Analysis of Critical Factors Affecting Labor Productivity of Construction Projects in Himachal Pradesh

Author(s):  
Kaushal Kumar ◽  
Rishi Rana
Author(s):  
Zain Ghazi Al-Kofahi ◽  
Amirsaman Mahdavian ◽  
Amr Oloufa

It is vital to investigate the system dynamics (SD) between the change orders and labor productivity to identify the causes of the productivity loss of the construction projects. Most productivity loss studies were financed from the contractor’s part and rely on the contractor’s data. This research highlighted the problem of productivity loss resulting from issuance of a change order by utilizing a previously developed SD model. It conducted a sensitivity analysis to evaluate the impact of overtime, overmanning, temperature and learning on the behavior of the SD model quantifying change orders' impact on labor productivity. Based on the results, SD provides more reliable results comparing with the measured mile analysis (MMA) approach for the compensation request, considering the leading factors affecting the productivity loss other than the change order. The model developed in this study can accept or reject the responsibility of a change order for occurrence of productivity loss.


2016 ◽  
Vol 7 (2) ◽  
pp. 82 ◽  
Author(s):  
Gwahula Raphael ◽  
Augustine Wittonde Phillip

The study objective was “An assessment of critical factors affecting quality performance of government financed construction projects in Tanzania”. The study was initiated as much of government financed construction projects are executed with variations on delivering time, cost and quality. The study identified factors if not considered can lead to poor quality performance of projects. Closed end questionnaire consisting of 20 performance factors were issued to 80 respondents dealing with construction related activities, they were required to rank them on a 5 point Likert scale. Data analysis was done using Statistical Package for Social Sciences version 16 (SPSS). The findings revealed that the critical factors that have direct impact on quality performance of government financed construction projects are; project financing processes, experience of contractors in construction industry, project technology, availability of plant and equipment, procurement system and processes as well as the project manager knowledge and skills. A multiple regression model developed showed a positive linear relationship between project quality performance and the critical quality performance factors. All the critical quality performance factors had positive coefficients with an acceptable level of significance. The study recommends further studies on the economic and social factors that hinder women participation in construction relation activities and how training and learning opportunities for continuous improvement will have positive impact on the performance of construction projects.


2020 ◽  
Vol 1 (1) ◽  
pp. 32
Author(s):  
Alva Yuventus Lukas ◽  
Jusuf Wilson Meynerd Rafael

The purpose of this study is to determine the resource management factors that affect labor productivity as well as the dominant factors, with research sites on construction projects in eastern Indonesia, particularly in East Nusa Tenggara. This research is aimed at construction workers, such as masons, chief craftsmen, foremen, and workers. This study uses a survey method. Primary data were collected through a questionnaire, then formulated and processed. Data processing in the form of respondents' opinions and attitudes towards problems that exist in construction projects related to productivity, data analysis techniques use factor analysis methods and multiple linear regression analysis with the SPSS statistical program. Results of processing and discussion of data, it is found that : (A) Human Resource Management Factors that affect Labor Productivity in several construction projects in East Nusa Tenggara are About Age, X1, about Work Experience, X2, Level of Education, X3,  about Wages, X4, Total Family Count, X5, Working Health and Safety, X6, Relationship Workers, X7, about Managerial, X8, and about Influential Motivations, X9, together form the equation Y = 12,776 – 0,217.X1 + 0,151.X2 – 0,087.X3 - 0,074.X4 - 0,263.X5 - 0,468X6 - 0,058.X7 + 0,129.X8 + 0,384.X9 .    (B)  The dominant factors affecting respectively are the Occupational Health & Safety of Workers, X6, Subject to the Number of Dependents in the Family, X5, and Subjects of Motivation, X9.


Author(s):  
Abdul Qadir Memon ◽  
◽  
Aftab Hameed Memon ◽  
Mohsin Ali Soomro ◽  
◽  
...  

This paper assessed the occurrence and severity level of various factors causing time and cost overrun in construction projects of Pakistan. Investigation was carried out through questionnaire form prepared based on 55 common factors identified from literature. Survey was done amongst the representatives of the contractors involved in handling construction activities in Pakistan. A total of 46 responses gathered against 100 distributed forms were analysed statistically. The results obtained from the analyses based on Average Index values revealed that delay in obtaining permits from the governmental agencies, financial difficulties are common issue faced in construction works of Pakistan. The study also revealed that high cost of machinery & its maintenance, inadequate planning & scheduling and slow information flow between parties have significant effect on time overrun cost while critical factors affecting cost overrun are high cost of machinery & its maintenance, unsuitable construction methods and lack of experience of contractors in affecting project cost. The findings of this study will be helpful for the practitioner in planning for achieving timely completion of the projects and also within the estimated cost.


