Project Management and Dynamic Work Environments: The relationship between Leadership in Dynamic Work Environments in Kurdistan

2021 ◽  
Vol 7 (3) ◽  
pp. 10-18
Author(s):  
Bayad Jamal Ali ◽  
Govand Anwar
2000 ◽  
Vol 32 (1) ◽  
pp. 17-35 ◽  
Author(s):  
VICTOR AGADJANIAN

Data from three separate studies conducted in Maputo, Mozambique, in 1993 are used to analyse the relationship between the type of social environment in which women work and their fertility and contraceptive use. The analysis finds that women who work in more collectivized environments have fewer children and are more likely to use modern contraception than women who work in more individualized milieus and those who do not work outside the home. Most of these differences persist in multivariate tests. It is argued that collectivized work environments are most conducive to diffusion and legitimation of reproductive innovations. In contrast, individualized environments tend to isolate women and therefore may retard their acceptance of innovative fertility-related behaviour.


1980 ◽  
Vol 47 (3_suppl) ◽  
pp. 1167-1173 ◽  
Author(s):  
Michael David Coovert ◽  
Melvin Goldstein

With the increasing influx of computers in industry modifying jobs and work environments, it is necessary to understand how workers may be reacting to computers. Locus of control, within the framework of valence-instrumentality-expectancy theory, is seen as an efficient predictor of workers' motivation and job satisfaction. Two experiments are described in which the relationship between locus of control and attitude toward computers is explored. Exp. 1 (68 subjects) demonstrates a relationship between locus of control and attitudes toward computers. Internal scorers had a more positive (favorable) attitude toward computers than external persons. Exp. 2 (65 subjects) attempts to clarify the possible dimensions on which externals may be viewing the computer more negatively (unfavorably) by utilizing a locus of control scale developed by Levenson (1973).


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Matti Haverila ◽  
Jenny Carita Twyford

PurposeDrawing upon the relational exchange theory, the longitudinal relationship between various stages of project management customer satisfaction, value for money and repurchase intent are examined.Design/methodology/approachUsing a survey questionnaire, data were gathered over four consecutive quarters (N = 2,537). The statistical methods included exploratory factor analysis, confirmatory composite analysis (CCA) and partial least squares structural equation modeling (PLS-SEM).FindingsProject management was perceived as a three-dimensional construct (proposal, installation, commissioning/start-up). There was a significant longitudinal relationship between project stages and satisfaction in the complete data set. The results varied on the quarterly basis. The relationship customer satisfaction/repurchase intent was significant in the whole data set and during all quarters. This was the case for the relationships between value for money and customer satisfaction and between value for money and repurchase intent. The effect sizes were small between project management stages and customer satisfaction, small to medium for the value for money construct and large for the customer satisfaction construct.Originality/valueAn important implication is the significant relationship between the stages of project management and satisfaction. However, the effect sizes were small, however. The importance of the effect size in comparison to the significance of the relationships is highlighted especially when the sample size is large. The paper also confirms the linear relationship between satisfaction and repurchase intent. The nature of the relationship between customer satisfaction and loyalty is based on a moderate exchange relationship in the relational exchange continuum. The study contributes to the relational exchange theory in the context of project management.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Aqsa Ameer ◽  
Farah Naz ◽  
Bushra Gul Taj ◽  
Iqra Ameer

Purpose The purpose of this study is to determine the effect of conscientiousness and extraversion personality traits on project success. The relationship is mediated by affective professional commitment, whilst the relationship between personality traits and project success is moderated by organizational project management maturity. Design/methodology/approach The deductive approach is used to achieve the objectives of this study. Data were collected through a purposive sampling technique from 250 respondents with the help of questionnaires from information technology sectors. The structural equation modelling (SEM) in partial least squares-SEM and SPSS is used to analyse the data and to examine the hypothesis. Findings The outcomes demonstrate the partial mediating impact of affective professional commitment between the relationship of conscientiousness and extraversion personalities with project success. Additionally, it proves the moderating effects of project management maturity between the relationship of conscientiousness and extraversion personalities with project success. Practical implications This study reflects that employee personality appears to be a reliable indicator of how an employee is faithful to his profession. This faithfulness or duty decides the employee’s execution in terms of offering a successful project. Thus, achieving employee commitment needs to be done by completing the project successfully by the organizations in the presence of project management maturity systems. Originality/value It is the first study of its kind to provide experimental proof of the impact of a manager’s personality traits on project success in the presence of affective professional commitment (mediator) and organizational project management maturity (moderator).


