scholarly journals Mechanisms for implementing Lean - technologies as an innovative approach in modeling the structure of the standard time determining for construction processes implementation

2021 ◽  
Vol 1 (47) ◽  
pp. 26-36
Author(s):  
I. Rudnieva

Recently, a significant number of scientists' works have been devoted to the application of the lean-production principles, in particular, the introduction of lean construction. Objective construction cost estimation is a key factor in construction projects. The article discusses the problems, significant losses, low productivity in construction companies and the possibilities of their elimination due to the use of the lean-construction management concept as an innovative approach in modeling the structure of the standard time determining for construction processes implementation in order to increase the company's competitiveness. The productivity of the construction industry worldwide has been falling for the past 40 years. Companies must use appropriate methods to reduce their losses and increase productivity levels so that they can stand in the rapidly changing competitive environment of the current business environment. One of the approaches to improving the situation is the use of "lean management" in the construction industry is the result of the desire of construction business owners to optimize costs and increase labor productivity, the efficiency of organizational and technological processes, and introduce lean- production in the construction industry. A huge number of scientists and construction professionals are trying to change the traditional organizational and technological form of construction production and add value to owners, while making real profits. As a result, lean manufacturing tools have emerged that have been successfully applied to simple and complex construction projects. Ukraine is very far behind in terms of the development level of innovative processes from many countries of the world. Outdated ENiR norms, which were developed without taking into account the Lean strategy, need to be finalized. Of course, the introduction of a lean manufacturing system is a topic for the near future. Thanks to this, it is possible to significantly reduce the cost overruns on projects, as well as the time of their implementation up to 30%, or even more. Therefore, future research objective should be the development of a new modern methodology for determining the standard time, which will take into account the criteria of lean technologies, as an innovative approach in modeling the structure and sequence of all operations of construction processes.

2019 ◽  
Vol 5 (2) ◽  
pp. 29-37
Author(s):  
Mohammad Darabseh

Lean Construction is one of the methods used to improve control over construction projects by eliminating waste in time and materials. Lean Construction is an adaptation from the Lean Manufacturing principles to the construction industry. The purpose of this article was to review the case studies published in 2018 in the Inspec database to find out where Lean is being implemented and how. The article approach by setting the search criteria first and then inspect the result to find the non-related results and eliminate it. After that, the article was reviewed and summarized. The article verifies each article finding; however Lean Construction and Building Information Modeling (BIM) are relatively new for the construction industry and they still need more time to be adopted widely and to be applied on a lower-cost budget. However, the discussed cases show a promising future for these technologies.


2021 ◽  
Vol 318 ◽  
pp. 02003
Author(s):  
Hassan Kamal Alhilli ◽  
Sedki I. Rezoqi

Changes are a common phenomenon in the construction industry, impacting the project's cost, time, and performance. The purpose of this work is to a comprehensive review relating to variation order causes. Also, the aim here is to determine variation order causes in the building’s construction. More importantly, explore the relationship between these causes. However, the importance of specifying the causes for change orders is the first step in managing variation orders to reduce the harmful effect on a project. The field survey was conducted for several institutions such as health (Karkh’s health), higher education (University of Baghdad and University of Kufa). As a result, a field visit was made to the project sites. They were then, Conducting interviews with the resident engineer, the consultant, and the contractor. A developer tool called cause (variation orders) breakdown structure (CBS) included 12 causes at the first level, including 103 sub-causes. There is a relationship between the variation orders causes, which is evident in the third level. The study recommends adopting (CBS) a comprehensive reference for variation order causes in projects due to facilitating their management processes. Future research could examine the relative importance of variation order causes, in addition to using a fuzzy cognitive map to find the extent of each cause’s influence on the other.


2021 ◽  
Author(s):  
Sevilay Demirkesen

Lean manufacturing first emerged in the automotive industry. However, low productivity and low efficiency in production are major problems for the majority of industries relying on a heavy workforce. Being one of these, the construction industry suffers from low productivity rates along with inefficient work practices. To prevent those, the industry has shifted its focus from the traditional approach to a more innovative one, which is called Lean construction. Lean construction aims to maximize value while minimizing waste. Therefore, it intends to create safer, smoother, and more efficient processes to eliminate waste. This chapter focuses on Lean construction and highlights the generic Lean tools and techniques practiced in the construction industry indicating its historical journey from Lean manufacturing. The chapter aims to raise awareness towards the efficiency of Lean methods in the construction industry with respect to practices observed in manufacturing.


