Game Changer in Dealing With Hard Scale Using a Slickline Torque Action Debris Breaker

2021 ◽  
Author(s):  
Mahmoud Mohamed Koriesh ◽  
Mahmoud Atia Elwan ◽  
Ali ELbasyouni Mousa ◽  
Mahmoud Ibrahim El Shiekh ◽  
Maria Leticia Vazquez ◽  
...  

Abstract Scale deposition is a major concern in Gulf of Suez Fields, variations in water composition and operating conditions resulted in the deposition of full spectrum of scale depositions in different fields. The common practice in GOS is to prevent scale deposition by periodical scale inhibition treatment. However the field experience showed variation in efficiency of inhibition under different operating conditions which results in some cases in scale deposition. In this case we are obliged to react and do intervention to clean out these wells either with chemical dissolution or coiled tubing clean out which is sometimes becomes costly and stand clueless in front of hard scale. Typically, in offshore operating fields, rig-less solutions is the optimum. A simple, innovative, and cost effective Torque action debris breaker tool is a new rig-less solution deployed on slick-line unit. The tool can be run at different sizes to allow for optimum scale removal. Activation is achieved via downward jarring action. The TADB tool applies a new operating concept different from milling. The tool consists of a sharp knife with a broach body. The operating mechanism uses the jarring down action in order to apply jackhammer force on the scale accumulation, which allows decreasing the bond between different layers of scale and between the scale and tubing. Another advantage is having the knife rotating after each jar action, which allows this force to be applied on different positions of scale accumulation adding more efficiency. The tool was first deployed in Egypt in one of the challenging oil wells offshore gulf of suez, which has a historical scale deposition issues "mainly hard deposition of zinc & lead sulfides". several trials were performed to clean out the well historically using coiled tubing operations using barge assist, it took 2 months of operation to achieve partial success & the well was worked over later. The Torque Action debris breaker was tried against the same scale type and found successful. allowing the well to be drifted with 2.7" compared with 2.25" before the job. The operation cost is by no means comparable to the previous cost of coiled tubing operations. Following this wells three other wells were intervened using the same tool and showed much better progress of scale clean out in comparison with other slick-line tools & historical coiled tubing performance in these wells. The implementation of this technology has generally optimized operating cost compared to lengthy and costly CT/WO operation minimizing footprint, equipment, manpower, job duration, and provide a more environmentally friendly solution.

2021 ◽  
Author(s):  
Mark Grutters ◽  
Sameer Punnapala ◽  
Dalia Salem Abdallah ◽  
Zaharia Cristea ◽  
Hossam El Din Mohamed El Nagger ◽  
...  

Abstract Asphaltene deposition is a serious and re-occurring flow assurance problem in several of the ADNOC onshore oilfields. Fluids are intrinsically unstable with respect to asphaltene precipitation, and operating conditions are such that severe deposition occurs in the wellbore. Wells in ADNOC are generally not equipped with downhole chemical injection lines for continuous inhibition, and protection of the wells require frequent shut-in and intervention by wireline and coiled tubing to inspect and clean up. Since some of the mature fields are under EOR recovery strategies, like miscible hydrocarbon WAG and CO2 flood, which exacerbates the asphaltene precipitation and deposition problems, a more robust mitigation strategy is required. In this paper the results of two different mitigation strategies will be discussed; continuous injection of asphaltene inhibitor via a capillary line in the tubular and asphaltene inhibitor formation squeeze. Three asphaltene inhibitors from different suppliers were pre-qualified and selected for field trial. Each inhibitor was selected for a formation squeeze in both one horizontal and one vertical well, and one of the inhibitors was applied via thru-tubing capillary string. The field trials showed that continuous injection in remote wells with no real-time surveillance options (e.g. gauges, flow meters) is technically challenging. The continuous injection trial via the capillary string was stopped due to technical challenges. From the six formation squeezes four were confirmed to be effective. Three out of fours squeezes significantly extended the production cycle, from approximately 1.4 to 6 times the normal uninhibited flow period. The most successful squeezes were in the vertical wells. The results of the trial were used to model the economic benefit of formation squeeze, compared to a ‘do-nothing’ approach where the wells are subject to shut-in and cleanup once the production rates drop below a threshold value. The model clearly indicates that the squeezes applied in ADNOC Onshore are only cost-effective if it extends the normal flow period by approximately three times. However, a net gain can be achieved already if the formation squeeze extends the flow cycle by 15 to 20%, due to reduction of shut-in days required for intervention. Therefore, the results in this paper illustrate that an asphaltene inhibitor formation squeeze can be an attractive mitigation strategy, both technically and economically.


The choice of cost-effective method of anticorrosive protection of steel structures is an urgent and time consuming task, considering the significant number of protection ways, differing from each other in the complex of technological, physical, chemical and economic characteristics. To reduce the complexity of solving this problem, the author proposes a computational tool that can be considered as a subsystem of computer-aided design and used at the stage of variant and detailed design of steel structures. As a criterion of the effectiveness of the anti-corrosion protection method, the cost of the protective coating during the service life is accepted. The analysis of existing methods of steel protection against corrosion is performed, the possibility of their use for the protection of the most common steel structures is established, as well as the estimated period of effective operation of the coating. The developed computational tool makes it possible to choose the best method of protection of steel structures against corrosion, taking into account the operating conditions of the protected structure and the possibility of using a protective coating.


