scholarly journals LAND CONFLICT AND IMPACT ON TOLL ROAD DEVELOPMENT FOR PUBLIC BENEFIT IN SOUTH LAMPUNG REGENCY

2021 ◽  
Vol 3 (01) ◽  
pp. 40-52
Author(s):  
Muhamad Galank Novriwan Hakim ◽  
Rissa Afni Martinouva

The development of the Trans Sumatera toll road for the Bakauheni Terbanggi Besar Section II package currently causes uncertainty in the calculation of compensation for residual lands, so that there is a change in the function of the land from the remaining land affected by the development. The remaining land referred to in this study is the rest of the land that has been compensated by agencies that need land, in this case the Ministry of Public Works and Public Housing but still leaves problems that have not been resolved. The problem in this study relates to the basis and process of settlement of compensation for the residual land that has lost its social function and economic value in the construction of the JTTS Bakauheni-Terbanggi Besar Section, efforts that must be undertaken by the community for the remaining land that loses social function and economic value in the JTTS development Large Bakauheni-Terbanggi Section. This research is a normative and empirical juridical research. This research was conducted in Serdang Village, tanjung Bintang District, South Lampung Regency.

Jurnal Akta ◽  
2017 ◽  
Vol 4 (3) ◽  
pp. 373
Author(s):  
Abdullah Amirudin ◽  
Akhmad Khisni

Wakaf is one manifestation of love to Allah SWT, seeking ridho 'by donating some of their possessions with the best treasure. Wakaf plays an important role in economic development so as to realize the benefit for all ummah. In practice there are still many of the wakif who have memakafkan some of his property and has been submitted to nadzir, but not yet on the list so that the waqf objects are not teradministrasi well and kebaradaanya still many who have not known its existence.Unregistered wakaf land has caused many problems in the community, such as the cancellation of wakaf land by the heirs as well as the exchange of wakaf land due to the development of many sectors both industrial expansion and construction of public places such as toll road development. The role of a notary publicly acting as an official of the land deed as the official of the deed of pledge of waqf in the registration of wakaf land lies in the making of the pledge of wakaf pledge, as the basis for registration of wakaf land to the national land agency. And the making of deed of exchange of bolsters and release of right to execution of land exchange of wakaf land, so that become base of perfect proof for public benefit. Keywords: notary, wakaf, deed.


2020 ◽  
Vol 10 (2) ◽  
pp. 178-187
Author(s):  
Bambang Priatama

The study was conducted at the Ministry of Public Works and Public Housing Snvt Provision of Housing in Riau Province. The aim is to find out the direct effect of educational background and selection, on the competence and performance of field workers with supervision as a moderating variable. This study took a sample of 128 people. The variables used are educational background, selection, competence and performance and supervision. Data were analyzed using multiple linear regression analysis methods operated through the SPSS program. The results showed that there was an influence of educational background and selection on the competence of field workers. And simultaneously there is an influence of educational background and selection on competence. And there is an effect of competence on performance which is moderated by supervision. The better the supervision, the competence of field staff will increase.


2021 ◽  
Vol 4 (1) ◽  
pp. 109
Author(s):  
Verell Rengga Harsvardan ◽  
Anissa Noor Tajudin

