scholarly journals Photovoltaic solar power for a wastewater electrocoagulation prototype

Author(s):  
Luis Alberto Cantera-Cantera ◽  
Andrés Calvillo-Téllez

A photovoltaic solar power supply is presented; it supplies energy to the electrodes of a wastewater treatment prototype by electrocoagulation. The source will be able to supply three voltages levels 10, 20, and 30 volts, with a current of 1000 mA. The system consists of an array of solar panels and Nickel Metal batteries. The amount of energy to be supplied by the solar panels is estimated, the level of storage in batteries is calculated and fed to the electrocoagulation system. The results of an experiment that operates independently of the power supply line and that works in rural areas are presented.

2021 ◽  
Vol 227 ◽  
pp. 05004
Author(s):  
Ilhomjon Musaev ◽  
Abdujalol Bokiev ◽  
Mukhtaram Botirova

The article considers the possibility of using the surface of various reservoirs characteristic of regions when allocating land for lowpower solar power plants in Uzbekistan. When implementing low-power solar power plants in Uzbekistan, a certain amount of land resources is required (for installing solar panels). From the point of view of respect for natural capital (saving land resources), the method of installing solar panels directly above the surface of water basins based on the corresponding maps of water basins is technically and economically effective. The methodological basis of the research is the results of researchers work on the problems of land relations and land management. In the research, a systematic approach to the analysis of land use has been chosen, in which a variety of tools were used to determine the essence of the analyzed phenomena, processes and patterns. In recent years, industry has been rapidly developing in rural areas of the Yangiyul district of Tashkent Province of Uzbekistan. In this regard, the problems of effective use of land resources, especially targeted use of irrigated land, has become urgent. This means that in the future there will be problems when allocating land for the installation of low-power solar power plants.


2020 ◽  
Vol 67 (1) ◽  
pp. 16-21
Author(s):  
Sergey M. Bakirov ◽  
Sergey S. Eliseev

The modern level of agriculture is described by the introduction of renewable energy sources. New generation sprinkler machines are being put into production, in the power system of which solar panels are used. One of the factors that negatively affect the performance of solar cells in an open field is their dusting, which is formed as a result of dust storms and wind. Cleaning of the battery panels is carried out in various ways: manual, semi-automatic and automatic. Dust cleaning is included in maintenance. (Research purpose) The research purpose is to determine the conditions for performing the maintenance, which consists in cleaning solar panels in the field. (Materials and methods) Theoretical (analysis, hypothesis design), empirical (observation, testing), experimental (ascertaining experiment) methods has been used during research. (Results and discussion) The article describes an introduced parameter for estimating the level of dusting. The power loss indicator shows the ratio of the power of the dusted module to the power of the clean module. Unscheduled maintenance is affected by the distance of the solar module from the repair point, the power of the solar module, the loss from dusting, the frequency of maintenance and cost indicators. (Conclusions) It has been found the dependence of maintenance period of the solar module of the sprinkler machine on the distance to the sprinkler machine, to the point of maintenance and repair, the power loss coefficient in case of dusting of the solar module, the cost of performing maintenance, as well as the frequency of maintenance. Article describes the boundaries of the choice of operating mode of the sprinkler between unscheduled maintenance for cleaning the solar module and the acceptance of additional power of the sprinkler power supply system according to the criterion of minimum operating costs.


2021 ◽  
Vol 13 (4) ◽  
pp. 282-289
Author(s):  
I. V. Naumov ◽  
D. N. Karamov ◽  
A. N. Tretyakov ◽  
M. A. Yakupova ◽  
E. S. Fedorinovа

The purpose of this study is to study the effect of loading power transformers (PT) in their continuous use on their energy efficiency on a real-life example of existing rural electric networks. It is noted that the vast majority of PT in rural areas have a very low load factor, which leads to an increase in specific losses of electric energy when this is transmitted to various consumers. It is planned to optimize the existing synchronized power supply systems in rural areas by creating new power supply projects in such a way as to integrate existing power sources and ensure the most efficient loading of power transformers for the subsequent transfer of these systems to isolated ones that receive power from distributed generation facilities. As an example, we use data from an electric grid company on loading power transformers in one of the districts of the Irkutsk region. Issues related to the determination of electric energy losses in rural PT at different numerical values of their load factors are considered. A computing device was developed using modern programming tools in the MATLAB system, which has been used to calculate and plot the dependence of power losses in transformers of various capacities on the actual and recommended load factors, as well as the dependence of specific losses during the transit of 1 kVA of power through a power transformer at the actual, recommended and optimal load factors. The analysis of specific losses of electric energy at the actual, recommended and optimal load factors of PT is made. Based on the analysis, the intervals of optimal load factors for different rated power of PT of rural distribution electric networks are proposed. It is noted that to increase the energy efficiency of PT, it is necessary to reduce idling losses by increasing the load of these transformers, which can be achieved by reducing the number of transformers while changing the configuration of 0.38 kV distribution networks.


