scholarly journals Kematangan Shop Drawing Sebagai Penentu Pekerjaan Ulang (Rework) Proyek Konstruksi

Author(s):  
Ryan Immanuel ◽  
Bambang Endro Yuwono

<span><em>Construction project implementation mostly faced by rework. Rework couldn’t be avoided and is experienced </em><span><em>in a construction world. Rework is defined as all physical work of construction committed more than once or </em><span><em>re-work which is done by contractor in the implementation stage, and or an activity to eliminate works that </em><span><em>have been done before as a part of construction project out of resource context, where there is no change order </em><span><em>and making up the cost from the owner. Rework could give a bad impact to performance, work productivity,</em><br /><span><em>and cost directly or indirectly having it has a quite significant consequences. By considering the bad impact </em><span><em>obtained has far-reaching consequences, hence efforts to reduce the occurrence of rework in construction </em><span><em>project stage is highly needed. </em><span><em>This research was conducted to prove the maturity of Shop Drawing as a </em><span><em>Determinant of Rework Project Construction of Multilevel Buildings Research carried out by using </em><span><em>questionnaires. Respondents at the main survey stage were shown to contractors who were carrying out </em><span><em>multistorey construction projects in the DKI Jakarta and surrounding areas. Respondents who filled in the</em><br /><span><em>Project Manager questionnaire were 3 people, 7 Site Managers, 5 Supervisors, 6 Quality Controls, 4 </em><span><em>Engineering staff. In this study, data analysis techniques are determined using the AHP (Analytical Hierarchy </em><span><em>Process) method, aiming to determine the dominant factors (ranking) of the factors that cause rework in</em><br /><span><em>construction work to prove the maturity of Shop Drawing As Determine Project Rework Construction of </em><span><em>multistorey buildings. The results of this study indicate that the maturity of shop drawings greatly determines </em><span><em>the occurrence of rework in multistorey building projects.</em></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span><br /><br class="Apple-interchange-newline" /></span></span>

2018 ◽  
Vol 13 (1) ◽  
pp. 35-45
Author(s):  
Cut Zukhrina Oktaviani

This paper aims to reviewed construction projects complexity in construction complex procurement. Construction complexity is influenced with many internal and external factors. Complexity covers entire construction project cycles. At construction work procurement stage, organization and processes complexity is a major concern, especially in government procurement. Complexity requires regulation and control are such that it does not happen obstacles at every project construction cycle stage. 


2019 ◽  
Vol 5 (1) ◽  
pp. 29-34
Author(s):  
Ayu Herzanita

WBS (Work Breakdown Structure) plays an important role in every construction project. WBS is a hierarchy of decreasing scope of work to become the smallest level called a work package, making it easier in the process of project management and control. The current problem is that many contractors in Indonesia, both large and small contractors, do not understand the importance of using WBS in a construction project. This causes project performance to be less than optimal, especially on cost and time performance. Currently, WBS standards have been developed for building projects. In this study will look at the cost and time performance of the project from the use of WBS standard building. The sample used in this study are projects that have applied the use of project standards. The projects include Building X, Lecture Building Y, and Sports Facility Building Z. The method used in this study is the EVM (Earn Value Method) approach, collecting data using questionnaires. The results showed that using the WBS standard had an effect on cost and time performance. Good cost and time performance is shown in the Building X and Lecture Y buildings. While the cost and time performance of the Z Sports Facility Building tends to be unstable. This is because the work items that exist in the WBS standard are not in accordance with the project conditions, so it is necessary to adjust work items.


2019 ◽  
Vol 5 (1) ◽  
pp. 13-19
Author(s):  
Fitri Nur Kharina ◽  
Kusno Adi Sambowo

Construction projects in all regions continues to be developed for the creation of facilities that can be utilized by the community. One of them is the construction of apartments which are now being intensively carried out to meet residential needs for the community. Making a construction project plan always refers to estimates that exist at the time development plan is made, therefore problems can arise if there is a discrepancy between the plans that have been made and the actual reality. So the impact that often occurs is the delay in the time of project implementation which can also be accompanied by an increase in the cost of implementing the project. In the construction project of Cinere Terrace Suites Apartemen & Citywalk, Jakarta there was a delay resulting in a late payment of monthly bill progress by the owner. Based on the above reasons, this research was conducted to find out how the project performance was seen from the cost and time period of the review period. how is the estimated cost and time to complete the overall project work. The method used in the analysis of this study is the Earned Value Method. Based on the results of the analysis carried out for 29 weeks the project performance on schedule has been delayed and cost shows a positive value. For the estimated completion time of the project there is an increase in time whose duration increases from the planned 98 weeks or 685 days to 109,624 weeks or 768 days. While the estimated cost of completing the project from the results of the analysis obtained a value of Rp. 270,147,448,569.16 smaller than the planned cost of Rp. 315,272,727,272.73. With the difference VAC of Rp. 45,125,278,703.57 this shows that there are benefits obtained by the contractor.