This research will redesign the flexible pavement on the Kalihurip-Cikampek toll road using three flexible pavement design methods, namely the 2002, 2013 and 2017 methods, and analyze the structural responses that occur in the form of horizontal and vertical strain, the main components. In calculating the value of repetition of permits against fatigue damage (Nf) and groove cracks (Nd), it is processed using the KENPAVE program. Furthermore, the calculation results of the flexible pavement thickness, the value of repetition of permits against fatigue damage (Nf) and groove crack damage (Nd) were compared from the three methods. The method used is mechanistic-empirical. Primary data is obtained from the Ministry of Public Works and Public Housing and LHR0 starting in 2020, taking into account traffic growth from 2020 to 2035, as well as secondary data assumptions by referring to previous regulations and research. The results of this study indicate that the 2002 method produced the largest pavement thickness, while the 2013 and 2017 methods produced relatively the same pavement thickness. However, the 2002 method produced the largest repetition of permits against fatigue damage (Nf) and groove cracks (Nd). So it can be concluded that the 2017 method produces a better design. ABSTRAKPenelitian ini akan mendesain ulang perkerasan lentur pada Jalan Tol Jakarta-Cikampek ruas Kalihurip-Cikampek menggunakan tiga metode desain perkerasan lentur yaitu metode 2002, 2013, dan 2017, serta menganalisis respons struktral yang terjadi berupa regangan horisontal dan vertikal, komponen utama dalam menghitung nilai repetisi izin terhadap kerusakan fatik (Nf) dan retak alur (Nd), diolah menggunakan program KENPAVE. Selanjutnya dibandingkan hasil perhitungan tebal perkerasan lentur, nilai repetisi izin terhadap kerusakan fatik (Nf) dan kerusakan retak alur (Nd) dari ketiga metode tersebut. Metode yang digunakan mekanistik-empiris. Data primer didapat dari Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR) dan LHR0 dimulai pada tahun 2020, memperhitungkan pertumbuhan lalu lintas dari tahun 2020 sampai 2035, serta data sekunder asumsi dengan tetap mengacu pada peraturan dan penelitian sebelumnya. Hasil penelitian ini menunjukkan bahwa metode 2002 menghasilkan tebal perkerasan terbesar, sedangkan metode 2013 dan 2017 menghasilkan tebal perkerasan yang relatif sama. Namun metode 2002 menghasilkan repetisi izin terhadap kerusakan fatik (Nf) dan retak alur (Nd) terbesar. Sehingga disimpulkan metode 2017 menghasilkan desain lebih baik.


Notaire ◽  
2021 ◽  
Vol 4 (3) ◽  
pp. 399
Author(s):  
Nahdlotul Fadilah

Developer as seller and/or marketing agency often promising everything to buyers related to the flats settlement process, can be regulated in Sale and Purchase Engagement Agreement (hereinafter referred as “PPJB”) accordance with Article 43 of Law Number 20 of 2011 concerning Flats (hereinafter referred as “Flat Law”) and Regulation of Minister of Public Works and Public Housing Number 11/PRT/M/2019 concerning the Preliminary House Sale and Purchase Agreement System (hereinafter referred as “Ministerial Regulation of PUPR No. 11/PRT/M/2019”). The purpose of this research is to analyse the basis of validity of the Akta Pemberian Hak Tanggungan (Security Title Provision Deed, hereinafter referred as “APHT”) on the Building Rights Certificate of the Flats (hereinafter referred as “HGB”) after the PPJB has been implemented, and to analyse legal protection for buyers when the certificate of HGB is guaranteed after PPJB is carried out. The research has been determined that PPJB has classified as a conditional engagement because it has regulated the points of the agreement and has a legal consequences. The seller/developer who will enact the object of PPJB as a guarantee, basis of validity an APHT at certificate of HGB’s Flats after regulated a PPJB have to qualify Article 11 of UUHT and pay attention to the provisions of Article 10 paragraph (3) alphabet d of Ministerial Regulation of PUPR No. 11/PRT/M/2019. Legal protection for buyers is a preventive legal protection and repressive legal protection.Keywords: Validity an APHT; Certificate of HGB’s Flat; PPJB; Legal Protection for Buyers.Developer sebagai penjual dan/atau agen pemasaran sering kali menjanjikan segala sesuatu kepada pembeli terkait proses penyelesaian rumah susun, dituangkan dalam perjanjian pengikatan jual beli (PPJB) sesuai Pasal 43 Undang-Undang Nomor 20 Tahun 2011 tentang Rumah Susun (UU Rumah Susun) dan Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 11/PRT/M/2019 tentang Sistem Perjanjian Pendahuluan Jual Beli Rumah (Permen PUPR No. 11/PRT/M/2019). Penelitian ini bertujuan untuk menganalisis dasar keabsahan akta pemberian hak tanggungan (APHT) atas sertipikat hak guna bangunan (HGB) pada rumah susun yang telah dilakukan PPJB dan menganalisis bentuk perlindungan hukum bagi pembeli apabila sertipikat HGB pada rumah susun dijaminkan setelah dilakukan PPJB. Dalam penelitian ini ditemukan bahwa PPJB digolongkan sebagai perjanjian bersyarat karena sudah menyentuh pokok-pokok perjanjian dan telah menimbulkan akibat hukum. Penjual/developer yang akan menjadikan objek PPJB sebagai jaminan, dasar keabsahan pembuatan APHT atas sertipikat HGB pada rumah susun yang telah dilakukan PPJB harus memenuhi ketentuan Pasal 11 UUHT dan memperhatikan ketentuan Pasal 10 ayat (3) huruf d Permen PUPR No. 11/PRT/M/2019. Bentuk perlindungan hukum bagi pembeli satuan rumah susun dapat berupa perlindungan hukum preventif dan perlindungan hukum represif.Kata Kunci: Keabsahan APHT; Sertipikat HGB Pada Rumah Susun; PPJB; Perlindungan Hukum Pembeli.