2010 ◽  
Vol 5 (4) ◽  
Author(s):  
X.M. Yang ◽  
A. Morita ◽  
I. Nakano ◽  
Y. Kushida ◽  
H. Ogawa

In Japan, night soil, or black water, was formerly used as fertilizer for agriculture. However, during the rapid economic growth that took place after 1960, chemical fertilizers began to be adopted for agriculture and night soil was almost abandoned. How to treat the excess of night soil then became a big challenge to tackle. From that time a variety of night soil treatment technologies have been developed and the Japanese government has actively promoted the construction of night soil treatment facilities all over the country. As measures for domestic wastewater treatment, sewerage systems were spread in high-density urban areas, while a decentralized system called johkasou was diffused in rural areas with low population density. Johkasou is a unique system that was devised in Japan and mainly treats domestic wastewater on-site. Night soil treatment systems and decentralized wastewater treatment systems used in Japan are introduced in this paper, in the hope that the experience acquired in Japan will contribute to improve the sanitation conditions in other countries.


Author(s):  
B.T. Krishna ◽  
◽  
Shaik. mohaseena Salma ◽  

A flux-controlled memristor using complementary metal–oxide–(CMOS) structure is presented in this study. The proposed circuit provides higher power efficiency, less static power dissipation, lesser area, and can also reduce the power supply by using CMOS 90nm technology. The circuit is implemented based on the use of a second-generation current conveyor circuit (CCII) and operational transconductance amplifier (OTA) with few passive elements. The proposed circuit uses a current-mode approach which improves the high frequency performance. The reduction of a power supply is a crucial aspect to decrease the power consumption in VLSI. An offered emulator in this proposed circuit is made to operate incremental and decremental configurations well up to 26.3 MHZ in cadence virtuoso platform gpdk using 90nm CMOS technology. proposed memristor circuit has very little static power dissipation when operating with ±1V supply. Transient analysis, memductance analysis, and dc analysis simulations are verified practically with the Experimental demonstration by using ideal memristor made up of ICs AD844AN and CA3080, using multisim which exhibits theoretical simulation are verified and discussed.


Author(s):  
Petro Lezhnyuk ◽  
Iryna Hunko ◽  
Juliya Malogulko ◽  
Iryna Kotylko ◽  
Lіudmyla Krot

Urgency of the research. Current trends of distributed generation development in Ukraine indicate a rapid generation in-crease from renewable energy plants. Most developed countries gradually refuse from the fossil fuels use and invest more and more to the “green” energy. Therefore, there is a need for a detailed study of the operation conditions of distributed energy sources due to their instability, as well as the processes that arise in distribution electric networks with diverse types of distributed energy sources. Target setting. In the producing process of power energy by distributed energy sources due to the increase in their num-ber, there are situations where several renewable sources of energy operate to only one system of buses. Thus, such distributive networks acquire the features of a local power system, which complicates the control process of such systems, and also there is a problem with the electricity supply of consumers. Actual scientific researches and issues analysis. The analysis of publications suggests that in literature more attention is paid to studying the operating modes of solar power plants, or small hydroelectric power plants. However, almost no attention was paid to the study of their cooperation work. Uninvestigated parts of general matters defining. Only a few works are devoted to the study of the cooperation of the diverce sources of distributed energy sources in the local electrical systems. That is why, their impact on power distribution networks and on the grid in general has not been studied extensively. The research objective. In this article was considered the influence of asynchronous generators on small hydroelectric power plants on the operation modes of distribution electrical networks, and were investigated the processes that are occurring in local power systems with different types of distributed energy sources. The statement of basic materials. Based on the research results, was developed a computer model of a such system in the PS CAD software environment. Two solar stations and one small hydroelectric power station with an asynchronous generator were connected to the power supply. It was shown the simulation of two modes of operation: a joint operation of a small hydroelectric power station, two solar power stations and a power supply center; a joint operation of a small hydroelectric pow-er plant, two solar power stations and a power supply disconnected. Conclusions. As a result of computer simulation, it is shown that by switching on a small hydroelectric power plant with an asynchronous generator in the case of an emergency shutdown of centralized power supply, it is possible to restore the work of solar power plants, and thus partially or completely restore the power supply of consumers.