scholarly journals Prospects for the adoption of Agile Project Management techniques in Nigerian construction industry

2021 ◽  
Vol 40 (3) ◽  
pp. 357-362
Author(s):  
O.P. Esangbedo ◽  
D.E. Ealefoh

Persistent failure of construction projects to meet clients’ objectives has compelled a review of the extant systems for project delivery. This study assessed the prospect of adopting Agile Project Management (APM) for construction project delivery in Lagos State. To achieve this, the study examined the level of awareness of APM among construction stakeholders and developed a SWOT model for the adoption of APM technique for construction projects. The research adopted survey method using questionnaire. The study sample involved 196 construction stakeholders. Data obtained were analysed using Mean Score and Fussy Set Theory. The result showed that stakeholders’ level of awareness about the individual methodologies of APM is high. There are also weighty strengths, weaknesses, opportunities and threats in the adoption of APM in construction project delivery. The level of awareness among stakeholders portrays high prospects for APM adoption. However, there is need to embed trust, cooperation and improved team performance.

2018 ◽  
Vol 24 (7) ◽  
pp. 114
Author(s):  
Sawsan Rasheed Mohammed ◽  
Asmaa Jebur Jasim

The avoidance of failure in construction projects is not an easy task, which makes the failure of the construction project to achieve its objectives a major problem experienced by all countries in the world, especially Iraq. Where nearly two-thirds of the construction projects in the world have been suffered by significant problems as an increase in the cost of the project, delay in the specified duration for execution, and stopping the project. Therefore it is required to study and apply new methods for managing the construction project to ensure its success and achieve its objectives. The aim of this study is to study the Agile project management method and its impact on the construction project. In addition, to identify the values and principles of Agile project management, which can be applied in the Iraqi construction industry to be adopted it as a new method to manage the construction projects in Iraq. The researcher reviewed the relevant literature to define the method of Agile project management and its methods and impact on the construction project. Then, the researcher conducted a questionnaire survey of a sample of engineers' experts who work in four main parties in the construction project: (beneficiary, supervising, designer, and contractor). The results of this survey showed that it is possible to apply the four values of Agile project management for managing the Iraqi construction projects, and can apply eleven of the twelve principles of Agile project management for managing the Iraqi construction projects.  


2013 ◽  
Vol 684 ◽  
pp. 639-643 ◽  
Author(s):  
Alireza Ghaffari

The construction project is a complex sector which characterized with low productivity, cost and time overruns and conflicts. The major challenges in construction project risk assessment which may attributed to knowledge requirements for determining the level of uncertainty and development of complex models to predict . Portfolio theory and capital market theory stipulate that risk consists of two types, First, systematic risk, which cannot be controlled, emanates from external factors such as acts of God, natural disasters, market risk, interest-rate risk, and purchasing-power risk. Second, unsystematic risk, which can be controlled, relates to organization-specific factors such as business risk and financial risk (Fischer and Jordan 1996).) . To identifies the risk factors that influence the cost-effective management, operation, and maintenance of construction project, as well as how and when in the project life cycle the identified risk factors impact to the associated costs . The identification and design of risk is the first step of risk management. It contain the recognition of potential risk event conditions in a project and the clarification of risk responsibilities. A total of 50 risk factors on construction for stake holders (client , contractor ,consultant ) share projects were identified after conducting an extensive literature survey. A questionnaire survey was conducted from 60 project managers(20 from each category) in all three proficiencies with background experience in buildings ,road and bridges with minimum 15 years experience , to identify the most significant risk factors impact in construction projects . Interviews were conducted face to face, ensuring a 100 percent response rate. The questionnaire was amended by incorporating feedback of the experts to suit the local environments of the construction industry. The weight or rate of each risk factor gained by using a five-point Liker scale from a consolidated conceptual framework of all 50 risk factors identified from the deep literature work . The main aim of these research is to identify ,categorize and ranking common risks, exert management techniques to address those risks , effective risk management and risk status in the construction industry and to help stakeholders to take stock of their ongoing and future projects, with a focus on important risks, their management techniques and barriers to effective implementation of risk management systems.


2017 ◽  
Vol 21 ◽  
pp. 587-595 ◽  
Author(s):  
Ion Șerbanoiu ◽  
Marina Verdeș ◽  
Adrian Alexandru Şerbănoiu ◽  
Bogdan Vasile Șerbanoiu ◽  
Mihaela Munteanu

The current trends in the construction industry, considering the magnitude and complexity of construction projects required the development of an appropriate methodology in the design, commissioning work and completion of works. The objective imposed creation of the "Office of Project Management" and all processes, tools and techniques of project management respects besides applicable standards and legislation construction, also imposed code of ethics and professional conduct of the PMI that guides practitioners professional project management, construction engineers, installers, architects etc. and describes the expectations that they have of themselves and of others.


2021 ◽  
Vol 19 (17) ◽  
Author(s):  
Yew-Hou Tung ◽  
Fah-Choy Chia ◽  
Felicia Yan-Yan Yong

Digital technologies have recently started to enter the construction industry, gradually changing how infrastructure, real estate and other built assets are designed, constructed, operated and maintained. Being among the least digitalized sectors, it is predicted that digital technologies will substantially increase the productivity, decrease the costs, and improve site safety of construction projects. Thus, the primary objective of this pilot study is to explore the usage of digital technologies for the 12 components of construction project management. A total of 32 respondents participated in the online survey. The results indicate that the usage of digital technologies was significantly higher in the management of scheduling, documenting, designing, and assigning costs. The aspects for digitalized safety, stakeholders, equipment, and materials are room for further improvement.