2019 ◽  
Vol 277 ◽  
pp. 03013
Author(s):  
Noraziah Mohammad ◽  
Zabidi Hamzah

Variation order refers to any changes from the scope, plan, specification or contract document in the construction project. This changes of work is a common problem in construction projects in Malaysia. It is inevitable in any construction project and this problem can become more serious when variation order causes work progress to be impaired as a results it increased the construction time and cost that affects the construction industry in Malaysia. This paper critically review the causes of variation order in the construction industry on the double-storey terrace housing project in Malaysia. The discussions began with the construction industry in Malaysia and then related parties involved in the construction industry. The extensive local and abroad literature review on the definitions of variation order and analysis of past studies conducted on variation order and the previous study of the prediction model of variation. The extensive literature on variation order in the construction of building project may help to improve the performance in term of time, cost and quality of the construction of building projects in Malaysia.


2013 ◽  
Vol 457-458 ◽  
pp. 1639-1643
Author(s):  
Han Wen Li ◽  
Fu Zhou Luo

The optimization of scheduling is an important aspect of the construction project plan, the paper proposes applying improved ant colony optimization to solve the public construction projects scheduling optimization problem under limited resource condition and constructs the mathematical model of the project construction schedule optimization. Further verify the validity of the model and the improved ant colony optimization on the schedule of the optimization problem solving has universal applicability.


Author(s):  
Muhamad Abduh ◽  
Farrel Adam

Request for information (RFI) is considered as one of the important administrative tools in construction projects. It can be used as an indicator on how well the coordination between parties, especially between contractors and engineers and/or supervisors, performed in a project. Delays in a construction project could be identified by analyzing the RFI documents, but on the other hand, they could also be caused by poor administrative in handling the RFI documents and by delays in processing RFIs. This paper reviews the performance of four building projects in handling their RFI documents. The four buildings were constructed by a national joint-operation contractor, designed and supervised by an international joint-operation consultant. The RFI responses and wok-in-process were used to measure the project’s performance in handling the RFI documents; from the contractor’s and the engineer’s point of views. The analysis results show that the engineer had been very responsive in processing RFIs, while the contractor had difficulties. In general, the contractor was lack of capable personnel in handling RFIs for all four buildings. Moreover, communication problem was the key of the project’s performance due to different language and culture. The authors believed that the results of the analysis would influence to the overall project performance.


2021 ◽  
Vol 263 ◽  
pp. 05048
Author(s):  
Maria Bovsunovskaya

The study is devoted to substantiating the need to develop a cost controlling system in order to improve the efficiency of investors, developers, customers, general contractors, as well as representatives of the banking system who are directly involved in the implementation of investment and construction projects. The paper summarizes the innovations of the Ministry of Construction, Housing and Utilities of the Russian Federation in the field of determining the cost of construction at the stages of the life cycle of an investment and construction project, and suggests their adaptation to the activities of commercial customers. The factors of the rise in the cost of construction in the modern conditions of the investment and construction sphere are systematized, including topical issues of the rise in cost due to the increase in prices of building materials. The main risks arising from the implementation of the project associated with an increase in cost are highlighted. As the results of the study, stages of construction cost control with a description of their content and a system of cost controlling of an investment and construction project are proposed.


2020 ◽  
Author(s):  
Satya Kumara

Cost overrun in the field of project construction is still a global issue, and it is a challenge to seek for solution from various scientific discipline including information technology. This thesis aims to design a business intelligence application model for analyzing the cost of construction project to provide follow-up information as quickly and as early as possible to assist the executives to make valuable business decisions. This case study was prepared through literature reviews, interviews, and direct observation to obtain overview of the business processes in the construction company. The modeling of BI application which can be successfully developed using agile methods is very effective in addressing the change. This case study found that the application of business intelligence which provides information on key performance indicator (KPI) can assist the executives of the company to make decisions quickly and precisely, thus improving the performance of the project, especially in the cost control.


