scholarly journals Beyond the China factor: challenges to backward linkages in the Mozambican construction sector

2018 ◽  
Vol 56 (2) ◽  
pp. 325-351 ◽  
Author(s):  
Ulrikke Wethal

AbstractChina has become a significant contributor to closing Africa's infrastructural gap, but Chinese companies are repeatedly criticised for not involving local businesses in their operations, and for isolating themselves from the socio-economic environment. Can this be attributed to ‘typical Chinese business practice’? This article employs linkage theory to examine the weak domestic backward linkages in Chinese-led construction projects in Mozambique. The analysis shows that while Chinese companies do not involve Mozambican businesses in their activities to any extent, this cannot be attributed solely to any ‘Chinese business model’. It is a consequence of weak local industrial capabilities, fragile social infrastructure and a liberal policy environment not conducive to the creation of domestic backward linkages in Chinese-led construction projects.

The issues of determining the estimated cost of capital construction projects with the involvement of Federal budget funds at the stage of development of project documentation, during verification of the accuracy of determining the estimated cost and the initial (maximum) contract price are considered. On the basis of the assessment of amendments to urban planning legislation for the purpose of implementing a state contract by the contractor ( based on the results of competitive procedures or without competitive procedures by decision of state authorities), the procedure for forming the estimate as part of a state (municipal) contract, the price of which is firm, is presented. For the purpose of mutual settlements between the customer and the contractor for the work performed, the formation of primary accounting documentation, as well as for checking the work performed by regulatory authorities, an example of drawing up an estimate of the state (municipal) contract on the basis of grouping costs according to structural elements and complexes of work is given. The result of the research conducted was the development of regulations and the formation of criteria for their practical application by state bodies, institutions, organizations and other participants in the investment-construction process, as well as recipients of budget funds, who perform the functions of the state (municipal) customer, developer and technical customer.


2015 ◽  
Vol 3 (2) ◽  
pp. 69-84
Author(s):  
Wadhah Amer Hatem ◽  
Samiaah M. Hassen Al-Tmeemy

     Suicide attacks, bombings, explosions became the part of daily life in Iraq. Consequently, the threat of terrorism put the Iraqi construction sector in the face of unique and unusual challenges that not seen on other countries. These challenges can have extensive impact on construction projects. This paper seeks to examine the impact of the terrorist attacks on construction industry and determine the extent to which the impact of terrorism on construction projects in terms of cost, schedule, and quality. This study adapted quantitative and qualitative approaches to collect data using questionnaire survey and interviews, as well as historical data. The study focused on projects that have been the target of terrorist strikes in Diyala governorate. A variety of statistical procedures were employed in data analysis. The results revealed the extent to which terrorist attacks impact construction projects in terms of cost, time, and quality. The results of this study will enhance the awareness of all construction parties to the impact of the terrorist attacks against construction projects. Eventually, this can develop a risk management assessment and assist contractors to properly protect projects and buildings to minimize injuries and fatalities in the event of terrorism.


2017 ◽  
Vol 7 (12) ◽  
pp. 73
Author(s):  
Luis Eduardo Lozano Ortegón ◽  
Antonio Alonso-González

RESUMENEn el presente documento se introducen y analizan algunas de las variables a tener en cuenta en cualquier estudio de viabilidad referente a la inversión de capital privado de banca colombiana en el sector bancario español, planteando un modelo de negocio que permita alcanzar dicha viabilidad financiera de una forma sostenible mediante un formato de banco colombiano bajo la supervisión del Banco de España. Se plantean, así mismo, los requisitos y regulaciones a cumplir, incluyendo un diagnóstico del entorno económico y de la perspectiva del mercado financiero de captación y colocación bancaria española, así como sus portafolios y estrategias de marketing en un horizonte financiero a cinco años.ABSTRACTIn the present work some of the variables to be considered in any viability study concerning private equity investment of Colombian banks in the Spanish banking sector are introduced and discussed. Further, it proposes a business model that allows sustainable financial viability through a format of Colombian bank under the supervision of the Bank of Spain. Some of the requirements and regulations to comply are likewise explained, including an assessment of the economic environment and financial market perspective of the Spanish bank sector, as well as their portfolios and marketing strategies in a financial horizon to five years. Fecha de recepción: 27 de julio de 2016Fecha de aprobación: 17 de noviembre de 2016Fecha de publicación: 6 de enero de 2017 