2021 ◽  
Vol 6 (2) ◽  
pp. 074-089
Author(s):  
Emer Tucay Quezon ◽  
Arthur G. Ibanez

In highway construction projects, labor-oriented work is an integral part of the management process, requiring analysis of factors affecting labor productivity during Covid-19 pandemic. This research identified 53 influential factors affecting construction labor productivity at selected cities and towns in Cagayan Valley Region, Philippines. Due to the pandemic, the construction industries incurred substantial profit losses. More so, the construction workers are too much affected because of the Enhance Community Quarantine (ECQ) imposed by the local government. Results indicated there was laxity on the Covid-19 protocols. No health worker in the project site ranked the highest in the health & safety factor group with an RII of 0.97 and ranked 1st among 53 factors on the different groups. Besides, no safety engineer was assigned to the projects and ranked 2nd with an RII of 0.93. Among the 7 groups of factors, the health and safety group ranked 1st with 0.81, followed by the schedule compression group with an RII of 0.78. Hence, these two groups of factors have a strong relationship, as evidenced by number of workers reduced. It was learned that the contractors’ strategy was to increase the number of working days to cope with their schedules. Hypothesis testing supported that there are various significant factors influencing labor productivity loss during the Covid-19 pandemic, as suggested by more than 50% of the respondents.


2019 ◽  
Vol 18 (3) ◽  
pp. 531-556
Author(s):  
Djoen San Santoso ◽  
Polwatta Gallage Madusha Piumal Gallage

Purpose This paper aims to analyse the factors affecting the performance of large construction projects in Sri Lanka. The causes, impacts and mitigations in association with the critical factors are explored and discussed. Design/methodology/approach The research focuses on the evaluation and perspectives of clients and contractors of large projects in Sri Lanka. Combined quantitative and qualitative methods were applied in this research. Initially, a questionnaire survey was conducted with clients and contractors involved in large projects to evaluate the factors affecting the performance of projects and to identify the ten most critical factors. Interviews with the clients and contractors of three large projects were conducted to examine the causes and impacts of the critical factors and the approaches used to mitigate them. Findings Significant differences in the factors were observed for more than 40 per cent of the total factors under study, the contractors assigning more weight to most of the factors than the clients. The study identified nine internal factors and one external factor as the critical factors. Of these, seven were related to the contractors, which suggested that the contractors have greater roles in defining performance. Lack of management and technical skills of the parties involved, human capacity, lack of understanding and knowledge of the local context, changes in government policies and political interference were identified as significant causes of the critical factors. Originality/value The study analysed the factors affecting the performance of large projects in Sri Lanka, which, at the time of research, had just ended a 26-year-long civil war and was pushing the construction of large projects to be competitive. The challenges faced in this effort were explored as lessons learnt that might improve the efficiency and effectiveness of infrastructure development in Sri Lanka. The combined quantitative and qualitative methods applied in this study are expected to provide new insights in the project performance research, especially the interviews of the critical factors to gain an understanding on how the factors occurred and manifested themselves in real projects. The findings are, however, expected to be applicable to other developing countries that are currently aggressively developing their large infrastructure.


Buildings ◽  
2019 ◽  
Vol 9 (2) ◽  
pp. 33 ◽  
Author(s):  
Mohammad Alsaedi ◽  
Sadi Assaf ◽  
Mohammad Hassanain ◽  
Abdullatif Abdallah

One of the critical decisions taken by contractors is whether or not to bid for a project. This is due to the complexity and uncertainty surrounding this decision, which is influenced by many factors. Given the above challenge, this study aimed to uncover the critical factors affecting the contractors’ bidding decisions in Saudi Arabia-based construction projects. A questionnaire survey, which consisted of 31 factors, was distributed to first-, second- and third-grade contractors. In total, 67 responses were obtained. Median and relative importance index (RII) techniques were adopted for ranking the most critical factors. Based on the received responses, the top six critical factors were “size of the job”, “type of the job”, “company’s strength in the industry”, “designer/design quality”, “rate of return”, and “project cash flow”. The least significant factors were “job start time” and “labor environment (union/nonunion/cooperative)”. The findings of this study show a level of agreement among all contractors about the critical factors. The findings would benefit contractors and subcontractors by increasing their understanding of the major factors affecting the bidding decision process. Contractors armed with such valuable information will be better able to enhance their bidding decision-making process in terms of efficiency and effectiveness.


Author(s):  
Shumank Deep ◽  
Laura Simon ◽  
Mohd Asim ◽  
Ali Rahimzadeh ◽  
Sulala Al-Hamdani

Abstract Purpose: Recent studies show that lowest bidder tech­nique is mainly used in developing countries such as India to award a contract. It has been demonstrated that the lowest bid is not always the accurate one and can lead to cost overruns and time extensions amongst other prob­lems. The aim of this study was to investigate the critical factors impacting contractor’s efficiency in Indian con­struction projects. Research approach: A survey was sent to participants of construction projects awarded by the government with the lowest bidder technique in Uttar Pradesh, India. For further research, snowball sampling was used, and struc­tured interviews were conducted amongst experienced managers and engineers of these projects on both client’s and contractor’s side.Findings: It was observed that, to a greater extent, the delays were caused due to contractor’s opportunistic behaviour. The main findings are that new bidding meth­odologies are to be tested as they can lead to the choice of a more accurate and realistic bidder. In addition, subjec­tive evaluation components, such as schedule and work­force, should be reflected in contract award methods in addition to the cost criteria. Further studies should be per­formed on the choice of contract awarding methodology based on the project size and type. Originality value: The researcher’s focus was to analyze the influence of contracting methodologies and factors affecting contractor’s performance in lowest bid award project, where this is an area of least focus amongst researchers in the Indian subcontinent.