Author(s):  
Lisna Rahayu ◽  
Desiree Marlyn Kipuw ◽  

Most studies assume that road development will improve the economy in the region, as reflected by an increase in Gross Domestic Product (GDP). However, GDP is macro in nature and tends to be biased if we ask who benefits from its increase. To identify whether road development has a positive correlation with the improvement of local economy, hence this study was conducted in a micro context by taking the development of the Soroja Toll Road in Indonesia as a case study. With a length of 10.57 km, connecting Bandung Regency and Bandung City, the newly constructed Soroja Toll Road has a strategic function in supporting activities in the Bandung Metropolitan Area (BMA) and is predicted giving implication on increasing Small and Medium Enterprises (SMEs) profit surrounding its corridor. However, a toll road cannot entirely be seen as a public goods, because not all people have access to this type of infrastructure. Only the users of four-wheeled vehicles and those who can afford to pay the toll charge can access the toll road. This study was aimed at identifying the correlation between the developments of the Soroja Toll Road with the improvement of local economy (SMEs) in its surrounding areas. Based on the analysis result, this study indicates that the presence of the Soroja Toll Road had a bigger positive correlation with the increased profit of medium-sized industries than small-sized industries due to their ability to capture a broader market.


2018 ◽  
Vol 10 (4) ◽  
pp. 1191 ◽  
Author(s):  
Chun-Chu Yeh ◽  
Cheng-Shen Lin ◽  
Chin-Huang Huang

2021 ◽  
Vol 12 (1) ◽  
pp. 35-42
Author(s):  
Piski Sundari ◽  
Wella Wella

Pusdatin of the Ministry of Public Works and Public Housing is an institution that manages data and information to support management within the ministry of public works. This research was conducted to evaluate the maturity of agencies prior to conducting an external audit of ISO 27001: 2013 certification. The method used in this research is PDCA (Plan-Do-Check-Act) using our index and ISO 27001, the technicality of this research starts from a check for analysis of current conditions, Act is carried out for assessment of the WE index, Plan compares our index results with ISO 27001, and Do control recommendations for improvement. The results of this evaluation show that PUSDATIN stopped at level I + in yellow area and overall PUSDATIN stated, "Needs improvement". In conclusion, Pusdatin is not ready for an external audit of ISO 27001: 2013 certification. The aforementioned results form the basis for the recommendations made from the findings of the WE index and compared with the ISO 27001 control.   Index Terms—audit keamanan informasi; indeks KAMI; ISO 27001:2013; tingkat kematangan SMKI


2019 ◽  
Vol 24 (1) ◽  
pp. 47
Author(s):  
Farouq Khoirul Izza ◽  
Muhammad Ariya Praditama ◽  
Claudia Nimas Kirana ◽  
Karnawan Joko Setyono ◽  
Sudarmono Sudarmono

<em><span>The Semarang-Solo Toll Road Project for the Salatiga-Kartasura Section is one part of the Trans Java toll road development project, one of the jobs in the form of an erection girder with the method used, namely the Crane and Launcher methods. The purpose of this study is to compare the completion time between Crane and Launcher Methods with field studies and analysis. Stages of research include literature studies, primary data collection in the form of variable time of completion and secondary data then analyzed by comparing the completion time of the second method of erection girder on girder with a span of 20.8 meters and 40.8 meters. The results of the comparison of completion time were obtained on a 20.8 meter span erection girder seen from the shortest time Crane Method was more efficient 61.44% than the Launcher Method, the longest time Crane Method was more efficient 32.13% of the Launcher Method, and Method average time Crane is more efficient 52.15% than the Launcher Method. Then on the span erection girder 40.8 m seen from the shortest time Crane Method is more efficient 61.48% than the Launcher Method, the longest time Crane Method is more efficient 29.82% than the Launcher Method, and the average time of the Crane Method is more efficient 41, 81% of the Launcher Method.</span></em>


2021 ◽  
Vol 3 (2) ◽  
pp. 187-197
Author(s):  
Susiyanti Meilina ◽  
Ari Argonanto