Jurnal PenSil ◽  
2020 ◽  
Vol 9 (1) ◽  
pp. 19-27
Author(s):  
Huda Darussyafa ◽  
Irika Widiasanti ◽  
Anisah

This study aims to determine the dominant factor of the positive impact of ownership of work competency certificates in the perception of artisan on highrise building projects in the city of South Jakarta. Based on existing data the number of workers who already have work competency certificates is still very minimal. That is caused by several factors, namely the process of implementing certification which is considered complicated to the cost which is considered expensive. But behind these constraints, work competency certificates can have a positive impact on construction workers who have them. In this study conducted by quantitative methods by analyzing the percentage of respondents' perceptions. This research was carried out on the Cithaland Tower project, Alamanda Tower, Dharmawangsa Office Tower. The total number of respondents to be studied is 44 people. In this study the dominant factor studied was measured through four indicators namely work motivation, work productivity, work ability and competitiveness. With each percentage acquisition namely for Work Motivation 26.44%, Work Productivity 24.40%, Work Ability 24.66%, and Competitiveness 24.50%. Of the four indicators there is one indicator with the highest percentage and is the most dominant factor, namely the Work Motivation indicator with a percentage of 26.44%.


Author(s):  
Mega Waty ◽  
Hendrik Sulistio

A Change Order is a written and legal work order that changes the scope of the original contract, with compensation that has been agreed upon by the owner and the contractor. Changes can be in the form of adding or reducing the scope of work, changing materials, or changing schedules. Change Order causes the cost of contract items to swell, planning errors and negligence as well as changes in scope that can be reduced by sharpening planning results. The scope of research on road construction in Indonesia, especially in DKI Jakarta and Banten provinces. This study aims to determine the identification of change orders in road construction projects. Data obtained from real data on road construction projects from 2013-2018 on 16 road construction project packages in the form of road construction project addendum contracts. Based on the addendum contract, added work, less work, addition of new items and removal of work items are determined. The identification of change order risk is seen from three aspects, namely the addition and reduction of work items, the removal of items and the addition of new items and the wishes of the owner, thereby increasing the cost of the change order contract. This study found 732 changes in construction work items. Risk identification is obtained from the frequency of changes above 35% which is an intermediate frequency that tends to increase the occurrence of change orders. The results of risk identification were obtained for 31 construction work items, the highest percentage was for Thermoplastic Road Marking work, followed by 30 other construction work items. Keywords: risk identification; change orders; road construction projects  AbstrakChange Order adalah perintah kerja tertulis dan sah  yang mengubah lingkup kontrak semula, dengan kompensasi  yang sudah disetujui oleh pemilik dan  kontraktor.  Perubahan dapat berupa penambahan atau pengurangan lingkup pekerjaan, perubahan material, atau perubahan jadwal. Change Order menyebabkan biaya  item kontrak membengkak, kesalahan perencanaan dan kelalaian serta perubahan ruang lingkup yang dapat dikurangi dengan mempertajam hasil perencanaan.. Lingkup penelitian pada konstruksi jalan di Indonesia khususnya  provinsi DKI Jakarta dan Banten. Penelitian  bertujuan untuk  mengetahui  identifikasi change order proyek konstruksi jalan. Data didapat dari data riil proyek konstruksi jalan dari tahun 2013- 2018 pada 16 paket proyek konstruksi jalan berupa kontrak addendum proyek konstruksi jalan. Berdasarkan kontrak addendum maka ditentukan pekerjaan tambah, pekerjaan kurang, penambahan item baru dan penghilangan item pekerjaan. Identifikasi risiko change order dilihat dari tiga aspek yakni penambahan dan pengurangan item pekerjaan, penghilangan item dan penambahan item baru dan keinginan dari pihak owner sehingga meningkatkan biaya kontrak change order.  Penelitian ini mendapatkan 732 perubahan  item pekerjaan konstruksi.  Identifikasi risiko didapat dari  frekuensi perubahan diatas 35% yang merupakan frekuensi menengah yang cenderung meningkatkan terjadinya change order. Hasil identifikasi risiko didapat pada  31 item pekerjaan konstruksi, yang tertinggi persentase pada pekerjaan  Marka Jalan Termoplastik, diikuti 30 item pekerjaan konstruksi lainnya.