2021 ◽  
Author(s):  
Michael Donn ◽  
Alexis Dykman ◽  
Nilesh Bakshi

This research investigates how contingency is currently calculated in project budgets within the building industry. This is an important aspect to consider as a large proportion of construction projects are significantly over-budget. The study presents three non-simulation methods and one simulation method for calculating cost contingency following the results of a forthcoming journal paper. These methods are applied against a case study project in attempt to highlight the most reliable method, and to create a methodology that will be useful to the industry. This paper identifies that the traditional fixed percentage approach is not sufficient and suggests that this could be one of the main reasons why construction projects are over budget. While it is unclear which method is the most reliable, this study provides a focus for future research into reliability and utilisation of contingency methods in the building industry. The research demonstrates that current practice needs to change to reduce the large number of construction projects that run over budget.


2019 ◽  
Vol 24 (3) ◽  
pp. 274-293
Author(s):  
Adnan Enshassi ◽  
Nour Saleh ◽  
Sherif Mohamed

Purpose This paper aims to investigate the application of lean construction (LC) techniques in reducing accidents in construction projects. Design/methodology/approach A quantitative approach was used to collect the required data using a questionnaire survey and descriptive analysis was used to analyse the collected data. The LC techniques that were investigated in this paper are related to the tools of the last planner system (LPS), increased visualisation (IV), 5S, error-proofing, daily huddle meetings (DHMs), first-run studies (FRS), continuous improvement (Kaizen) and accident investigation (5Whys). Findings The overall results indicated that LC techniques are poorly implemented in construction projects in the Gaza Strip. The top three LC tools used to reduce the causes of accidents in the Gaza construction projects were 5Whys, 5S and LPS, while the highest three LC techniques applied to reduce the causes of accidents that were applicable were cleaning the workplace and removing materials and machines that are not required; conducting accident investigation and root cause analysis programmes; and using safety signs and labels on site. Research limitations/implications There is a lack of information and published studies regarding the links between LC and safety, especially in the Middle East. This paper is limited to the perceptions and geographical boundaries; therefore, it cannot be generalised. However, it could form the basis for useful comparison in the future. Triangulation research method could also be used in future research to minimise the bias and validate the conclusions. Practical implications The findings of this paper will stress professionals and construction companies in Gaza to reconsider their behaviour towards using LC techniques. The findings of this paper will aid them to shift their attention and resources towards including LC techniques in their plans to reduce the causes of accidents on construction sites. Social implications The findings of this paper will encourage professionals and construction companies in Gaza to reconsider their behaviour towards using LC techniques. The findings will also aid them to shift their attention and resources towards including LC techniques in their plans to reduce and/or avoid the causes of accidents on construction. Originality/value Because of the lack of published works that are specific to the Middle East, the authors believe that the originality lies in the paper’s serious attempt to explore the application level of the LC concept to safety in this part of the world. This paper contributes to a better understanding of the applicability of LC techniques in terms of accidents reduction. Findings from this paper provide a clear picture of the current status of using LC techniques to reduce accidents in the Gazan construction projects which drive them to investigate the main barriers and try to overcome them.


2021 ◽  
Vol 4 (1) ◽  
pp. 50-64
Author(s):  
Ja’far A. Aldiabat Al-Btoosh

Variation order (VO) is one of the main issues faced by the construction industry in Jordan. Many researchers had investigated on the causes of VO and proposed procedures to minimize and control this issue; however, the VO is affecting the construction industry badly even at moment. Building Information Modeling (BIM) is a powerful management system that can make a significant difference in the project costs. However, BIM has not been examined as a tool to minimize the VO in Jordan. The main target of this study is to utilize BIM applications in reducing the effect of VO on the governmental projects in Jordan. In order to achieve this target, the researcher has designed a questionnaire to gather data related to VO causes and the BIM capability to solve this problem. The data collected from the questionnaires were analyzed statistically. The result from the analysis found that the consultant initiated the highest VO of 50% followed by the clients and the contractors of 20% and 10% unforeseen variation respectively. Moreover, it is found that BIM Design Applications, Facility Operations Simulation, Exploration Design Scenarios, BIM Design Detection and BIM Quantity Take-off and Cost Estimation were significantly capable of minimizing VO. The results show positive relationship with the application of BIM in minimizing VO in the construction industry in Jordan. © 2018. JASET, International Scholars and Researchers Association


2018 ◽  
Vol 4 (10) ◽  
pp. 2328
Author(s):  
Aftab Hameed Memon ◽  
Muhammad Akram Akhund ◽  
Abdul Nasir Laghari ◽  
Hafiz Usama Imad ◽  
Shadab Noor Bhangwar

There is a philosophy in the construction industry to reduce the cost of a project by reducing construction waste and improving productivity. With lower expenses, lean construction emphasizes the cost of the project at a minimum cost. Globally, the philosophy has gained a wide range of popularity in the construction sector. The Lean Construction has helped practitioners with several tools and techniques to implement at different stages of a construction project. Following global trends, this study has investigated lean practices in Pakistan. With the potential advantages experienced by its implementation in Pakistan's construction projects and the level of implementation of various types of tools and techniques has been analyzed. To achieve the goal, the study had tried to capture construction projects in which four shareholders are being represented, which are clients, consultants, contractors and material suppliers. Overall 34 completed questionnaires were collected and then analyzed. The results of the analysis have indicated that pull approach, standard of work, time consuming, visualization tools, the integrated project delivery methods and the quality failure in safe limits are common lean techniques which are being implemented to the local construction industry. While there are major benefits of waste reduction, client satisfaction, better communication, visual control and proper task management to build appropriate work are the key benefits of lean construction.


