scholarly journals Determining The Effects Of Awarding Lowest Bid Price System On The Construction Projects Of Ethiopian Southern Nation

2022 ◽  
Vol 24 (1) ◽  
pp. 253-260
Author(s):  
Ashenafi Reta ◽  
◽  
Ashebir Alyew ◽  

Identifying the effects of low bid award system in construction projects can be used as benchmark to find alternative method to low bid award system in the future of construction industry. The results of questioner survey conducted to determine the effects of awarding lowest bid award system in construction projects of Ethiopian southern nation are presented in this study. Personnel from consultants, owners and contractors are among the survey`s respondent. The result of the study outlines promote transparency, avoid fraud and corruption, promoting competition amongst contractors, excessive time overrun, compromise quality and hindering profitability of contractors as the top ranked effects of low bid award system. Construction industry participants have started recognizing that accepting the least price bid does not guarantee maximum value. Achieving a value-based procurement approach is a challenge, particularly for the Pakistani public sector clients, who are limited in their ability to evaluate the competitive bids based solely on the lowest-bid award system. Persisting problems of inferior quality of constructed facilities, high incidence of claims and litigation, and frequent cost and schedule overruns have become the main features of public construction works contracts. This research was undertaken to assess the performance of public owned construction projects awarded on a lowest bidder bid awarding system.

2018 ◽  
Vol 44 ◽  
pp. 00057
Author(s):  
Xeniya Malinina ◽  
Juriy Shamara ◽  
Zhanna Petukhova

In this article we carry out the analysis of the possible directions and consequences of transformations of the existing models for implementation of investment-construction projects in relation with integration of information technologies and the construction industry in modern Russia. Such integration is considered as the most useful tool to solve such chronicle problems of the construction industry as low quality of works, missed deadlines and sustaining the best ratio “price-quality” for the customer. The basis for such integration is the technologies of informational modeling of construction objects. We investigated two basic models: disintegrated purchases and integrated purchases whose transformation will be directed towards development of mechanisms of partnership between participants of investment-construction projects, expanded use of “integrated” contracts in the system of state purchases of construction works and further centralization of control in the system of construction for state purposes.


2018 ◽  
Vol 27 (3) ◽  
pp. 377-386
Author(s):  
Jarosław Górecki ◽  
Jadwiga Bizon-Górecka ◽  
Przemysław Nadolny

The article indicates that a role and tasks of particular participants of construction projects vary depending on the phase of construction production. The influence of individual entities on the quality of construction production is also diversified. The results of the questionnaire survey conducted among 64 employees of construction companies involved in the implementation of construction projects were presented. They show the opinions of respondents representing the construction industry about a role of participants of the construction process in maintaining the proper quality of construction works. Their impact on the compliance of construction processes with applicable legal regulations was emphasized. The declarations may cover PN/EN standards, Polish construction law, technical specification of performance and acceptance of construction works and other formal and legal requirements and construction production standards.


2021 ◽  
Vol 13 (11) ◽  
pp. 5795
Author(s):  
Sławomir Biruk ◽  
Łukasz Rzepecki

Reducing the duration of construction works requires additional organizational measures, such as selecting construction methods that assure a shorter realization time, engaging additional resources, working overtime, or allowing construction works to be performed simultaneously in the same working units. The simultaneous work of crews may affect the quality of works and the efficiency of construction processes. This article presents a simulation model aimed at assessing the impact of the overlap period on the extension of the working time of the crews and the reduction of a repetitive project’s duration in random conditions. The purpose of simulation studies is to provide construction managers with guidelines when deciding on the dates of starting the sequential technological process lines realized by specialized working crews, for sustainable scheduling and organization of construction projects.


Author(s):  
Peter Dodzi Kwasi Agbaxode ◽  
Sitsabo Dlamini ◽  
Ehsan Saghatforoush

A meta-synthesis approach was used to identify, synthesize, and categorize appropriately factors in the literature that contribute to design documentation quality. The categories include factors on quality attributes, quality indicators, and quality-influencing factors. Findings indicate that the quality of design documentation in practice is unsatisfactory, therefore, there is a need for collaboration between the owner, designers, and end-users to improve design documentation quality. The results offer pragmatic data on design documentation quality in the construction industry between the years 1992 and 2019. However, further research on the significant impacts of poor-quality design documentation on construction projects is recommended.


