scholarly journals Investigation into the causes of delay in land acquisition for PPP projects in developing countries

2017 ◽  
Vol 15 (4) ◽  
pp. 552-570 ◽  
Author(s):  
Solomon Olusola Babatunde ◽  
Onaopepo Adeniyi ◽  
Oluwaseyi Alabi Awodele

Purpose The land is a critical resource for public-private partnerships (PPPs) in infrastructure development. However, acquisition of land for PPP infrastructure projects implementation increasingly becomes problematic in developing countries. Yet, effort at investigating the factors causing a delay in land acquisition for PPP infrastructure projects through an empirical method in developing countries received scant attention. Therefore, the purpose of this study is to identify and critically assess the factors predisposing PPP projects implementation to land acquisition delay in Nigeria using an empirical approach. Design/methodology/approach The study adopted literature review and questionnaire survey. For instance, literature review was used to identify the factors causing delay in land acquisition for PPP projects in developing countries, which was used to design the questionnaire survey culminating in data analysis. To capture a broad perception, the questionnaires were administered to three different primary stakeholder groups comprised public sector authorities (i.e. ministries, department, agencies), concessionaires and lenders/banks involved in PPP projects implementation in Nigeria. Data collected were analysed using mean score, Kruskal–Wallis test and factor analysis. Findings The study revealed the mean score ranking of 22 identified factors causing a delay in land acquisition for PPP projects in Nigeria. The result of factor analysis grouped the 22 identified factors into 4 principal factors, namely, resettlement issues with political interference; non-availability of land with a higher cost of land transactions; weak planning institutions; and rehabilitation issues with extensive legal delays. Practical implications These study findings have implications for both policymakers considering PPP projects and private investors seeking to finance a PPP project in developing countries. Also, the study findings would be useful for the governments in Nigeria and other developing countries to formulate clear policies framework that facilitates the smooth acquisition of land for PPP projects. Originality/value The study will be beneficial to the potential local and foreign private investors and governments by broadening their awareness on impediments in land acquisition for PPP projects in Nigeria and developing countries at large. These study findings are crucial, as not many empirical studies have been conducted in Nigeria and many other developing countries.

2017 ◽  
Vol 24 (6) ◽  
pp. 1690-1708 ◽  
Author(s):  
Solomon Olusola Babatunde ◽  
Srinath Perera

Purpose The presence of previous awarded public-private partnership (PPP) infrastructure projects that significantly delays reaching financial close constrain the likely success of new PPP projects. However, effort at investigating financial close delays of PPP projects through empirical studies by the research community received scant attention. Thus, the purpose of this paper is to identify and assess the factors causing delays in PPP projects from reaching financial close in developing countries. Design/methodology/approach The study adopted literature review and questionnaire survey. In order to capture a broad perception, a questionnaire survey was adopted, which was administered to three different primary stakeholder categories comprised public sector authorities (i.e. ministries, department, and agencies), concessionaires, and lenders/banks already involved in PPP infrastructure projects implementation in Nigeria. The data obtained were analysed using mean score, Kruskal-Wallis test, and factor analysis. Findings The study revealed the mean score ranking of 39 identified causes of financial close delays in PPP projects, and the mean score values for all the identified 39 causes of financial close delays are very high. The study, through factor analysis, categorised the 39 identified causes of financial close delays into eight principal factors. The factors are: decreased bankability of PPP projects; unstable economic policy; weak financial, technical, and managerial capabilities of the concessionaires; weak public institutions; lack of creditworthiness of both the project sponsors and active partner; unfavourable economy of the host country; weak legal and unfavourable environment; and high contingent liabilities, respectively. Practical implications The identification and evaluation of the factors delaying PPP projects development from reaching financial close in a reasonable time manner would be useful for PPP primary stakeholders to develop strategies to safeguard the present and future PPP projects implementation in developing countries. Originality/value The study findings would be useful for both policymakers considering PPP projects and private investors seeking to finance PPP projects in developing countries. This study is crucial as not many empirical studies have been conducted in developing countries.


