scholarly journals Contribution of Electrolysis within an Integrated System for a Poultry Slaughterhouse Wastewater Treatment

2021 ◽  
Vol 13 (22) ◽  
pp. 12430
Author(s):  
Kulyash Meiramkulova ◽  
Timoth Mkilima ◽  
Aliya Kydyrbekova ◽  
Yevgeniy Nikitin ◽  
Amanbek Zandybay ◽  
...  

Treatment of poultry slaughterhouse wastewater before disposal or reuse is an essential part of human health and environmental protection in general. This study aimed to investigate the influence of the pre-treatment system based on electrolysis technology within an integrated lab-scale treatment plant in the removal of contaminants from poultry slaughterhouse wastewater. Several treatment units (averaging tank, feather catcher, fat catcher, and coarse mechanical filter) were connected in series before the electrolysis chamber. While in general, the entire integrated system also included some other units such as ultra-filtration, reverse osmosis, and the ultraviolet lamp connected in series. From the analysis results, it was observed that the pre-treatment phase with electrolysis had a significant influence on the general performance of the treatment plant. The pre-treatment contributed to about 33.5% to 100% in the general contaminants’ removal efficiency. The highest contribution was observed from the total chlorine (100%), nitrate (98.2%), as well as BOD (95.3%). The lowest contribution was observed from the nitrite removal, with 33.5%. This study revealed further that the integration of electrolysis technology in a wastewater treatment system has a significant potential for developing an effective wastewater treatment plant.

1997 ◽  
Vol 35 (6) ◽  
pp. 63-70 ◽  
Author(s):  
Yoshimasa Watanabe ◽  
Yoshihiko Iwasaki

This paper describes a pilot plant study on the performance of a hybrid small municipal wastewater treatment system consisting of a jet mixed separator(JMS) and upgraded RBC. The JMS was used as a pre-treatment of the RBC instead of the primary clarifier. The treatment capacity of the system was fixed at 100 m3/d, corresponding to the hydraulic loading to the RBC of 117 L/m2/d. The effluent from the grid chamber at a municipal wastewater treatment plant was fed into the hybrid system. The RBC was operated using the electric power produced by a solar electric generation panel with a surface area of 8 m2 under enough sunlight. In order to reduce the organic loading to the RBC, polyaluminium chloride(PAC) was added to the JMS influent to remove the colloidal and suspended organic particles. At the operational condition where the A1 dosage and hydraulic retention time of the JMS were fixed at 5 g/m3 and 45 min., respectively, the average effluent water quality of hybrid system was as follows: TOC=8 g/m3, Total BOD=8 g/m3, SS=8 g/m3, Turbidity=6 TU, NH4-N=7 g/m3, T-P=0.5 g/m3. In this operating condition, electric power consumption of the RBC for treating unit volume of wastewater is only 0.07 KWH/m3.


1990 ◽  
Vol 22 (7-8) ◽  
pp. 153-160 ◽  
Author(s):  
Pradeep Kumar ◽  
R. J. Garde

With increasing stress on existing wastewater treatment systems, it is necessary either to upgrade the treatment unit(s) or install an entirely new treatment plant. Obviously, the upgrading is preferred over the alternative of having a new system. Keeping this in view, in the present project, an attempt has been made to explore the possibility of upgrading existing facultative ponds using water hyacinth. Bench-scale batch studies were designed to compare the performance of hyacinth treatment system with facultative ponds. Investigations were carried out with synthetic wastewater having COD in the range of 32.5-1090 mg/l. The efficiency of COD removal in water hyacinth ponds was 15-20 percent more than the facultative ponds. Based on the results, an empirical model has been proposed for COD removal kinetics. In the second phase of the project a hyacinth pond was continuously operated. BOD, COD, TS, TN, TP, pH, and DO were regularly monitored. However, the DO of the effluent from hyacinth treatment system was considerably reduced. Effluent should be aerated before it is discharged. The results indicate that the existing facultative ponds can be stalked with water hyacinth to improve their performance as well as hyacinth treatment systems can be installed to support the conventional treatment.


2012 ◽  
Vol 65 (4) ◽  
pp. 589-595 ◽  
Author(s):  
A. Ouali ◽  
H. Jupsin ◽  
J. L. Vasel ◽  
L. Marouani ◽  
A. Ghrabi

Korba wastewater treatment plant is a conventional activated sludge followed by three maturation ponds (MP1, MP2, MP3) in series acting as a tertiary treatment. The first study of wastewater treatment plants showed that the effluent concentration of Escherichia coli and enterococci at the outlet of the (MP3) varies between 103 and 104CFU/100 ml. After the hydrodynamic study conducted by Rhodamine WT which showed short-circuiting in the MP1, two baffles were introduced in the first maturation pond (MP1) to improve the hydrodynamic and the sanitary performances. The second hydraulic study showed that the dispersion number ‘d’ was reduced from 1.45 to 0.43 by this engineering intervention and the Peclet number was raised from 0.69 to 2.32. The hydraulic retention time was increased by 14 h. Because of well-designed baffles, the removal efficiency of E. coli and enterococci was raised between 0.2 and 0.7 log units for the first maturation pond.


