scholarly journals DETERMINANTS OF SLOPE STABILITY REDUCTION / DETERMINANTY ZNI ŽOVANIA STABILITY SVAHU

2013 ◽  
Vol 16 (2) ◽  
pp. 29-32
Author(s):  
Dagmar Dobiašová ◽  
Jozef Streďanský ◽  
Lucia Tátošová

Abstract The formation or activation of landslide movements in Podtatranska kotlina is quite common, as it is flysh and volcanic area. There is a high incidence of sandstones in this area. The sandstones crumble and weather, and this is the reason why the subsoil becomes unstable. The rainfall is accumulated, and there is a danger of soil sliding down. There was located groundwater level in the central part of the slope (in the height of 30 cm), and in some parts, the water accumulation occurred in the depression places on the landslide body. There were created small landslide lakes, where the water was held during the year. The slope was soaked and the erosion started to increase. The slope with its instability has pushed the construction of road that leads underneath the heel of the slope. Neglected and improper construction in areas of slope landslides has become a relatively common phenomenon. Stabilization measures are often made up only when real problem occurs. An anthropogenic activity usually starts this problem. This refers to deforestation, grassing or deformation of slope stability in the heel by improper construction. The landslide was not the first one in the area. In 1898, there was the first landslide, but it was not as intensive as this one. Retaining wall was the only one stabilization measure which was built in that time. It also had a drainage outfall. However, during the summer months in 2010, the stabilization measure was disrupted and cracked. This occurrence started after the slope separation and by the foremost pressure on the given wing wall. During our measurements, we found out that in that area, there was a loss of plant cover, erosion accrued and soil physical properties changed. Our aim is to show the seriousness of the situation and propose appropriate stabilizing measures.

2021 ◽  
Vol 2021 ◽  
pp. 1-17
Author(s):  
Filip Lorenz ◽  
Vit Janos ◽  
Dusan Teichmann ◽  
Michal Dorda

The article addresses creation of a mathematical model for a real problem regarding time coordination of periodic train connections operated on single-track lines. The individual train connections are dispatched with a predefined tact, and their arrivals at and departures to predefined railway stations (transfer nodes) need to be coordinated one another. In addition, because the train connections are operated on single-track lines, trains that pass each other in a predefined railway stations must be also coordinated. To optimize the process, mathematical programming methods are used. The presented article includes a mathematical model of the given task, and the proposed model is tested with real data. The calculation experiments were implemented using optimization software Xpress-IVE.


2020 ◽  
Vol 9 (1) ◽  
pp. 26 ◽  
Author(s):  
Dongdong Yang ◽  
Haijun Qiu ◽  
Yanqian Pei ◽  
Sheng Hu ◽  
Shuyue Ma ◽  
...  

Infiltration plays an important role in influencing slope stability. However, the influences of slope failure on infiltration and the evolution of infiltration over time and space remain unclear. We studied and compared the infiltration rates in undisturbed loess and disturbed loess in different years and at different sites on loess landslide bodies. The results showed that the average initial infiltration rate in a new landslide body (triggered on 11 October 2017) were dramatically higher than those in a previous landslide body (triggered on 17 September 2011) and that the infiltration rates of both landslide types were higher than the rate of undisturbed loess. The initial infiltration rate in the new landslide body sharply decreased over the 4–5 months following the landslide because of the appearance of physical crusts. Our observations indicated that the infiltration rate of the disturbed soil in a landslide evolved over time and that the infiltration rate gradually approached that of undisturbed loess. Furthermore, in the undisturbed loess, both the initial and quasi-steady infiltration rates were slightly higher in the loess than in the paleosol, and in the previous landslide body, the infiltration rate was highest in the upper part, intermediate in the middle part, and lowest in the lower part. This study can help us to better understand the evolution process of infiltration in undisturbed loess, previous landslides, and new landslides.


2011 ◽  
Vol 374-377 ◽  
pp. 2061-2065
Author(s):  
Shou De Li ◽  
Hui Er Xu ◽  
Jian Chen ◽  
Qin Qin Li ◽  
Zheng Hong Tian ◽  
...  

New structure of long straight walls with arched retaining wall was raised to improve the anti-sliding capacity of embankment soft ground. The arched walls embedded in the soft subsoil will transfer lateral forces in reasonable ways. Detailed research shows that the structure of arched walls can greatly increase slope stability and reliability.


2013 ◽  
Vol 353-356 ◽  
pp. 686-691 ◽  
Author(s):  
Zhuan Wen Xiao ◽  
Lei Huang

The landslide at the tunnel portal in Nanjing Road is mainly determined by a weak intercalated layer between the completely weathered bedrock and the strongly weathered bedrock. The weak intercalated layer has low permeability and weak shear strength, and its interface dip outside of the slope. As the consequence, landslide is likely to happen again due to a rainstorm or other inducement. In order to prevent a second landslide, a comprehensive treatment scheme is presented, which implements anti-slide piles as the major treatment and several auxiliary treatments including filling and compacting the cracks, cutting-off and draining water, locally bolt-shotcrete support, and repairing the existing retaining wall and the lattic frame beams. After applying this scheme, the slope stability meets the design requirements.