Subject Outlook for infrastructure development. Significance President Joko 'Jokowi' Widodo has pledged to build 5,000 kilometres (km) of railway, 2,600 km of roads, 1,000 km of toll-roads and 49 dams over the next five years. To that end, his administration on March 20 issued a new regulation aimed at facilitating public-private partnerships (PPPs) in infrastructure projects. The new regulation seeks to strengthen the legal, regulatory and financial framework for such projects. Impacts Land acquisition problems will be the hardest to resolve, given the lack of proper records. Tighter checks on malfeasance promise longer-term gains in transparency, but near-term they will slow disbursement. Reducing food inflation will be difficult as long as the infrastructure deficit persists.


Subject Indonesia's infrastructure plans. Significance Indonesia will need over 416 billion dollars for infrastructure development between 2015 and 2019, according to the National Development Board's mid-term development plan published late last year. To that end, President Joko 'Jokowi' Widodo's government is planning to treble public infrastructure spending to 26 billion dollars in 2016, from about 9 billion dollars in 2015. For 2016, the government has pledged to streamline further the planning and funding systems of infrastructure projects, offering increasingly better regulatory and financial terms to private investors. Impacts Cancellation of the Bandung-Jakarta rail project has hit Chinese-Indonesian infrastructure cooperation, but only temporarily. A repeat of such a political debacle, however, could have a more lasting impact on Chinese and Japanese investors' appetite. To make 'new friends' in South-east Asia, Russia will probably invest in Indonesian infrastructure, especially in the energy sector.


Kybernetes ◽  
2019 ◽  
Vol 49 (4) ◽  
pp. 1083-1102
Author(s):  
Georgios N. Aretoulis ◽  
Jason Papathanasiou ◽  
Fani Antoniou

Purpose This paper aims to rank and identify the most efficient project managers (PMs) based on personality traits, using Preference Ranking Organization METHod for Enrichment Evaluations (PROMETHEE) methodology. Design/methodology/approach The proposed methodology relies on the five personality traits. These were used as the selection criteria. A questionnaire survey among 82 experienced engineers was used to estimate the required weights per personality trait. A second two-part questionnaire survey aimed at recording the PMs profile and assess the performance of personality traits per PM. PMs with the most years of experience are selected to be ranked through Visual PROMETHEE. Findings The findings suggest that a competent PM is the one that scores low on the “Neuroticism” trait and high especially on the “Conscientiousness” trait. Research limitations/implications The research applied a psychometric test specifically designed for Greek people. Furthermore, the proposed methodology is based on the personality characteristics to rank the PMs and does not consider the technical skills. Furthermore, the type of project is not considered in the process of ranking PMs. Practical implications The findings could contribute in the selection of the best PM that maximizes the project team’s performance. Social implications Improved project team communication and collaboration leading to improved project performance through better communication and collaboration. This is an additional benefit for the society, especially in the delivery of public infrastructure projects. A lot of public infrastructure projects deviate largely as far as cost and schedule is concerned and this is an additional burden for public and society. Proper project management through efficient PMs would save people’s money and time. Originality/value Identification of the best PMbased on a combination of multicriteria decision-making and psychometric tests, which focus on personality traits.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Andrei Boar ◽  
Erola Palau Pinyana ◽  
Marc Oliveras-Villanueva

PurposeThis paper takes a critical view of synergies and trade-offs and discloses the practices that countries and companies should apply to achieve sustainable development.Design/methodology/approachThis paper offers a systematic literature review of 408 papers to find models of sustainable development goals (SDGs) interaction with the aim of shedding light on the existing synergies and trade-offs and finding solutions to enhance these synergies and minimize the trade-offs.FindingsBoth rich and developing countries should follow multiple strategies to improve the quality of life of their citizens. Developing countries should focus on eradicating poverty. Rich countries should apply new economic models that are more likely to be environmental-friendly. Finally, the topic of SDGs should be revisited by the United Nations.Practical implicationsBoosting the quality of education and providing clean energy are two of the most relevant actions that should to be taken by countries, as they will accelerate the fulfilment of all the other SDGs. The use of circular economic models or new business models, such as the sharing economy, is essential to the achievement of sustained economic growth without negative environmental impact.Originality/valueThe paper analyzes SDG interactions and offers a critical vision of practices that countries and companies should adhere to for achieving sustainable development.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Catherine Maware ◽  
Modestus Okechukwu Okwu ◽  
Olufemi Adetunji