Author(s):  
Q. Kim ◽  
S. Kayali

Abstract In this paper, we report on a non-destructive technique, based on IR emission spectroscopy, for measuring the temperature of a hot spot in the gate channel of a GaAs metal/semiconductor field effect transistor (MESFET). A submicron-size He-Ne laser provides the local excitation of the gate channel and the emitted photons are collected by a spectrophotometer. Given the state of our experimental test system, we estimate a spectral resolution of approximately 0.1 Angstroms and a spatial resolution of approximately 0.9 μm, which is up to 100 times finer spatial resolution than can be obtained using the best available passive IR systems. The temperature resolution (<0.02 K/μm in our case) is dependent upon the spectrometer used and can be further improved. This novel technique can be used to estimate device lifetimes for critical applications and measure the channel temperature of devices under actual operating conditions. Another potential use is cost-effective prescreening for determining the 'hot spot' channel temperature of devices under normal operating conditions, which can further improve device design, yield enhancement, and reliable operation. Results are shown for both a powered and unpowered MESFET, demonstrating the strength of our infrared emission spectroscopy technique as a reliability tool.


2021 ◽  
Vol 4 (1) ◽  
Author(s):  
Naef A. A. Qasem ◽  
Ramy H. Mohammed ◽  
Dahiru U. Lawal

AbstractRemoval of heavy metal ions from wastewater is of prime importance for a clean environment and human health. Different reported methods were devoted to heavy metal ions removal from various wastewater sources. These methods could be classified into adsorption-, membrane-, chemical-, electric-, and photocatalytic-based treatments. This paper comprehensively and critically reviews and discusses these methods in terms of used agents/adsorbents, removal efficiency, operating conditions, and the pros and cons of each method. Besides, the key findings of the previous studies reported in the literature are summarized. Generally, it is noticed that most of the recent studies have focused on adsorption techniques. The major obstacles of the adsorption methods are the ability to remove different ion types concurrently, high retention time, and cycling stability of adsorbents. Even though the chemical and membrane methods are practical, the large-volume sludge formation and post-treatment requirements are vital issues that need to be solved for chemical techniques. Fouling and scaling inhibition could lead to further improvement in membrane separation. However, pre-treatment and periodic cleaning of membranes incur additional costs. Electrical-based methods were also reported to be efficient; however, industrial-scale separation is needed in addition to tackling the issue of large-volume sludge formation. Electric- and photocatalytic-based methods are still less mature. More attention should be drawn to using real wastewaters rather than synthetic ones when investigating heavy metals removal. Future research studies should focus on eco-friendly, cost-effective, and sustainable materials and methods.


2021 ◽  
Author(s):  
Nichnita Tortrakul ◽  
Chatwit Pochan ◽  
Nardthida Kananithikorn ◽  
Thanapong Siripan ◽  
Basil Ching ◽  
...  

Abstract This paper presents a method of reducing equivalent circulating density (ECD) while drilling using eccentric string reamers (ESR) with adjustable gage stabilizer (AGS) in Gulf of Thailand (GoT). Reduced ECD in slimhole is desirable when drilling depleted reservoirs as reduced borehole pressure can reduce or delay drilling fluid loss events. Delaying losses can allow well depth to be increased with the prospect of penetrating otherwise unrealized pay horizons and increasing reserves capture. Several methods of reducing ECD were considered but most solutions included changing drill string and/or casing design specifications with prohibitive cost. A low-cost, low operational-impact solution was needed. Hole-opening is a method of increasing annular clearance, but well delivery requirements of ~4.5 days per well necessitates a one-trip solution without introducing significant ROP reduction or negatively impact bottomhole assembly (BHA) walking tendencies. Further, the preferred solution must be compatible with a high temperature reservoir drilling environment and must not undermine drilling system operational reliability. A simple but controversial tool for hole opening is ESR. ESR’s are simple in that there are no moving parts or cutter blocks to shift, and operating cost is low. They are controversial due to uncertainty that the tool eccentricity and drilling dynamics will successfully open hole to the desired diameter. Given that the intent of this hole-opening application is limited to creating annular clearance for fluid, not mechanical clearance, the eccentric reamer solution was chosen for field trial and potential development. A tool design challenge was to create a reamer geometry with the desired enlargement ratio (6⅛-in. to 6⅞-in.) while drilling, and reliably drift surface equipment and casing without complications. The ESR design must efficiently drill-out cement and float equipment as well as heterogeneous shale/sand/mudstone interbedded formation layers without significant vibration. If successful, the enlarged hole diameter will increase annular clearance, reduce ECD, improve hole cleaning, and allow drilling depth to be increased to capture additional reserves The plug and play functionality of the ESR required no changes to the existing rig site procedures in handling and making up the tool. The ESR drifts the casing and drills cement and shoe track with normal parameters. The ESR is run with standard measurements-while-drilling (MWD)/logging-while-drilling (LWD) AGS BHA and is able to reduce ECD providing the opportunity to drill deeper and increase barrel of oil equivalent (BOE) per each wellbore. Performance analysis has shown no negative effect on drilling performance and BHA walking tendency. The novelty of this ESR application is its proven ability to assist in increasing reserves capture in highly depleted reservoirs. The ESR is performing very efficiently (high ROP) and reliability is outstanding. In this application, the ESR is a very cost-effective and viable solution for slimhole design.