2018 ◽  
Vol 1 (3) ◽  
pp. 76-82
Author(s):  
Wihardi Wihardi ◽  
Munirwansyah Munirwansyah ◽  
Sofyan M. Saleh

Road infrastructure is very important and is a key enabler for the economy. If the road infrastructure was damaged or had various problems such as sliding, the movement of goods and passengers will be hampered and delayed to the acceleration of development in the local area. The landslide and movement of groundwater is a problem that often occurs repeatedly on some streets. Therefore, it is necessary to study the strengthening of the slopes at the bottom of the road construction with retaining wall. This study aims to analyze slope stability by getting numbers Safety Factor (FK). The analysis is used to analyze the stability of slopesusing the finite element method with the help of software Plaids, The scope of this review includes the calculation of slope stability at the national road from Banda Aceh - Medan Sta. 83 + 185 Mount Selawah. The results of slope stability analysis on the existing condition by using Plaxis software at the point of a review is not safe (FK 1.25). Thus, it is done handling the retaining wall, installation of anchors. Based on the analysis of slope stability after being given the strengthening of the slopes with a retaining wall and the installation of anchors using Plaxis software under the influence of traffic load in an unsafe condition (FK 1.25). Then additional handling is done by changing the angle of the slope so that the value of the safety factor (FK) 1.25.


2020 ◽  
pp. 65-75
Author(s):  
Liudmyla Skochko ◽  
Viktor Nosenko ◽  
Vasyl Pidlutskyi ◽  
Oleksandr Gavryliuk

The stability of the slope in the existing and design provisions is investigated, the constructive decisions of retaining walls on protection of the territory of construction of a residential complex in a zone of a slope are substantiated. The stability of the slope when using rational landslide structures is estimated. The results of the calculation of the slope stability for five characteristic sections on the basis of engineering-geological survey are analyzed. For each of the given sections the finite-element scheme according to the last data on change of a relief is created. The slope was formed artificially by filling the existing ravine with construction debris from the demolition of old houses and from the excavation of ditches for the first houses of the complex. Five sections along the slope are considered and its stability in the natural state and design positions is determined. Also the constructive decisions of retaining walls on protection of the territory of construction of a residential complex as along the slope there are bulk soils with various difference of heights are substantiated. This requires a separate approach to the choice of parameters of retaining walls, namely the dimensions of the piles and their mutual placement, as well as the choice of the angle of the bulk soil along the slope. The calculations were performed using numerical simulation of the stress-strain state of the system "slope soils-retaining wall" using the finite element method. An elastic-plastic model of soil deformation with a change in soil parameters (deformation module) depending on the level of stresses in the soil is adopted. Hardening soil model (HSM) used. Calculations of slope stability involve taking into account the technological sequence of erection of retaining walls and modeling of the phased development of the pit. The simulation was performed in several stages: Stage 1 - determination of stresses from the own shaft, Stage 2 - assessment of slope stability before construction, Stage 3 - installation of retaining wall piles, Stage 4 - assessment of slope stability after landslides. Based on these studies, practical recommendations were developed for the design of each section of the retaining wall in accordance with the characteristic cross-sections.