Purpose This study aims to comparatively discuss the effect of lean manufacturing (LM) implementation in the manufacturing sectors of developing and developed countries. Design/methodology/approach An in-depth literature review focused on previous research published between 2015 and March 2020. The papers published by the databases such as Google Scholar, Scopus, ProQuest and Web of Science were used in the study. A total of 63 studies that focused on LM application in manufacturing industries in developing and developed countries were used in the research. Findings It was observed that LM improves operational performance for manufacturing organizations in developing and developed countries. Small and medium-sized enterprises in both developed and developing countries have difficulties transforming their organizations into lean organizations compared to large enterprises. Furthermore, the review also found that there seems to have been no paper had reported the negative impact of implementing LM in manufacturing industries in developing and developed countries from 2015 to March 2020. Research limitations/implications The study used research papers written between January 2015 and March 2020 and only considered manufacturing organizations from developed and developing nations. Practical implications The study provides more insight into LM implementation in developing and developed countries. It gives the LM practices and the implications of applying these practices in manufacturing organizations for developing and developed countries. Originality/value A preliminary review of papers indicated that this seems to be the first paper that comparatively studies how LM implementation has affected manufacturing organizations in developed and developing countries. The study also assessed the LM practices commonly used by the manufacturing industries in developing and developed countries.


2017 ◽  
Vol 7 (2) ◽  
pp. 30-52 ◽  
Author(s):  
Do Tien Sy ◽  
Veerasak Likhitruangsilp ◽  
Masamitsu Onishi ◽  
Phong Thanh Nguyen

The rapidly increasing demand and the inefficacy of financing transportation infrastructure project investments have contributed to various challenges for Vietnam in recent decades. Since the country’s budget is inadequate for investing in all necessary infrastructure projects, the Vietnam government has been inviting other economic sectors, especially the private sector, to participate in infrastructure development. The cooperation between the government agencies and the private entities, called PublicPrivate Partnership (PPP), must encounter various challenges leading to difficulties in attracting private investors. A main reason is that private investors must deal with critical risks concerning PPP investment environment. It is a challenging task for the government to optimally manage such risks to enhance the attractiveness of PPP projects for private investors. This paper examines the critical risk factors that influence the private sector’s investment decisions on PPP transportation projects in Vietnam. Risk factors inherent in typical PPP projects were compiled by comprehensive literature review. To reflect unique characteristics of PPP projects in Vietnam, the compiled risk factors were reviewed by a group of PPP experts from both the public and private sectors in Vietnam through indepth interviews and questionnaire surveys. In addition, ten PPP project case studies in Vietnam were analyzed to derive the risk profile of PPP transportation projects of the nation. These risk factors were quantitatively assessed based on their probabilities and impact levels. We found that the critical risk factors of PPP infrastructure projects in Vietnam are acquisition/compensation problems, approvals and permits, inadequate feasibility studies, finance market issues, subjective evaluation methods, and change in laws and regulations. By performing factor analysis, these critical risk factors were grouped into four categories: (1) bidding process, (2) finance issues, (3) laws and regulations, and (4) project evaluation issues. These critical risk factors represent the obstacles that repel private investors from PPP transportation projects in Vietnam. Thus, the Vietnam government agencies should meticulously address these issues to attract both domestic and foreign private investors in PPP projects.


