Microseismic Precursory Characteristics of Rock Burst Hazard in Mining Areas Near a Large Residual Coal Pillar: A Case Study from Xuzhuang Coal Mine, Xuzhou, China

2016 ◽  
Vol 49 (11) ◽  
pp. 4407-4422 ◽  
Author(s):  
An-ye Cao ◽  
Lin-ming Dou ◽  
Chang-bin Wang ◽  
Xiao-xiao Yao ◽  
Jing-yuan Dong ◽  
...  
2020 ◽  
Vol 2020 ◽  
pp. 1-20
Author(s):  
Wenkai Ru ◽  
Shanchao Hu ◽  
Jianguo Ning ◽  
Jun Wang ◽  
Qingheng Gu ◽  
...  

During the mining of the shallow-buried and close-distance multiple coal seam, the rheological failure of the surrounding weakly cemented soft rock of the roadway in the lower coal seam under the concentrated stress is very rare. However, the stress on the roof of the upper coal seam is transmitted down through the residual pillar, resulting in this situation. Taking the Gaojialiang coal mine which is located in the mining areas of western China as the research object, the failure mechanism of the roadway roof under the residual coal pillar in the shallow-buried and close-distance multiple seam is studied in combination with field monitoring and numerical simulation. Furthermore, suggestions on the roadway support under such geological conditions are proposed. The results show that the residual coal pillar in the working face of the lower coal seam gradually collapses during the mining of the shallow-buried and close-distance multiple coal seam. The concentrated stress transferred by the coal pillar increases further, which makes the roof stress of the lower coal seam roadway to increase continuously. In addition, the stress of the roadway roof also increases further due to the rotation of the broken rock above the goaf, and the peek region of stress moves to the nongoaf area. Combining the heavy concentrated stress and weakly cemented property, the shallow-buried surrounding rock shows rheological behavior and failure. Therefore, we must pay more attention on the creep failure of the roadway roof under the action of the residual coal pillar even in the shallow-buried coal seam.


Energies ◽  
2019 ◽  
Vol 12 (4) ◽  
pp. 628 ◽  
Author(s):  
Junwen Zhang

Split-level longwall gob-side entry (SLGE) has been applied as a special form of small gate pillar mining (or non-coal pillar mining) in thick coal seams. The stability of the coal pillar directly affects the rationality of the layout of the SLGE. Starting from the mining-induced influence around the SLGE, this paper compares the mechanical properties of coal under different mining effects, and studies the rationality of “zero pillar” location against the Xiegou coal mine. The study shows that the key to success of the application of the SLGE is the existence of an intact zone within the triangular coal pillar in spite of double disturbances due to tunneling and coal mining extraction. Laboratory testing shows that the density and uniaxial compressive strength of rock specimens obtained from the triangular coal pillar are smaller than that from the other part of the panel which is concluded to be due to the varied degree of mining-induced influence. The numerical modeling results show that most of the triangular coal pillar is intact after extraction of the panel, and that the peak stress is located in the solid coal beyond the triangular coal pillar. The plastic zone of the triangular coal pillar is only about 1 m after the excavation of the tail gate of the next split-level panel. The physical modeling shows that the tail gate of the next panel is in the destressed zone with only a very small stress fluctuation during the extraction of the next panel. The study shows that the location of the SLGE at Xiegou coal mine is reasonable. SLGE is preferable for ultra-thick coal seams.


Energies ◽  
2021 ◽  
Vol 14 (21) ◽  
pp. 7287
Author(s):  
Xinxin Zhou ◽  
Zhenhua Ouyang ◽  
Ranran Zhou ◽  
Zhenxing Ji ◽  
Haiyang Yi ◽  
...  

In order to prevent the multi-dynamic disasters induced by rock burst and roof water inrush in strong rock burst coal seams under multi-aquifers, such as is the case with the 207 working face in the Tingnan coal mine considered in this study, the exhibited characteristics of two types of dynamic disasters, namely rock burst and water inrush, were analyzed. Based on the lithology and predicted caving height of the roof, the contradiction between rock burst and water inrush was analyzed. In light of these analyses, an integrated method, roof pre-splitting at a high position and shattering at a low position, was proposed. According to the results of numerical modelling, pre-crack blasting at higher rock layers enables a cantilever roof cave in time, thereby reducing the risk of rock burst, and pre-crack blasting at underlying rock layers helps increase the crushing degree of the rock, which is beneficial for decreasing the caving height of rock layers above goaf, thereby preventing the occurrence of water inrush. Finally, the proposed method was applied in an engineering case, and the effectiveness of this method for prevention and control of multi-dynamics disasters was evaluated by field observations of the caving height of rock layers and micro-seismic monitoring. As a result, the proposed method works well integrally to prevent and control rock burst and water inrush.


Geofluids ◽  
2020 ◽  
Vol 2020 ◽  
pp. 1-19
Author(s):  
Xingping Lai ◽  
Huicong Xu ◽  
Jingdao Fan ◽  
Zeyang Wang ◽  
Zhenguo Yan ◽  
...  

