scholarly journals The Need for Enterprise Project Management Tools Use in Transnational Enterprises – a Case Study

2015 ◽  
Vol 13 (52) ◽  
pp. 228-239
Author(s):  
Krzysztof Redlarski
2020 ◽  
Vol 1 (1) ◽  
pp. 35-50
Author(s):  
Irfan Uzzaman ◽  
Tasminur Mannan Adnan

Author(s):  
Rabia Imtiaz Durrani ◽  
Zainab Durrani

This chapter focuses on the use of project management tools, techniques, and software in projects. The chapter includes a detailed discussion on the use of information communication technology within projects and provides a tour of the software and project management methodologies used to deploy projects. To contextualize the discussion, a case study of four startup projects hosted by two different incubation centers is presented. The case study discussion is structured around four themes: financial aspects, family support, legal perspective, and project success and failure. Findings from the cases are then compared against the literature reviewed; finally, the chapter concludes by providing recommendations. However, the result divulges there is no proper mechanism that encompasses the use of project management software.


2018 ◽  
Vol 3 (5) ◽  
pp. 174-187
Author(s):  
Said Abujudeh

The improvement of the project management forced the industrial organizations to focus on using the project management techniques in their industry, to plan and control the workflow to achieve their targets, further to increase the satisfaction of their customers. One of the most common project management tools are used is the work breakdown structure (WBS), which provide a framework for the implementation of the project scope including project planning, scheduling, monitoring, control, and estimation. Depending on the top-down approach the project activities will be broken into smaller parts that can be measured and controlled during the project implementation. The well-defined construction of the structure contributes to making the project more realistic and visual. However, the misunderstanding of the project WBS among the project team creates deflection and misinterpretation of the project scope. The main issue of this research is to improve the WBS of the installation plan and develop a standard WBS for plant installation. The research was limited to Asphalt plant installation WBS as a case study to identify the weaknesses of the current WBS at the case company which leads to extra installation time and cost. The research is offering a template WBS based on the company logic, defining the frequent risks that affect the plant installation based on the WBS and suggesting a suitable response strategy by recommending a control framework to monitor and control the WBS schedule throughout all installation phases.


2021 ◽  
Vol 22 (1) ◽  
pp. 41-67
Author(s):  
Dominika Treit ◽  
Kamila Hyska

Implementation of Project Management Tools to the Exhibition Organization Process. Case Study of the National Museum in Krakow (2016–2019) How to thoroughly improve the process of organizing exhibitions in a cultural institution? Is project management in a museum possible? How to implement new tools? What to do after initiating a change? This article provides answers to these questions through a case study prepared by the Head of the Exhibition Organization Department and the Head of the Coordinators Section of the National Museum in Krakow, directly responsible for the exhibition organization process. The article describes the events from 2016 to 2019. This includes an audit of the existing process of exhibition organization, implementation of corrective measures, introduction of new tools, their updating and verification, taking into account such solutions as treating the exhibition as a project, PRINCE2 and Scrum methods, a detailed description of the process, and creating standardized templates of project documents, i.e. a list of objects, project charter, project schedule, partial schedule, project budget, evaluation. These activities resulted in the improvement of team cooperation, the elimination of avoidable delays, the automation and acceleration of the process of preparing project documentation, making the obligations of individual team members public, submitting project data to the stakeholders of a given project on an ongoing basis, reducing the amount of manual work, and reducing the cost of the implementation of individual projects.


2016 ◽  
Vol 8 (4) ◽  
Author(s):  
Mohammad-Reza Nejadmoghaddam ◽  
Abdolreza Babamahmoodi ◽  
Arash Minai-Tehrani ◽  
Amir-Hassan Zarnani ◽  
Rassoul Dinarvand

AbstractPotential human health and environmental risks associated with nanoscience research projects and their deliverables, termed nanosafety, is one of the important issues for translating research findings into commercially viable products. This paper examined the applicability of project management tools to address nanosafety in an efficient manner. Using objectives oriented project planning (OOPP) we describe a new integrated content of the problem tree, the result tree, and the logical framework approach (LFA), by modeling our nanomedicine research project entitled “Nanomedicine preparation based on antibody drug conjugate (ADC)” as a case study. As a main result of the case study, we demonstrated an LFA matrix that highlights the need to deal with nanosafety as an activity of the research project. Consequently, the activity can lead to the output, standing operating procedure (SOP), for managing the project waste disposals and its deliverables side effects. In general, such output can be concluded as an important output for all nanoscience research projects to avoid underestimating risks for their nano-objects. Moreover, this article is written in the hope of providing an easy-to-understand template of project management tools for novice nanomedicine researchers who aim to apply OOPP in the design of their research projects.