Author(s):  
Solomon Olusola Babatunde ◽  
Srinath Perera

Purpose The purpose of this study is to identify and critically assess the barriers to bond financing for public–private partnership (PPP) infrastructure projects in Nigeria using an empirical quantitative analysis. Innovative ways to finance long-term infrastructure projects had been documented. However, there is a dearth of empirical studies on the barriers to bond financing for PPP infrastructure projects. Design/methodology/approach A comprehensive literature review was conducted to identify the barriers to bond financing for infrastructure projects, which were employed to design a questionnaire. A questionnaire survey was carried out which targeted financial experts in the Nigerian financial institutions/local banks. Data collected were analysed using descriptive and inferential statistics to include mean score, chi-square (χ2) test and factor analysis (principal component analysis). Findings The analysis of the ranking in terms of the mean score values for the 12 identified barriers indicated that all the identified barriers are considered by respondents as critical barriers to bond financing for PPP infrastructure projects in Nigeria. The study, through factor analysis, grouped the 12 identified barriers into 5 principal factors. These include governance and institutional capacity issues, higher issuance cost and risk, difficulties in getting approval for changes, the small size of bond markets and stringent disclosure requirements. Practical implications This research is significant by providing the empirical evidence of the barriers to bond financing for PPP infrastructure in emerging markets, especially in Nigeria. Originality/value The findings would enable the policymakers to draw some policy recommendations that will positively influence the development of bond markets in Nigeria and emerging markets at large. These study findings are crucial, as not many empirical studies have been conducted in Nigeria.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Isaac Akomea-Frimpong ◽  
Xiaohua Jin ◽  
Robert Osei-Kyei ◽  
Augustine Senanu Kukah

PurposeThe contribution of the public–private partnership (PPP) model towards the achievement of the United Nation (UN)'s Sustainable Development Goals (SDGs) has been widely acknowledged. However, limited studies have shed light on the connection between PPPs and the achievement of these coveted goals in Ghana. In this study, the authors aimed at analysing and synthesising the existing literature on the use of PPP to achieve sustainability in infrastructure projects in the country.Design/methodology/approachA three-step approach was used to retrieve and review 60 selected articles aided by content analysis.FindingsThe analysis showed that all existing relevant publications on the application of the PPP model to attain UN’s SDGs in the country are organised around dominant themes, such as poverty alleviation, urban development, waste management and risk management. However, the review revealed little studies exist on pertinent issues relating to PPPs and sustainable development goals, such as climate action, critical resilience, sustainable finance and clean energy.Research limitations/implicationsAlthough the study is limited to 60 articles in Ghana, the results reveal pertinent gaps for further research studies to achieve sustainable infrastructural development in Ghana and other countries.Practical implicationsHolistically, the outcome of this study will serve as a guide to project managers to understand essential issues on attaining sustainability on public projects.Originality/valueThis article contributes to the literature and practice on the significance of PPP in mainstreaming UN's SDGs in public infrastructure projects.


2020 ◽  
Vol 17 (4) ◽  
pp. 549-566
Author(s):  
Priyanka Pathak ◽  
M.P. Singh ◽  
Gaurav Kumar Badhotiya

PurposeManufacturing organization has adopted the concept of sustainability to improve the performance of product and process as well as to focus on environmental issues. Despite technological advancements and awareness, there exist several performance obstacles for the implementation of sustainable manufacturing in an organization. The objective of the current study is to identify the performance obstacles, propose a structural model and validate the proposed model.Design/methodology/approachTwelve performance obstacles are identified through critical literature review and discussion with field experts. Primary and secondary factor analysis, that is, exploratory factor analysis (EFA) and confirmatory factor analysis (CFA), are used for the creation of the structural model, and further, structural equation modeling is used as a validating tool. EFA deals with the categorization of all performance obstacles in four major criteria, and CFA works for proposing a model for a relationship among all obstacles.FindingsA validated structural model is provided through hypothesis acceptance for structural equation modeling. The outcome of this study can be helpful for decision-makers to incorporate sustainable practices in the manufacturing organization.Originality/valueThis study has extracted and identified performance obstacles for the implementation of sustainable manufacturing based on critical literature review and discussion with field experts. The study proposes as well as validates the structural equation model.