Author(s):  
Rizki Ramadhan ◽  
Munirwansyah Munirwansyah ◽  
Munira Sungkar

The Aceh Tengah / Gayo Lues-Blangkejeren road segment (N.022) Km 438 + 775 is one of the Central Cross National Roads in the Province of Aceh, which often experiences landslides due to being in hilly areas. Landslides that occur in these locations are caused by scouring of road runoff, lack of optimal drainage and the absence of outlets for drainage and soil layers under asphalt pavement consisting of loose material. Therefore, a slope reinforcement study with Counterfort type retaining wall is needed. This study aims to analyze slope stability by obtaining safety factor numbers and identifying slope failure patterns. Analysis was carried out to obtain safety factors and slope failure patterns by using 2D Plaxis and slice methods. The calculation of safety factors for Counterfort type retaining walls is done manually. The input soil parameters used are dry volume weight (gd), wet volume weight (gw), permeability (k), modulus young (Eref), paisson's ratio (υ), shear angle (f), cohesion (c) . The results of slope stability analysis on the existing conditions using the Plaxis program and the slice method with radius (r) 65.06 meters found that safety factors were 1.038 and 1.079 with unsafe slope conditions (FK <1.25). The results of the analysis after reinforced counterfort and minipile type retaining wall with a length of 12 meters found 1,268 safety factor numbers with unsafe slope conditions (FK <1,5). Thus, additional reinforcement is needed by using anchor on the counterfort. The results of slope stability analysis after reinforced counterfort, minipile and anchor type retaining walls with a length of 20 meters and a slope of 30 ° were obtained with a safety factor number of 1.513 with safe slope conditions (SF> 1.5).ABSTRAKRuas jalan batas Aceh Tengah/Gayo Lues-Blangkejeren (N.022) Km 438+775 merupakan salah satu ruas jalan Nasional Lintas Tengah Provinsi Aceh, yang sering mengalami terjadi tanah longsor karena berada di daerah perbukitan. Longsoran yang terjadi pada lokasi tersebut disebabkan oleh gerusan air limpasan permukaan jalan, kurang optimalnya drainase dan tidak adanya outlet untuk pembuangan air serta lapisan tanah di bawah perkerasan aspal terdiri dari material lepas. Oleh karena itu, diperlukan kajian perkuatan lereng dengan dinding penahan tanah tipe Counterfort. Kajian ini bertujuan untuk menganalisis stabilitas lereng dengan mendapatkan angka faktor keamanan dan mengidentifikasi pola keruntuhan lereng. Analisis dilakukan untuk mendapatkan faktor keamanan dan pola keruntuhan lereng yaitu dengan menggunakan program Plaxis 2D dan metode irisan. Perhitungan faktor keamanan untuk dinding penahan tanah tipe Counterfort dilakukan secara manual. Adapun parameter  tanah input yang digunakan adalah berat volume kering (gd), berat volume basah (gw), permeabilitas (k), modulus young (Eref), paisson’s rasio (υ), sudut geser (f), kohesi (c). Hasil analisis stabilitas lereng pada kondisi eksisting menggunakan program Plaxis dan metode irisan dengan jari-jari (r) 65,06 meter didapatkan akan faktor keamanan sebesar 1,038 dan 1,079 dengan kondisi lereng tidak aman (FK < 1,25). Hasil analisis setelah diperkuat dinding penahan tanah tipe counterfort dan minipile dengan panjang 12 meter didapatkan angka faktor keamanan 1,268 dengan kondisi lereng tidak aman (FK < 1,5). Dengan demikian, maka diperlukan perkuatan tambahan dengan menggunakan angkur pada counterfort. Hasil analisis stabilitas lereng setelah diperkuat dinding penahan tanah tipe counterfort, minipile dan angkur dengan panjang 20 meter serta sudut kemiringan 30° didapatkan angka faktor keamanan 1,513 dengan kondisi lereng aman (SF > 1,5).Kata kunci : longsoran; counterfort; plaxis 2D; faktor keamanan.


UKaRsT ◽  
2021 ◽  
Vol 5 (2) ◽  
pp. 236
Author(s):  
Akhmudiyanto Akhmudiyanto ◽  
Paulus Pramono Rahardjo ◽  
Rinda Karlinasari

One of the causes of on-road collapse slopes is traffic load. Slope failure by road loads usually occurs due to several factors such as soil type, rainfall, land use. This study aims to determine landslide and slope repair performance using bore pile and ground anchor on Cipali Toll Road KM 103. The research method used in this study is the Finite element method. In this research, data collection, modeling parameter determination, slope stability analysis, slope reinforcement analysis, and reinforcement design were carried out with variations in bore pile and ground anchor dimensions. The software program used is a finite element program in the form of PLAXIS to analyze slope stability and estimate the slope failure area. The result of the study is that the R-Value inter is 0.25 with a 1.0341 safety factor. Best repair performance obtained from the addition of reinforcement with ground anchor 2 layer on bore pile 2 with a distance of 2 meters increased the safety factor to 1,913; Borepile capacity calculation with the calculation of normal force and moment iteration, the largest occurs in the DPT (Retaining Wall) stage with a normal load of -37.9 and a moment force of -471.15 which is still able to be borne by bore pile 1. The result of this study is expected to be benchmark and repair material to improve slope stability at km 103 Tol Cipali


2017 ◽  
Vol 1 (2) ◽  
Author(s):  
Nam Kyu Kim

The treatment of locally advance rectal cancer is a challenging with a relatively high incidence of local recurrence. CRT, however, has proven to be a great success in controlling rectal tumor locally. Nevertheless, recognizing relevant biomarkers are of paramount importance in order to tailor patient management and to avoid unnecessary chemotherapy related morbidity. In addition, biomarkers could outline oncological outcomes early on. Tumor response considered a strong indicator about tumor status and response to the given treatment. Unfortunately, there is no single effective method to predict tumor response to CRT treatment solely. However development of clinical and immunohistochemistry markers are essential to know what it takes to design a proper management plan for the right patient. We focus in our review to summarize relevant articles emphasizing predictive value of tumor biomarker in estimating rectal cancer response to preoperative CRT.   


Sign in / Sign up

Export Citation Format

Share Document