A GRAPHICAL USER INTERFACE (GUI) FOR FORENSIC ANALYSIS OF DELAY AND DISRUPTION

Author(s):  
Ageliki Valavanoglou ◽  
Danijel Rebolj ◽  
Detlef Heck

Disrupting events are common in construction and can have a significant impact on the successful completion of a project. Disputes concerning disruptive events often arise because no party wants to accept responsibility for the extra cost incurred. The resolution of this kind of disputes lies within the clear demonstration of causation, liability and the quantification of the disrupting event. Purpose of this research is to explore the potential of Building Information Modeling (BIM) in assisting forensic delay and disruption analysis supported by a Graphical User Interface (GUI). An extensive literature review highlighted the shortcomings of current practices and identified the reconstruction of events through incomplete and unstructured documentation as one of the primary challenges faced by the analysis expert. The findings of the literature review formed the basis for the development of a GUI designed to incorporate all the necessary information for the identification of the causal link of events, the liability and the calculation of damages. The usability of the GUI prototype was tested on a case study, indicating an increase in the overall efficiency and reduction of time spent by the forensic analyst in the retrieval of relevant information.

2018 ◽  
Vol 24 (8) ◽  
pp. 581-591 ◽  
Author(s):  
Daniel Luiz de Mattos Nascimento ◽  
Osvaldo Luiz Gonçalves Quelhas ◽  
Marcelo Jasmim Meiriño ◽  
Rodrigo Goyannes Gusmão Caiado ◽  
Simone D. J. Barbosa ◽  
...  

This paper applies a methodology for interdisciplinary Facilities Management (FM) by alingment between Building Information Modeling (BIM) and Lean. Initially, the literature review of BIM, FM and Lean principles. Afterwards, the research applies the Digital Obeya Room for improved FM and describes its application on a real-world case study. Lastly, the work presents a survey with specialists to assess the relevance of each BIM-Lean concepts and correlate their perceptions with the empirical results. The main collaborations of this work are: a conceptual framework that relates the PDCA (Plan-Do-Check-Act) cycle with BIM-Lean approaches; the identification of the most relevant BIM functionalies and Lean principles; and the real-world application of the framework procedures on FM.


Energies ◽  
2021 ◽  
Vol 14 (14) ◽  
pp. 4100
Author(s):  
Mariana Huskinson ◽  
Antonio Galiano-Garrigós ◽  
Ángel Benigno González-Avilés ◽  
M. Isabel Pérez-Millán

Improving the energy performance of existing buildings is one of the main strategies defined by the European Union to reduce global energy costs. Amongst the actions to be carried out in buildings to achieve this objective is working with passive measures adapted to each type of climate. To assist designers in the process of finding appropriate solutions for each building and location, different tools have been developed and since the implementation of building information modeling (BIM), it has been possible to perform an analysis of a building’s life cycle from an energy perspective and other types of analysis such as a comfort analysis. In the case of Spain, the first BIM environment tool has been implemented that deals with the global analysis of a building’s behavior and serves as an alternative to previous methods characterized by their lack of both flexibility and information offered to designers. This paper evaluates and compares the official Spanish energy performance evaluation tool (Cypetherm) released in 2018 using a case study involving the installation of sunlight control devices as part of a building refurbishment. It is intended to determine how databases and simplifications affect the designer’s decision-making. Additionally, the yielded energy results are complemented by a comfort analysis to explore the impact of these improvements from a users’ wellbeing viewpoint. At the end of the process the yielded results still confirm that the simulation remains far from reality and that simulation tools can indeed influence the decision-making process.


2021 ◽  
Vol 13 (14) ◽  
pp. 7990
Author(s):  
Suman Paneru ◽  
Forough Foroutan Jahromi ◽  
Mohsen Hatami ◽  
Wilfred Roudebush ◽  
Idris Jeelani

Traditional energy analysis in Building Information Modeling (BIM) only accounts for the energy requirements of building operations during a portion of the occupancy phase of the building’s life cycle and as such is unable to quantify the true impact of buildings on the environment. Specifically, the typical energy analysis in BIM does not account for the energy associated with resource formation, recycling, and demolition. Therefore, a comprehensive method is required to analyze the true environmental impact of buildings. Emergy analysis can offer a holistic approach to account for the environmental cost of activities involved in building construction and operation in all its life cycle phases from resource formation to demolition. As such, the integration of emergy analysis with BIM can result in the development of a holistic sustainability performance tool. Therefore, this study aimed at developing a comprehensive framework for the integration of emergy analysis with existing Building Information Modeling tools. The proposed framework was validated using a case study involving a test building element of 8’ × 8’ composite wall. The case study demonstrated the successful integration of emergy analysis with Revit®2021 using the inbuilt features of Revit and external tools such as MS Excel. The framework developed in this study will help in accurately determining the environmental cost of the buildings, which will help in selecting environment-friendly building materials and systems. In addition, the integration of emergy into BIM will allow a comparison of various built environment alternatives enabling designers to make sustainable decisions during the design phase.