Author(s):  
Namhee Kang ◽  
Hyunjung Kim ◽  
Haekyung Im ◽  
Jaehyun Choi

The project management information system (PMIS) has recently been developed by using the IT technology in order to implement advanced information management technology to construction industry in Korea. The PMIS has been applied not only to domestic construction projects, but also to some overseas projects executed by Korean construction companies. This study was performed to develop the PMIS that is tailored to the US construction IT market. The US construction IT market has been monopolized by the US-based IT companies, but other companies are recently emerging with competitive technology and market strategy. As a preceding study, existing systems commercially available were analyzed, and the required features of the PMIS were identified by analyzing the core elements of contract, process and cost management for construction projects in the US. The PMIS then was developed based on the aforementioned analysis results. The system includes the document management module with an internal electronic approval system, the cost-plus-based automatic labor cost calculation module, and the progress management module to support the integrated project cost management. In addition, the functionality of the developed system was verified by construction project management experts in the US via questionnaire survey. The PMIS, which was developed in this study, is expected to be applied not only to the US construction IT market as a system specialized for the US construction industry, but also to other overseas markets in the future.


2012 ◽  
Vol 174-177 ◽  
pp. 2768-2773 ◽  
Author(s):  
M. Paranthaman Venkatesh ◽  
S. Muthalvan Renuka ◽  
C. Umarani

Delays in a construction project can be regarded as a failure. This paper aims to investigate the causes of delay in Indian construction projects undertaken by private, government and nongovernmental organizations. In view of this 45 causes of delay were identified and developed the questionnaire for the quantitative confirmation of the most causes of delay. Consequently the questionnaire was distributed to construction professionals like Managers, Engineers and others. Subsequently the collected data was analyzed using statistical tool and the factors were measured and ranked under each group by importance index for various construction professionals. The results suggest that delays are mainly due to shortage of labours, shortage of construction materials and extra works (rework and change orders). The resources like manpower and materials are having highest contribution of about 24% compared to other sources. However this paper presents recommendations for a better project management techniques & procedures which can be adopted during conceptual & detailed planning phases of the project in order to minimize the construction delay.


Author(s):  
Tomáš Mandičák ◽  
Peter Mesároš ◽  
Mária Kozlovská

Abstract The issue of cloud computing is a highly topical issue. Cloud computing represents a new model for information technology (IT) services based on the exploitation of Web (it represents a cloud) and other application platforms, as well as software as a service. In general, the exploitation of cloud computing in construction project management has several advantages, as demonstrated by several research reports. Currently, research quantifying the exploitation of cloud computing in the Slovak construction industry has not yet been carried out. The article discusses the issue of exploitation of cloud computing in construction project management in Slovakia. The main objective of the research is to confirm whether factors such as size of construction enterprise, owner of construction enterprise and participant of construction project have any impact on the exploitation level of cloud computing in construction project management. It includes confirmation of differences in use between different participants of the construction project or between construction enterprises broken down by size and shareholders.


Author(s):  
Lena Paar ◽  
Cornelia Ninaus ◽  
Detlef Heck

The importance of bringing contractor know-how into early construction project phases has long been recognized by the construction industry. Although experts and practitioners have considered new forms of procurement and management for construction projects, no significant solutions have been identified until now. It should be mentioned in this context that the Austrian government initiated the implementation of a new procurement approach in 2015 by reducing the opportunity for public clients to award the contract to the bid with the lowest price in conformity with the European guidelines. Austria's infrastructure industry is thus seeking new approaches that are able to implement the know-how of all parties involved in a project. The aim of this paper is to identify possibilities for early contractor involvement and its potential for optimizing the project management in the Austrian infrastructure industry.


Author(s):  
Ali Fathalizadeh ◽  
Parviz Ghoddousi ◽  
Ali Akbar Shirzadi Javid ◽  
M. Reza Hosseini ◽  
Arka Ghosh

This paper is an attempt to explore the barriers to integrating sustainability into construction project management in developing countries. To this end, a comprehensive review of the literature is conducted, as a result of which a list of 30 barriers is culled from existing studies. The list of barriers is subsequently assessed in terms of relative importance index (RII) through a survey questionnaire administered to Iranian construction industry experts, resulting in a dataset of 176 completed questionnaires. Findings bring to light the most influential barriers to incorporating sustainability in construction projects for a developing country. These were: (1) lack of understanding of the potential selfbenefits of proactivity and high economic risks that unsustainable practices may carry, (2) inadequate assessment of risks and a silo-based approach, namely, insufficient cooperation among practitioners, research institutions and environmental organisations and (3) the lack of a systematic approach to planning and acting for the fulfilment of sustainability goals. As one of the first studies in its kind, the paper offers invaluable insight for researchers, practitioners, and policy makers, in supporting the transition of construction project management practices towards fulfilling sustainable development goals.


2021 ◽  
Vol 2 (2) ◽  
Author(s):  
Yongjun Luo

The construction project serves as one of the most important projects in the construction industry. The high cost and the particularity in the implementation generate high risks in the investment and construction process. Over the years, the development of construction project management methods has promoted the management of risk factors. This paper reviews the suggestions of risk management of follow-up audit in construction stage and evaluates its application in construction projects.