywords: risk identification; change orders; road construction projects  AbstrakChange Order adalah perintah kerja tertulis dan sah  yang mengubah lingkup kontrak semula, dengan kompensasi  yang sudah disetujui oleh pemilik dan  kontraktor.  Perubahan dapat berupa penambahan atau pengurangan lingkup pekerjaan, perubahan material, atau perubahan jadwal. Change Order menyebabkan biaya  item kontrak membengkak, kesalahan perencanaan dan kelalaian serta perubahan ruang lingkup yang dapat dikurangi dengan mempertajam hasil perencanaan.. Lingkup penelitian pada konstruksi jalan di Indonesia khususnya  provinsi DKI Jakarta dan Banten. Penelitian  bertujuan untuk  mengetahui  identifikasi change order proyek konstruksi jalan. Data didapat dari data riil proyek konstruksi jalan dari tahun 2013- 2018 pada 16 paket proyek konstruksi jalan berupa kontrak addendum proyek konstruksi jalan. Berdasarkan kontrak addendum maka ditentukan pekerjaan tambah, pekerjaan kurang, penambahan item baru dan penghilangan item pekerjaan. Identifikasi risiko change order dilihat dari tiga aspek yakni penambahan dan pengurangan item pekerjaan, penghilangan item dan penambahan item baru dan keinginan dari pihak owner sehingga meningkatkan biaya kontrak change order.  Penelitian ini mendapatkan 732 perubahan  item pekerjaan konstruksi.  Identifikasi risiko didapat dari  frekuensi perubahan diatas 35% yang merupakan frekuensi menengah yang cenderung meningkatkan terjadinya change order. Hasil identifikasi risiko didapat pada  31 item pekerjaan konstruksi, yang tertinggi persentase pada pekerjaan  Marka Jalan Termoplastik, diikuti 30 item pekerjaan konstruksi lainnya.


2018 ◽  
Vol 1 (2) ◽  
Author(s):  
Abadi Palusia

Currently, many road projects are performing poorly for timely completion, an analysis of time road project implementation needs to be done on the contractor company, so that it can be known that the shortcomings and weaknesses done so far, which later can be an input for contractor, to be even better in the implementation of time management of a road construction project. In 2017 many packages of road construction works in Sawahlunto City. The purpose of this study is to determine the factors that affect the implementation of time management of road construction projects in Sawahlunto. The research method used is quantitative research method by spreading questionnaires to the respondents involved in road construction project in Sawahlunto City. Kata Kunci : Time Management, road, late


Author(s):  
Nokulunga Xolile Mashwama ◽  
Winnie Mushatu ◽  
Didibhuku Thwala ◽  
Clinton Aigbavboa

There are numerous participants involved in construction projects including the client or sponsor of the project, regulatory bodies, contractors, consultants, ward councilors, community who affect or become affected by the project. Stakeholders can affect the road construction positive or negatively. Stakeholder’s engagement is done to avoid unnecessary conflicts and controversies and to attain the desired successful implementation of the project. The paper aims to identify the impact of internal stakeholders on road construction project. Quantitative approach was adopted for this study. 100 questionnaires were distributed and 76 were collected and analyzed. The data was collected through primary and secondary sources. Factor analysis was conducted, Correlation matric coefficients has been conducted to ensure visibility of coefficients greater than 0.3 and Kaiser-Meyer-Olkim (KMO) and Barlett’s test were conducted. From the findings it transpired that late payment to service providers; failure to verify contractor qualification; Client knowledge to review design documentation; inadequate involvement during construction project, lack of understanding project feasibility. The participation of stakeholders encourages the public to share their knowledge with the regulatory authorities, fosters better-informed decisions and decreases likelihood of project failure. Early stakeholder’s involvement can add benefits of diffusing opposition to a project.


2019 ◽  
Vol 8 (3) ◽  
pp. 1962-1971

Construction time overrun is considered one of the most appearing problems in construction industry. In Road construction, Equipment plays a major role, Hence there is a need for control of delay in road construction projects. This paper aims to identify the equipment delay causes in road construction projects and ranks the critical factors. The equipment delay causes were identified through pilot study and literature papers. The pilot study was done by interviewing 20 experts and the questionnaire were designed. Totally 19 causes were identified and categorized into four main groups namely 1.Maintenance related causes, 2.Equipment related causes, 3.Financial related causes and 4.Personnel related causes. The questionnaire survey received 180 responses on the opinion of Contractor, Equipment dealer, Equipment operator, Site engineer, Project manager and others. The results were analysed using Relative Important Index (RII), Ranking the equipment delay causes identifies the most risky equipment delay factors in road construction project. The most five risky factors are Lack of spare parts, Over usage of equipment leads to crashing, Inadequate equipment, Non allocation of fuel purchase staff and Inexpert or unpractised equipment operator


2021 ◽  
Vol 10 (3) ◽  
Author(s):  
Osama Salim Al Adawi ◽  
Hussin Yahia

Cost overrun is a common phenomenon in construction projects of any country, be it in developing or developed countries. This issue is a critical issue that impacts a project's success. It, therefore, needs serious attention from all the participants in the construction project to keep the projects in safe mode, to be completed within its limited cost, time, and performance. Cost overrun has a negative impact on construction project performance, which is because the construction industry is vast and complex. Any difficulty occurring during the project's life cycle leads to other problems in various parts of the project. Studies by many researchers’ cost overruns by literature review, and according to their studies suggested the most cost overrun causes. The aim of this study is to identify the most critical factors leading to cost overruns on road projects in Oman, and then provide suggestions to resolve them.