Buildings ◽  
2021 ◽  
Vol 11 (8) ◽  
pp. 323
Author(s):  
Vachara Peansupap ◽  
Pisal Nov ◽  
Tanit Tongthong

The kingpost was a vertical element that was used to support the structural strut in the deep excavation. The structural kingpost was commonly arranged by experienced engineers who used two-dimensional construction drawings. Thus, it was still time-consuming and error-prone. Currently, an available construction program has been developed to arrange the structural kingpost by identifying the clash problems in the 3D environment. However, they have a limitation for detecting the clash that was unable to visualize the concurrent clashes between kingpost and many underground structures. Then, the engineer cannot see all the clash incidents with each kingpost and move the kingpost to avoid the clashes successfully. Since the kingpost arrangement was still an inefficient practice that was limited in the visualization aspect, this research used engineering knowledge and advanced construction technology to detect and solve the clashes between kingposts and underground structures. The methodology used engineering knowledge of kingpost arrangement to develop the system modules by using a rule-based approach. Then, these modules were developed into the system by using visual programming of Building Information Modelling (BIM). To test the system, an underground structure from building construction was selected as a case study to apply the developed system. Finally, the finding of this study could overcome human judgment by providing less interaction in the kingpost arrangement and visualization improvement of clash occurrences in the 3D model.


2021 ◽  
Vol 13 (17) ◽  
pp. 9591
Author(s):  
Sepehr Abrishami ◽  
Rocío Martín-Durán

The main goal of this study is to explore the adoption of a design for manufacturing and assembly (DfMA) and building information management (BIM) approach during the whole lifecycle of assets. This approach aims to tackle issues inherent in the design of traditional construction methods, such as low productivity and quality, poor predictability and building performance, and energy use, through the implementation of a BIM library of off-site components. In recent years, a renewed interest has been directed to the attempt to provide solutions to these urgent problems through the adoption of new advancements in technologies. However, while there are studies focussing on a BIM-DfMA approach, there is a lack of research regarding how this approach should be adopted during the whole lifecycle of the assets. Furthermore, to the best of our knowledge, defining an efficient way of developing a component-based BIM object library has not yet been included in any of the available studies. A mixed methodology approach has been used in this research. A conceptual framework was developed as the result of an extensive literature review to investigate new advancements in the AEC sector. Following the literature review, the framework was tested and validated through a case study based on the production and adoption of a BIM library of off-site components at the design stage of an asset. The architecture, engineering, and construction (AEC) industry has recognised the necessity of a new approach that helps to resolve the well-known issues presented in traditional methods of construction. The conceptual framework and case study proposed presents a valuable new method of construction that support the implementation of a BIM and DfMA approach, highlighting their benefits. This framework has been created using many valuable and reliable sources of information. The result of this research supports the idea of a novel new construction method that focuses on a manufacturing-digital-driven industry, with the use of DfMA in a BIM-integrated approach. This novel method will add significance and be beneficial for a wide range of aspects in the construction sector, contributing to the theoretical and practical domain.


Author(s):  
Kieu-Trang Pham ◽  
Duc-Nghia Vu ◽  
Phuc Le Hieu Hong ◽  
Chansik Park

Temporary safety facilities (TSFs) are an essential support system providing necessary protection to workers during construction activities, which are targeted towards preventing the occurrence of incidents and accidents at the construction site; however, the schedule and location of installation and demolition of TSFs continue to rely on labor experience, and are often omitted from formal drawings or documents. This results in thousands of accidents in the construction industry, especially in construction small and medium-sized enterprises (SMEs) because of their several limiting factors; therefore, this study proposes automatic workspace planning for TSFs based on construction activities, which is a systematized approach for construction SMEs to practice occupational health and safety (OHS). By using building information modeling (BIM) and add-in algorithm, safety facilities can be simulated and visualized to integrate into the designated workspace. The developed system was implemented utilizing 4D-BIM for TSFs installation and validated with a case study on a residential building project. The result revealed that the visualized TSF produces a better understanding of safety measures with regard to project schedule. Additionally, TSFs workspace planning provides an affordable approach that motivates safety practices among the SMEs; consequently, the effectiveness of construction safety measures and their management is enhanced appreciably.


2020 ◽  
Vol 14 (4) ◽  
pp. 507-513
Author(s):  
Carles Serrat ◽  
Sebastian Banaszek ◽  
Anna Cellmer ◽  
Vicenç Gilbert ◽  
Anna Banaszek

The aim of the paper is to explain the basic principles of carrying out an inventory and follow-up of buildings and their condition assessment, by using the Full Interactive Visualization Method for Building Condition Assessment platform. It is a platform enabling the implementation of construction inventory based on the remote cooperation of many specialists in the field of, among others: building construction, architecture, civil engineering, photogrammetry, CAD, UAV. This type of cooperation is of particular importance especially in the context of the current epidemiological situation related to COVID-19. The idea of the presented platform fits into the broadly understanding of Building Information Modeling. After introducing the methodology, stages of the inventory and follow-up process carried out within the platform are illustrated and discussed on the basis of a case study. Based on the obtained results it can be concluded that the proposed methodology creates a convenient, efficient and inexpensive tool for massive inspection of building resources in large areas. The inventory is based primarily on high-quality photo and video material obtained from the deck of an unmanned aerial vehicle and the expert knowledge of the inspector conducting the inspection. By combining digital images data (photos, 3D model, orthophotos) with substantive data (facade element classification tables, wear / defect classification tables), we get a platform that allows intuitive access to viewing, classification, editing and analysis of selected data.


Sign in / Sign up

Export Citation Format

Share Document