Buildings ◽  
2021 ◽  
Vol 11 (7) ◽  
pp. 270
Author(s):  
Mostafa Babaeian Jelodar ◽  
Feiya Shu

The low-level application of digital tools and information systems in construction implies that many projects cannot meet modern requirements and standard of work of advanced industries. This study adopts a practical and diagnostic approach to identify key attributes and implementation processes of information systems in construction and logistics. To have triangulation of knowledge, a three-step methodology is adopted. Initially an exploratory analysis of previous literature is performed. Secondly a diagnostic analysis of IS applications in construction is achieved by case studies. Finally, expert interviews are performed to examine and consolidate the findings. The study illustrated practical and innovative applications of low-cost digital tools in IS development and created a framework for documentation of these discrete and mostly unshared practices. It is recommended that the construction sector should embrace more advance technologies to minimise human intervention and enhance real-time capabilities. The practicality of how different low-cost and off-the-shelf tools and digital platforms can be combined is discussed and demonstrated. The study provides a clear distinction for practitioners and academics as to what is being practiced in comparison to the dominant theories.


2015 ◽  
Vol 4 (1) ◽  
pp. 4-24 ◽  
Author(s):  
Julia Selberherr

Purpose – Sustainable buildings bear enormous potential benefits for clients, service providers, and our society. To release this potential a change in business models is required. The purpose of this paper is to develop a new business model with the objective of proactively contributing to sustainable development on the societal level and thereby improving the economic position of the service providers in the construction sector. Design/methodology/approach – The modeling process comprises two steps, the formal structuring and the contextual configuration. In the formal structuring systems theory is used and two levels are analytically separated. The outside view concerns the business model’s interaction with the environment and its impact on sustainability. The inside view focusses on efficient value creation for securing sustainability. The logically deductively developed business model is subsequently theory-led substantiated with Giddens’ structuration theory. Findings – The relevant mechanisms for the development of a new service offer, which creates a perceivable surplus value to the client and contributes to sustainable development on the societal level, are identified. The requirements for an efficient value creation process with the objective of optimizing the service providers’ competitive position are outlined. Research limitations/implications – The model is developed logically deductively based on literature and embedded in a theoretical framework. It has not yet been empirically tested. Practical implications – Guidelines for the practical implementation of more sustainable business models for the provision of life cycle service offers are developed. Social implications – The construction industry’s impact requires it to contribute proactively to a more sustainable development of the society. Originality/value – This paper analyzes the role for the players in the construction sector in proactively contributing to sustainable development on the societal level. One feasible strategy is proposed with a new business model, which aims at cooperatively optimizing buildings and infrastructures and taking the responsibility for the operating phase via guarantees.


2021 ◽  
Vol 14 (2) ◽  
pp. 62-70
Author(s):  
Huda Yaseen ◽  
Hafeth I. Naji

Construction projects are of a special nature affected by many factors, which makes them exposed to multiple risks that may lead to the abandonment of projects. Recently, the Iraqi construction sector is facing a number of problems. Abandoned construction projects are one of the most common and dangerous problems in the construction industry in Iraq, with their negative effects on stakeholders, the economy, and the environment due to the lack of sufficient financial and administrative capabilities to complete construction projects, which is reflected in exceeding the time limit for the completion of projects. The aim of this research is to use the analytic network process (ANP) technique to choose the best form of Public-Private Partnership (PPP) contracts to fund abandoned projects in Iraq. using a questionnaire survey to determine the most criteria and alternatives for selecting appropriate financing for the abandoned project. The results shown final weight of the Build-Own-Operate (BOO) contract from ANP is 0.533, which is the best form of PPP contract among the alternatives proposed to fund the project.