In order to explore the mechanism of coal pillar rock burst in the overlying coal body area, taking W1123 working face of Kuangou Coal Mine as the engineering background, the full mining stage of W1123 is simulated by FLAC3D. It is found that the high stress concentration area has appeared on both sides of the coal pillar when W1123 does not start mining. With the advance of the working face, the high stress concentration area forms X-shaped overlap. There is an obvious difference in the stress state between the coal pillar under the solid coal and the coal pillar under the gob in W1123. The concrete manifestation is that the vertical stress of the coal pillar below the solid coal is greater than the vertical stress of the coal pillar below the gob. The position of the obvious increase of the stress of the coal pillar in the lower part of the solid coal is ahead of the advancing position of the working face, and the position of the obvious increase of the stress of the lower coal pillar in the gob lags behind the advancing position of the working face. At the same time, in order to accurately reflect the true stress environment of coal pillars, the author conducted a physical similarity simulation experiment in the laboratory to study the local mining process of the W1123 working face, and it is found that under the condition of extremely thick and hard roof, the roof will be formed in the gob, the mechanical model of roof hinged structurer is constructed and analyzed, and the results show that the horizontal thrust of roof structure increases with the increase of rotation angle. With the development of mining activities, the self-stable state of the high stress balance in the coal pillar is easily broken by the impact energy formed by the sudden collapse of the key strata. Therefore, the rock burst of coal pillar in the overlying coal body area is the result of both static load and dynamic load. In view of the actual situation of the Kuangou Coal Mine, the treatment measures of rock burst are put forward from the point of view of the coal body and rock mass.


Energies ◽  
2020 ◽  
Vol 13 (15) ◽  
pp. 3912
Author(s):  
Huadong Gao ◽  
Baifu An ◽  
Zhen Han ◽  
Yachao Guo ◽  
Zeyu Ruan ◽  
...  

China faces the problem of depletion of its coal resources, and a large number of mines are becoming aged mines. Demand for coal, however, still increases due to the growth of China’s economy. Energy shortage might restrict the sustainability of China’s national economy. As one contribution to a solution, this paper proposes the innovative exploitation method of solid backfill coal mining (SBCM) technology to exploit parts of pillar-blocked (residual coal pillar resources under industrial square, RCPRIS) that protect industrial facilities. Thus, blocked coal resources may be converted into mineable reserves that improve the recovery ratio of mine resources. Also, waste would be removed from the surface reducing hazards of environmental pollution. Based on the case of the Baishan Coal Mine in Anhui, China, numerical simulation is used to study the size of shaft-protecting coal pillars (SPCP) required at different backfill ratios. Results show that the disturbance to a shaft caused by exploitation decreases with the increase of the backfill ratio. When using SBCM to exploit RCPRIS under the condition of 80% backfill ratio, compared with the caving method, a lot of pillar-blocked coal resources would be freed. The life of Baishan Coal Mine would be prolonged, resulting in appreciable social, environmental, and economic benefits.


2021 ◽  
Vol 115 ◽  
pp. 104060
Author(s):  
Peng-qi Qiu ◽  
Jian-guo Ning ◽  
Jun Wang ◽  
Shan-chao Hu ◽  
Zhuang Li
Keyword(s):  

2021 ◽  
Vol 13 (5) ◽  
pp. 2712
Author(s):  
Hengfeng Liu ◽  
Qiang Sun ◽  
Nan Zhou ◽  
Zhongya Wu

Gradual instability of coal pillars left behind underground with room mining is one of the main reasons for sudden roof caving in the gob, surface subsidence, and other significant hazards. Moreover, room mining implies great losses of coal resources. In this paper, the main failure mode and room mining coal pillar process were analyzed according to the coalfield regional engineering geological and hydrogeological conditions. A numerical model was adopted to study the effect of different sizes of coal mining pillars and progressive instability failure of coal pillar on the plastic zone’s evolution characteristics and stress field of coal pillars in the stope. The proposed technologies of cemented paste backfilling and reinforcement of residual coal pillars are applied, and a numerical simulation model is established to study the strata movement characteristics and analyze the stability degree of residual coal pillar and key aquiclude strata in the Pliocene series of Neogene. Consequently, the performance and application prospect were evaluated. The results obtained substantiate a new method for the long-term stability control of coal pillars in room mining and protecting the ecological environment in China’s western eco-environmental frangible area.


2021 ◽  
Vol 2021 ◽  
pp. 1-11
Author(s):  
Fengnian Wang ◽  
Gan Li ◽  
Chi Liu

Through the establishment of structural mechanics model, this paper analyzes the fracture of super thick rock stratum. Through the model, it can be seen that the fracture of low-level super thick rock stratum produces large elastic energy release and dynamic load, which is easy to produce disasters such as rock burst. The numerical calculation shows that under the influence of low hard and thick rock stratum, the leading area of coal mine roadway will produce energy concentration, and the coal pillar will also produce energy accumulation. Thick rock stratum is in bending state and has large bending elasticity. Coal pillar has large compression elasticity, which is the main reason for rock burst. The accumulation of elastic properties of overburden and rock burst caused by coal pillar energy storage can be effectively controlled by using advanced presplitting blasting, coal seam drilling pressure relief, and strengthening support.


Sign in / Sign up

Export Citation Format

Share Document