2009 ◽  
Vol 131 (3) ◽  
Author(s):  
Philip L. Andrew ◽  
Harika S. Kahveci

Avoiding aerodynamic separation and excessive shock losses in gas turbine turbomachinery components can reduce fuel usage and thus reduce operating cost. In order to achieve this, blading designs should be made robust to a wide range of operating conditions. Consequently, a design tool is needed—one that can be executed quickly for each of many operating conditions and on each of several design sections, which will accurately capture loss, turning, and loading. This paper presents the validation of a boundary layer code, MISES, versus experimental data from a 2D linear cascade approximating the performance of a moderately loaded mid-pitch section from a modern aircraft high-pressure turbine. The validation versus measured loading, turning, and total pressure loss is presented for a range of exit Mach numbers from ≈0.5 to 1.2 and across a range of incidence from −10 deg to +14.5 deg relative to design incidence.


Author(s):  
Dominica Una ◽  
Dulu Appah ◽  
Joseph Amieibibama ◽  
William Iheanyi Eke ◽  
Onyewuchi Akaranta

Scale deposits are a significant flow assurance issue in oil and gas operation with huge financial consequences. Not only does scaling drastically impair well performance, but it also has the potential to permanently destroy formation and equipment. Scale inhibitors are commonly used to prevent the accumulation of scales. A good scale inhibitor should be stable at the minimum effective inhibitor concentration under imposed operating conditions without interfering with or being affected by other chemical additives. However, most conventional scale inhibitors that possess these attributes, do not meet environmental restrictions which make them unfavorable for continuous application, prompting the industry to focus more on developing eco-friendly substitutes. This paper reviews the various types of scale inhibitors and general scale inhibition mechanism, summarizes scale concepts and ultimately, assesses the potential of flavonoids from natural plants as potential green scale inhibitors.


2021 ◽  
Author(s):  
Y. Natalia Alfonso ◽  
Adnan A Hyder ◽  
Olakunle Alonge ◽  
Shumona Sharmin Salam ◽  
Kamran Baset ◽  
...  

Abstract Drowning is the leading cause of death among children 12-59 months old in rural Bangladesh. This study evaluated the cost-effectiveness of a large-scale crèche intervention in preventing child drowning. Estimates of the effectiveness of the crèches was based on prior studies and the program cost was assessed using monthly program expenditures captured prospectively throughout the study period from two different implementing agencies. The study evaluated the cost-effectiveness from both a program and societal perspective. Results showed that from the program perspective the annual operating cost of a crèche was $416.35 (95%C.I.: $222 to $576), the annual cost per child was $16 (95%C.I.: $9 to $22) and the incremental-cost-effectiveness ratio (ICER) per life saved with the crèches was $17,803 (95%C.I.: $9,051 to $27,625). From the societal perspective (including parents time valued) the ICER per life saved was -$176,62 (95%C.I.: -$347,091 to -$67,684)—meaning crèches generated net economic benefits per child enrolled. Based on the ICER per disability-adjusted-life years averted from the societal perspective (excluding parents time), $2,020, the crèche intervention was cost-effective even when the societal economic benefits were ignored. Based on the evidence, the creche intervention has great potential for reducing child drowning at a cost that is reasonable.


Author(s):  
Francesco Crespi ◽  
David Sánchez ◽  
Tomás Sánchez ◽  
Gonzalo S. Martínez

Previous work by the authors has shown that broader analyses than those typically found in literature (in terms of operating pressures allowed) can yield interesting conclusions with respect to the best candidate cycles for certain applications. This has been tested for the thermodynamic performance (1st and 2nd Laws) but it can also be applied from an economic standpoint. This second approach is introduced in this work where typical operating conditions for CSP applications (current and future generations of solar tower plants) are considered (900 °C and 30 MPa). For these, the techno-economic performance of each cycle are assessed in order to identify the most cost-effective layout when it comes to the Overnight Capital Cost. This analysis accounts for the different contributions to the total cost of the plant, including all the major equipment that is usually found in a CSP power plant such as the solar field and thermal energy storage system. The work is thus aimed at providing guidelines to professionals in the area of basic engineering and pre-feasibility study of CSP plants who find themselves in the process of selecting a particular power cycle for a new project (set of specifications and boundary conditions).


Sign in / Sign up

Export Citation Format

Share Document