2021 ◽  
Author(s):  
Zainab Sarbaz Abdulhameed AL-DABBAGH ◽  
◽  
Gökhan GELİŞEN ◽  

Design-Build (DB) and Build-Operate-Transfer (BOT) contracts are the two types of public-private-partnerships that are widely used in the region that are aimed in this study. The objectives of this study were to analyze and compare DB and BOT projects in terms of project costs and durations. In order to analyze and compare Design-Build (DB) and Build-Operate-Transfer (BOT) projects, this study collected data by means of convenient random sampling, from construction projects built by five ministries of Republic of Turkey. Statistical tests were conducted to determine if the metrics related to cost and schedule were significantly different from each other in these two types of projects. The findings of this study will help the public agencies decide what delivery method is best for their projects in terms of controlling costs and schedule. Results show that DB projects outperform BOT projects in terms of cost and schedule. The results of this research will enable governments to become more familiar with comparisons between DB and BOT distribution methods, and the findings will help the ministries to choose swhich delivery method is suitable for use on a project-based.


Author(s):  
Pavel N. Dudin ◽  
◽  
Zufar F. Khusainov ◽  

Introduction. In November of 1921 after the meeting between Mongolian officials and Vladimir Lenin, an Agreement on Friendly Relations between the two states was concluded. This significant act confirmed the mutual recognition of the only legitimate government by both counterparties, measures of prevention of unfriendly actions by third parties, exchange of plenipotentiary representatives and ambassadors, state border regulations and the most favorable nation treatment for citizens whilst visiting the counterparty and jurisdiction. It also provided the regulations for a number of trade matters, intercommunication issues, questions of personal property etc., however, in actuality this document touched upon a smaller realm of mutual relations that had already been established before the execution of the Agreement, having been formalized in other documents, such as letters and memorandums. These precontractual acts are of genuine interest not only due to their uncertain legal nature and consequences, but also because they cover a much wider range of collaboration and cooperation issues than the Agreement dated November 5, 1921. Goals. So, the paper attempts an interdisciplinary insight into the mentioned documents (addresses, diplomatic notes, letters, etc.) to have preceded the Agreement and formalized Soviet Russia’s foreign policy in the region and its presence in the territory of Outer Mongolia ― to determine the role and impact of the former. Materials and Methods. The study focuses on widely known materials contained in diverse published collections of documents from the Soviet era that were never viewed by most researchers as important tools to have guaranteed the national interests in the Far East. To facilitate a more comfortable perception of the investigated materials by different specialists, the paper was divided in two ― Part One to focus on research tools and its ideological essentials, and Part Two to emphasize certain instruments to have secured the ‘export of revolution’. Results. The article specifies four key lines of cooperation: 1) bilateral collaboration that includes ‘export of ideology’ and sufficient tools thereto, such as disassociation from former political regimes, support for anticolonial sentiments, securement of equal rights in foreign policy issues, cooperative struggle against the common ideological enemy ― world capitalism, ‘soft power’ in the form of educational projects; 2) security arrangements for Soviet territories and borders, including assistance to Mongolian comrades in their fight against the White Guard, allocation of the Red Army units within Mongolian territories until the complete eradication of the White threat, with the participation of military units from the Far Eastern Republic; 3) economic cooperation through mutual financial and economic support of industrial construction projects, resource development and social infrastructure initiatives, etc., 4) joint actions on the international stage pinnacled with the recognition of the Mongolian People’s Republic by China (1945) and the rest of the world community (1961). This shows that during the shaping of the political agenda towards Mongolia the then Soviet leaders did not view contractual aspects of the mechanism as fundamental, and attached no paramount importance to international agreements, which had been distinctive of the Russian Empire.


Author(s):  
İpek Koçoğlu ◽  
Ali E. Akgun ◽  
Halit Keskin

This research aims to tap into the largely opaque origins of opportunities in the online context by exploring the role of business model development as a key for the creation and configuration of the mental and social infrastructure necessary for the emergence of online entrepreneurial opportunity. Tracing the sources of online entrepreneurial opportunity reveals that successful online entrepreneurs claim to proactively manage their environment in terms of unfolding actions which result in the enactment and creation of entrepreneurial opportunities. Based on this real life contention and the emerging view of entrepreneurial opportunity, this chapter aims to achieve a deeper understanding on the creation of online opportunities through a quantitative study empirically testing the link between business model development and online entrepreneurial opportunity as creation in order to shed light on how business model generation shapes the way entrepreneurs socially co-create opportunities in the online context.


Sign in / Sign up

Export Citation Format

Share Document