One of the efforts to support the management of archives in the field of the General Bureau at the Secretariat General of the Ministry of Public Works and Public Housing of West Sumatra is to create an archival application system that can be operated via a computer network, with the aim of increasing the acceleration of the search service process for an archive. This research is: 1) To find out what are the obstacles faced in the archive management system in the General Bureau at the Secretariat General of the Ministry of Public Works and Public Housing of West Sumatra; 2) To find out what are the efforts made to overcome the obstacles in the archive management system in the field of the General Bureau at the Secretariat General of the Ministry of Public Works and Public Housing of West Sumatra; 3) To find out what are the efforts made to overcome the obstacles in the archive management system in the field of the General Bureau at the Secretariat General of the Ministry of Public Works and Public Housing of West Sumatra. This type of research is qualitative research. Qualitative research is research that intends to understand the phenomena experienced by research subjects (such as behavior, perception, action, etc.), holistically, and by means of descriptions in the form of words and language, in a specific natural and natural context. by utilizing various natural methods (Moleong, 2012;: 87). Informants are people who are used to provide information about the situation and conditions of the research background. So he continues to have a lot of experience in the research setting. As a team member with kindness, volunteering can provide views of values, attitudes and culture, which are the background for local research (Moleong; 2012: 90). The types of data are primary data and secondary data collected through interviews, observation and library research. The analysis technique used is qualitative analysis. The results of this study indicate that: recording or distribution of archives in the General Bureau of the Secretariat General of the Ministry of Public Works and Public Housing of West Sumatra Province uses several types, namely the Electronic Service Manuscript System (TNDE) and the outgoing mail agenda book. The conclusion that can be drawn is the dynamic archive management system in the field of the General Bureau at the Secretariat General of the Ministry of Public Works and Public Housing of West Sumatra Province in the aspects of creating and receiving archives, storing, maintaining, and shrinking, namely: in terms of creating and receiving archives, they have followed the existing archival provisions The most frequently created and received dynamic archives are correspondence records (letters). The archive storage system used at the General Bureau is the Electronic Service Manuscript Administration (TNDE) system. This TNDE system is so that letter data will be stored in a centralized database management system, making it easy to maintain data. The search for the TNDE system cannot be done automatically in the access feature in the system. For archival maintenance, the implementation of fumigation is carried out twice every year. In the context of shrinking the archives, there is an alternating dynamic archive assessment team. Archive shrinkage is in accordance with the Archive Retention Schedule (JRA), archives that have passed JRA will be immediately destroyed by burning. Suggestions include the implementation of a good archive management system at the Secretariat General of the Ministry of Public Works and Public Housing of West Sumatra, it should be equipped with supporting facilities and infrastructure.


2019 ◽  
Vol 1 (1) ◽  
pp. 45-68
Author(s):  
Fitri Handayani ◽  
Rahman Ambo Masse ◽  
Sunuwati Sunuwati

This study discusses the implementation of murabahah contracts on mortgage financing in the Parepare Islamic state savings bank. That the BTN Syariah bank is a unit of conventional Bank BTN which raises doubts about mortgage financing, whether or not it has implemented murabahah contracts in mortgage financing or not. As recommended by the DSN fatwa and Indonesian banks. This study aims to determine the implementation of the murabahah contract on mortgage financing at the Parepare Syariah State Savings Bank. The results of this study indicate that: (1) the financing mechanism for mortgages at Bank BTN Syariah Parepare is in accordance with the rules of banks and government, the rules governed by the government are the rules regarding subsidized mortgages stipulated in PermenPUPR Number 21 / PRT / M / 2016 concerning convenience and or assistance in obtaining houses for low income people. PermenPUPR Number 26 / PRT / M / 2016 concerning changes to the ministerial regulations on public works and public housing number 21 / PRT / M / 2016 and PermenPUPR Republic of Indonesia Number 425 / KPTS / M / 2015 concerning limits on house selling prices that can be obtained through credit or financing of prosperous home ownership. (2) Implementation of murabahah contract at BTN Syariah Parepare bank, terms and conditions are in accordance with the principle of murabahah contract, murabahah contract has not implemented well on mortgage products at BTN Syariah Parepare bank due to the existence of murabahah contract elements which are not in accordance with the fatwa of the board national sharia-MUI. The element of the murabahah contract that is not in accordance with the DSN-MUI fatwa is the down payment and rescheduling. The elements of the murabahah contract are in accordance with the DSN-MUI fatwa, namely discounts, settlement of accounts receivable, fines and accelerated repayments.