2021 ◽  
Vol 13 (3) ◽  
pp. 1490
Author(s):  
Agustín Moya-Colorado ◽  
Nina León-Bolaños ◽  
José L. Yagüe-Blanco

Project management is an autonomous discipline that is applied to a huge diversity of activity sectors and that has evolved enormously over the last decades. International Development Cooperation has incorporated some of this discipline’s tools into its professional practice, but many gaps remain. This article analyzes donor agencies’ project management approaches in their funding mechanisms for projects implemented by non-governmental organizations. As case study, we look at the Spanish decentralized donor agencies (Spanish autonomous communities). The analysis uses the PM2 project management methodology of the European Commission, as comparison framework, to assess and systematize the documentation, requirements, and project management tools that non-governmental organizations need to use and fulfill as a condition to access these donors’ project funding mechanisms. The analysis shows coincidence across donors in the priority given to project management areas linked to the iron triangle (scope, cost, and time) while other areas are mainly left unattended. The analysis also identifies industry-specific elements of interest (such as the UN Sustainable Development Goals) that need to be incorporated into project management practice in this field. The use of PM2 as benchmark provides a clear vision of the project management areas that donors could address to better support their non-governmental organization-implemented projects.


Mathematics ◽  
2021 ◽  
Vol 9 (14) ◽  
pp. 1633
Author(s):  
Zhiwu Zhou ◽  
Julián Alcalá ◽  
Víctor Yepes

The aim of this paper is to establish an international framework for sustainable project management in engineering, to make up the lack of research in this field, and to propose a scientific theoretical basis for the establishment of a new project management system. The article adopts literature review, mathematical programming algorithm and case study as the research method. The literature review applied the visual clustering research method and analyzed the results of 21-year research in this field. As a result, the project management system was found to have defects and deficiencies. A mathematical model was established to analyze the composition and elements of the optimized international project management system. The case study research selected large bridges for analysis and verified the superiority and practicability of the theoretical system. Thus, the goal of sustainable development of bridges was achieved. The value of this re-search lies in establishing a comprehensive international project management system model; truly integrating sustainable development with project management; providing new research frames and management models to promote the sustainable development of the construction industry.


2018 ◽  
Vol 34 (2) ◽  
pp. 117-136 ◽  
Author(s):  
A. Miller

Purpose The purpose of this paper is to offer and explore innovative strategies for building and sustaining digital initiatives at information organizations. Although the examples provided are based on case studies at an academic library, the practices are rooted in project management principles and therefore applicable to all library types, museums, archives and other information organizations. The innovative strategies on staffing and funding will be particularly useful to organizations faced with monetary and staffing shortages and highlights collaborative management practices. Design/methodology/approach Concept of strategic and collaborative management practices led by an experienced project manager cross-trained in management, technical and soft skills enables the successful development and sustainability of digital initiatives. A cross-trained librarian’s management practices of leading the Digital Scholarship Initiatives at a particular university will be examined as a case study and aided with literature supporting the need for digital initiatives leaders to have training beyond the credentials of librarian, curator, archivist or historian in the technologically savvy twenty-first century ecology of information centers. Findings The innovative strategies implemented in the case study yielded increases in the number of hours of digital lab usage, digital projects developed, seminars or workshops presented, attendance of library hosted events, number of programs implemented and awareness on campus, all with limited staff and funding. The variety and level of production and marketing is instrumental to the growth and sustainability of digital initiatives. Practical implications The innovative strategies emphasized in this paper use the concept of borrowed or shared time to start staffing needs and is particularly helpful to organizations that do not have a strong line of dedicated staffing or funding to begin building digital initiatives. Offers small ways to start immediately while setting the stage to plan for big ideas for the future. Originality/value This paper suggests a credentialed information expert, such as a librarian, archivist or curator, that is, also cross-trained in project management and technology is the key to not only successfully leading digital initiatives but is instrumental for its sustainability and the marketing, growth and future of digital initiatives.


Sign in / Sign up

Export Citation Format

Share Document