2021 ◽  
Vol 58 (1) ◽  
pp. 5877-5896
Author(s):  
Enas Saad Abdal Aziz , Fayhaa abdullah yaqoob

The construction industries are distinguished from other industries by a special character in terms of their large size and continuous growth, and the dependence of many industries on them to secure their needs of various facilities, as the construction industry is an industry that produces its main product, construction. Examples of construction projects are buildings and paving roads. Building bridges, establishing schools, hospitals, etc. Most of the construction projects suffer from exceeding the specified time and the secret cost of the project, for several reasons, including the work environment, the country’s conditions, the method of managing the project’s cost, the techniques used in the implementation of the project, and accordingly, the concepts of Lean Manufacturing that help in addressing the causes of waste, in terms of Time and cost, accordingly, this study came to address deviations in the cost or time spent on lean construction techniques and to identify their causes in order to rationalize costs. . In addition to diagnosing waste areas and finding solutions in possible ways through the use of lean construction tools represented in the value flow map, standard work, continuous improvement, and total quality management. To analyze the stages and tasks of any project to reach the sources of waste and try to cancel unnecessary activities and find possible ways to implement them in order to improve the construction work and complete the projects on time and within the planned cost limits, taking into account the maintenance and raising the level of quality.


2020 ◽  
Vol 18 (6) ◽  
pp. 1691-1709
Author(s):  
Emmanuel Nsiah Ankomah ◽  
Joshua Ayarkwa ◽  
Kofi Agyekum

Purpose The purpose of this study is to ascertain the extent to which the practices of small and medium building contractors (SMBCs) conform to lean construction (LC) principles. Ultimately, practical results encourage a discourse on the true potentials and challenges to the holistic uptake of LC principles in the Ghanaian construction industry. Design/methodology/approach This research is based on a qualitative case study approach. The data was obtained through face-to-face structured interviews. Findings Across the cases, it was realized that there is a low-level application of LC principles among SMBCs. There was no indication that lean concepts were used on a company-wide basis in the Ghanaian construction industry. Furthermore, the study revealed that the traditional wasteful approach to managing construction projects was still prevalent among the firms. Practical implications This paper uses the 4P model as a foundation for assessing the extent to which the practices of SMBCs conform to LC principles. Practically, the study also created a certain level of awareness among the SMBCs about LC, LC principles and the benefits of the application of these principles within organizations. Originality/value This study contributes to the body of knowledge as it uncovers the status of LC implementation among SMBCs in the Ghanaian construction industry. The findings that are presented in this paper can be used as a starting point to disseminate the research and practice of LC among SMBCs.


2019 ◽  
Vol 9 (5) ◽  
pp. 597-615 ◽  
Author(s):  
Sadi Assaf ◽  
Mohammad A. Hassanain ◽  
Abdullatif Abdallah ◽  
Ahmed M.Z. Sayed ◽  
Abdulrahman Alshahrani

Purpose Projects in the construction industry have been confronted with an unprecedented volume of claims, which negatively impact the construction business environment. The purpose of this paper is to identify and assess the major causes of claims and disputes, from the perspectives of three key stakeholders. Design/methodology/approach An online and paper-based questionnaire was distributed to a random sample of 250 professionals. Responses from 86 construction professionals were obtained. The significance index was employed to rank the factors and hence assess their relative significance. Results were analyzed from both the individual stakeholder, and collective perspectives. Test of agreement was also conducted. Findings The research found the following causes to be the most significant contributors to claims and disputes in Saudi Arabia: “change or variation orders due to new requirements from client” (78 percent), “variations in quantities due to new requirements from client” (74 percent), “delay caused by contractor” (74 percent), “design errors or omissions” (72 percent) and “inconsistencies in the drawings and specifications” (70 percent). Originality/value The research provides an in-depth assessment of the causes of claims and disputes, in the setting of a fast growing industry, in which strong performance is essential to continued success. Unlike several of the reviewed studies which reported “delay caused by the owner” or “delayed in payment” as a major cause of claims and/or disputes, the findings of the current study indicated that this cause was not the most significant. Instead, it was determined that the top causes of claims and disputes were attributed to all parties, including consultants, contractors and clients.