Determination of optimum location for flexible outrigger systems in tall buildings with constant cross section consisting of framed tube, shear core, belt truss and outrigger system using energy method
2017 ◽
Vol 17
(1)
◽
pp. 1-8
◽
Keyword(s):
Keyword(s):
2012 ◽
Vol 19
(4)
◽
pp. 727-738
◽
1978 ◽
Vol 36
(1)
◽
pp. 526-527
◽
1979 ◽
Vol 40
(C7)
◽
pp. C7-107-C7-108
Keyword(s):
Keyword(s):
Keyword(s):
2019 ◽
Keyword(s):
1990 ◽
Vol 29
(Part 1, No. 7)
◽
pp. 1372-1376
◽
Keyword(s):