2017 ◽  
Vol 28 (4) ◽  
pp. 477-489 ◽  
Author(s):  
Daiane Cristina de Oliveira Garcia ◽  
Liliane Lazzari Albertin ◽  
Tsunao Matsumoto

Purpose The purpose of this paper is to evaluate the efficiency of a duckweed pond in the polishing of a stabilization pond effluent, as well as quantify its biomass production. Once an adequate destination is given to the produced biomass, the wastewater treatment plant can work in a sustainable and integrated way. Design/methodology/approach The duckweed pond consisted of a tank with volume 0.44 m3, operating in continuous flow with an outflow of 0.12 m3/day and hydraulic retention time of 3.8 days. Effluent samples were collected before and after the treatment, with analyzes made: daily-pH, dissolved oxygen and temperature; twice a week – total nitrogen (TN), total phosphorus (TP) and chemical oxygen demand (COD); and weekly – total solids (TS) and Biochemical Oxygen Demand (BOD5). The duckweeds were collected each for seven days for its production quantification. Findings The highest efficiency of TN, TP, COD, BOD5 and TS removal were of 74.67, 66.18, 88.12, 91.14 and 48.9 percent, respectively. The highest biomass production rate was 10.33 g/m2/day in dry mass. Research limitations/implications There was great variation in biomass production, which may be related to the stabilization pond effluent conditions. The evaluation of the effluent composition, which will be treated with duckweeds, is recommended. Practical implications The evaluated treatment system obtained positive results for the reduction in the analyzed variables concentration, being an efficient technology and with operational simplicity for the domestic effluent polishing. Originality/value The motivation of this work was to bring a simple system of treatment and to give value to a domestic wastewater treatment system in a way that, at the same time the effluent polluter level is reduced and it is also possible to produce biomass during the treatment process.


2018 ◽  
Vol 9 ◽  
pp. 294-302 ◽  
Author(s):  
Agmar Ferreira ◽  
Kátia C. Fagnani ◽  
Helton J. Alves ◽  
Leda M.S. Colpini ◽  
Sheila S. Kunh ◽  
...  

2019 ◽  
Vol 24 (1) ◽  
pp. 135-163
Author(s):  
Jader Martínez Girón ◽  
Jenny Vanessa Marín-Rivera ◽  
Mauricio Quintero-Angel

Population growth and urbanization pose a greater pressure for the treatment of drinking water. Additionally, different treatment units, such as decanters and filters, accumulate high concentrations of iron (Fe) and manganese (Mn), which in many cases can be discharged into the environment without any treatment when maintenance is performed. Therefore, this paper evaluates the effectiveness of vertical subsurface wetlands for Fe and Mn removal from wastewater in drinking water treatment plants, taking a pilot scale wetland with an ascending gravel bed with two types of plants: C. esculenta and P. australis in El Hormiguero (Cali, Colombia), as an example. The pilot system had three upstream vertical wetlands, two of them planted and the third one without a plant used as a control. The wetlands were arranged in parallel and each formed by three gravel beds of different diameter. The results showed no significant difference for the percentage of removal in the three wetlands for turbidity (98 %), Fe (90 %), dissolved Fe (97 %) and Mn (98 %). The dissolved oxygen presented a significant difference between the planted wetlands and the control. C. esculenta had the highest concentration of Fe in the root with (103.5 ± 20.8) µg/g ; while P. australis had the highest average of Fe concentrations in leaves and stem with (45.7 ± 24) µg/g and (41.4 ± 9.1) µg/g, respectively. It is concluded that subsurface wetlands can be an interesting alternative for wastewater treatment in the maintenance of drinking water treatment plants. However, more research is needed for the use of vegetation or some technologies for the removal or reduction of the pollutant load in wetlands, since each drinking water treatment plant will require a treatment system for wastewater, which in turn requires a wastewater treatment system as well.


2012 ◽  
Vol 428 ◽  
pp. 169-175
Author(s):  
Guo Kai Fu ◽  
Yi Yue Hu ◽  
Zhi Zhang

A reliable model for any wastewater treatment plant is essential in order to provide a tool for predicting its performance and to form a basis for controlling the operation of the process. This would minimize the operation costs and assess the stability of environmental balance. For the multi-variable, uncertainty, non-linear characteristics of the wastewater treatment system, a variable metric chaos optimization neural network (VMCNW) prediction model is established standing on the actual operation data in the wasterwater treatment system. The model overcomes several disadvantages of the conventional BP neural network. Namely:slow convergence, low accuracy and difficulty in finding the global optimum.The results of model calculation show that the predicted value can better match measured value,played a effect of simulating and predicting and be able to optimize the operation status. The establishment of the predicting model provide a simple and practical way for the operation and management in wastewater treatment plant,and have good research and engineering practical value.


Sign in / Sign up

Export Citation Format

Share Document