Author(s):  
Neama Mostafa RaKaban ◽  
Hanaa Saeed Salama

The research aims to study the relationship between the management strategies of the small projects of the workers in their dimensions: (Project phase strategy, making decisions, the project management strategy of financial production, Marketing Productive Management Strategy, the strategy of managing productive legal projects) with satisfaction with life dimensions: (Psychological compatibility, Self-compliance, Work environment, and Social compatibility) . The research sample consisted of 102 persons working in four small projects, "Ceramics - Bamboo - Serma - Hand Carpets". They were selected in a pesky-purpose manner from the employees of these projects in Sakiet Abu Shaara village, Sentris, Menoufia Governorate and 10th of Ramadan City. "General data form", "Project Management Strategies scale", and "measure of satisfaction with life" were applied. The study followed the descriptive and analytical approach. The data were categorized and analyzed using appropriate statistical methods through the SPSS statistical program such as number and percentages, arithmetic mean, standard deviation, T-test, Pearson correlation coefficient, Chi-square and F-test. The most important results are related to the relationship between the project management strategy and the financial productivity and self-compliance at the level of significance of 0.01, which means that the realization of the requirements of the project in terms of finance and meet the needs, resulting in self-compatibility.  There is also a correlation between the project management strategy and the business environment at the level of 0.01 meaning that whenever the project needs to be met in terms of funding and meet the needs of the project as this leads to compatibility with the place of residence of the project and the surrounding environment, there is an inverse correlation Between the social situation and the decision-making at the level of significance of 0.01, which means that the greater the number of employees are married the less ability to make the decisions needed in those small projects, which means the impact of the ability to make decisions on the social situation of the individual. There were statistically significant differences between the averages of the different projects in terms of the overall project management strategy according to the dwelling. The highest value was for the medium in the ceramics project and the lowest in the hand carpets where the ceramic represents the highest average 2.000 while the carpets represent the lowest average by 1.809 at the level of significance 0.1. There were significant differences between the mean of the various projects in terms of satisfaction with total life according to the dimension of psychological compatibility and the highest value for the average in the hand carpet project where the results showed that the average and standard deviation of hand carpets is (23.745 ± 4.38) The recommendations of the government, decision-makers and ministries to establish a culture of entrepreneurship and motivate young people to set up private projects through the media, paying attention to the enactment of laws on small projects to motivate young people to establish and develop small and micro enterprises, In various stages to ensure the success and continuity of the project.


Author(s):  
Brian J. Galli

The purpose of this study is to examine the risks of using statistical tools in a project basis. A systematic search of certain academic databases has been conducted for this study. Statistical tools could be used in a project, and they should be properly planned and designed. Statistical tools include major activities, such as collecting and analyzing data, providing meaningful interpretation, and reporting findings. When dealing with statistical tools, there are several risks that may exist and impact the project either positively or negatively. This study covers a brief outline of the risk management, statistical tools, and the relationship between the two concepts. Finally, a discussion of the common type of risks that are initiated by using statistical analysis tools are provided, which could be planned, identified, and analyzed in the early stages of the project.


2019 ◽  
Vol 9 (2) ◽  
pp. 56-65
Author(s):  
Michael Pace

Abstract This non-experimental correlational study extends previous research investigating the relationship between project management methodology and reported project success, as well as the moderating variables of industry and project manager experience. The sample included North American project managers with five years’ experience, 25 years of age or older, and experience with multiple project management methodologies. The survey instrument consisted of 58 questions, utilizing a 5-point Likert scale to record responses. The survey contained three sections, including demographic information, questions related to a successful project, and questions related to a less-than successful (failed / challenged) project. 367 usable responses were received. The examination of the constructs included Pearson’s correlation coefficient as well as linear regression to determine the impact of moderating variables. Results indicated that project management methodology has a weak correlation with reported project success, and this correlation is not moderated by industry nor project manager experience. The results did not align with previously conducted studies, illustrating a need to continue the study of methods impacting success including investigating additional moderating variables.


2002 ◽  
Vol 33 (4) ◽  
pp. 39-47 ◽  
Author(s):  
Steve D. Giffin

A taxonomy of Internet applications has been created to describe the use of the Internet for project management communication. It is based on the technological characteristics of Internet applications, the requirements of project management communication, and the organizational issues associated with using Internet applications. Its dimensions are the sender/receiver synchronization and the relationship between the number of senders and receivers. The taxonomy is populated with six Internet applications that are used commonly in project management communication. The taxonomy is presented as an aid to understanding the capabilities and limitations of Internet applications for different types of project management communication.


Sign in / Sign up

Export Citation Format

Share Document