2020 ◽  
Vol 9 (1) ◽  
pp. 1
Author(s):  
Qian Yang

<p>With the rapid development of social economy, the demand for new energy is also increasing, and then the problem of large consumption also has a negative impact on the development of the construction industry. Under the concept of green building, the design and construction units pay more attention to energy conservation and environmental protection, so they actively use photovoltaic new energy in the field of electrical energy conservation of construction projects, so as to improve people's quality of life. Starting from the principles and characteristics of building electrical energy conservation, this paper discusses the methods of building electrical energy conservation, and analyzes how to use photovoltaic new energy in the field of building electrical energy conservation, hoping to better practice the concept of energy conservation.</p>


2021 ◽  
Vol 2 (4) ◽  
Author(s):  
Mansur Hamma-adama ◽  
◽  
Abdul-Basit Sa’eed Ahmad ◽  

Construction Industry is evolving amid the fourth industrial revolution. Transportation, commerce, manufacturing and many other industries ripened the current technological advancement and are striving to utilise every development in the IT sector. The procurement of construction works is known to be very conventional and backward in the adoption of digitalisation. The construction industry's procurement and supply chain are blamed for the most inflated cost of construction projects, mainly attributed to a lack of transparency and trust between the industry stakeholders. This research explores the challenges of E-procurement adoption in the industry and identifies the potential opportunities for its usage. This investigation's data are acquired through interviews, and the data are analysed using qualitative content analysis. This study reveals compounding challenges (i.e., corruption and lack of commitment) that lead to the failure of such efforts in Nigeria and the potential prospects (i.e., transparency and efficiency). This study is essential in developing a more effective and transparent process of procurement so that the Nigerian construction industry is not be left behind in the fast-digitalising markets.


Author(s):  
K. Annapurna ◽  
B. Seetha Ramanjaneyulu

Satisfying the Quality of Service (QoS) is often a challenge in cognitive radio networks, because they depend on opportunistic channel accessing. In this context, appropriate pricing of vacant channels that is linked to the preference in their allocation, is found to be useful. However, ambiguity on the possible price at which the channel would be allotted is still a concern. In this work, an auction mechanism in which maximum value of the bid is predefined is proposed. With this, users quote their bid values as per their needs of getting the channels, up to the predefined maximum allowed bid price. However, final price of allocation is decided based on the sum total demand from all the users and the availability of vacant channels. Performance of the system is found in terms of blocking probabilities of secondary users and revenues to primary users. The proposed system is found to yield similar quantum of revenues as that of the Generalized Second Price (GSP) auction, while offering much lesser blocking probabilities to high-priority users to satisfy their QoS requirements.


2017 ◽  
Vol 5 (1) ◽  
Author(s):  
I Gde Eka Dharsika ◽  
IN Budiartha ◽  
I W Yansen

Abstract: Problems in construction projects caused by the extension of working time and an increase in labor costs. A limited ability of project management contribute to the decline in the quality of project work. The quality of project manager has an important role to smooth a construction project. Dedication in this profession requires project managers to carry out the work going according to plan. Analyzing the quality of the project manager for the implementation of construction projectsis one wayto measure the quality of a project. It needs  a right measurements way to providean accurate assessment of qualified and reliable project managers. This study aimed to obtain and analyze the factors that affect the quality of the project manager and its to construction projects.This used a sample of 45 respondents from several construction projects in the area of Badung and Denpasar during the period 2007-2012. The method used in this study is the method of multiple linear regression analysis by testing for the F-test and t-test. The results found 8 dominant factor that has a value eigen values??> 1. Sequentially, the factors that have been named are experience 41.63%,  education 9.278%, knowledge 7.240%, ability 5.088%, character 4.047%, network 3.843%, relationship communication 3.550%, confidence 3.357%. Influence the quality of the project manager on the performance fee of 51.9%, against 43.1% for quality performance, on-time performance, with a value of 57.9%. The results of this study prove that the powerful influence between the quality of the construction project manager to the implementation of construction projects.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benti Gadisa ◽  
Hong Zhou

PurposeIt is well recognized that the construction industry is characterised by inefficient and ineffective service delivery due to various causative factors. Thus this study aims to examine the influential factors affecting public construction project performance in Ethiopia to improve the industry's service delivery.Design/methodology/approachFrom the extensive literature reviewed, 58 potential factors affecting construction project performance have been compiled. Based on the evidence accumulated, the conceptual model of this paper has been developed. By using survey questionnaires, valuable data were collected from the construction industry professionals in Ethiopia; analysed and interpreted with the use of both SPSS and AMOS software.FindingsIt is concluded that failure factors related to the “performance” of the contractor, the “capability” of the owner, the “project design-procurement process,” and project contract management can significantly contribute to the poor performance of public construction projects in Ethiopia. Ten key factors include inadequate contractor capacity, weak project site management and supervision, weak project management skills and capabilities of the owner, additional work orders, delayed payment, lack of comprehensive project plans between parties and incomplete project design, rising material prices, ineffective project schedules, and cost management, rising market prices and devaluation of the currency.Research limitations/implicationsThe scope of this study confined to public projects in Ethiopia. It suggests that further research needs to consider public and private construction from a comprehensive perspective in the developing countries.Practical implicationsIt provides practitioners with information and guidance on the factors that affect the performance of construction projects.Originality/valueIt provides inclusive evidence related to many factors that affect the performance of public construction projects.