scholarly journals Lightning Protection Improvement and Economic Evaluation of Thailand’s 24 kV Distribution Line Based on Difference in Grounding Distance of Overhead Ground Wire

2021 ◽  
Vol 2021 ◽  
pp. 1-14
Author(s):  
Pornchai Sestasombut ◽  
Atthapol Ngaopitakkul

This study determines the voltage across insulators after a direct lightning strike to an overhead ground wire on a 24 kV pole structure for different grounding distances of overhead ground wire, to calculate the maximum ground resistance required to avoid disruption of the distribution line system using ATP-EMTP software. The results show that when a 40 kA lightning current, the average lightning current in Thailand, strikes a 24 kV pole structure, the maximum ground resistance should not exceed 4 Ω for a 40 m grounding distance of overhead ground wire, based on an existing critical insulator flashover of 205 kV. However, because the average ground resistance in Thailand is approximately 10 Ω, this study proposes increasing the insulation level from 205 kV to 300 kV to reduce the likelihood of power outage. The cost-effectiveness of such an investment is assessed in terms of net present value (NPV), internal rate of return (IRR), profitability index (PI), and discounted payback period (DPP) using existing economic tools. Results show that when the critical insulator flashover is increased from 205 kV to 300 kV for a 40 m grounding distance of overhead ground wire, the project is likely to have a DPP of 15.12 years, NPV of 143,321.87 USD, IRR of 12%, and PI of 1.15. On the other hand, grounding distances greater than 40 m for overhead ground wire result in negative NPV, although the back flashover rate can be reduced by 1.51–5.71% with grounding distances of 80–200 m compared to the situation in the absence of grounding.

Energies ◽  
2019 ◽  
Vol 12 (16) ◽  
pp. 3193 ◽  
Author(s):  
Pornchai Sestasombut ◽  
Atthapol Ngaopitakkul

This paper evaluates the effect of a lightning strike directly on the 24 kV distribution lines in Thailand, where such strikes are one of the main causes of power outages. The voltage across the insulator, and the arrester energy absorbed due to the lightning, need to be analyzed for different grounding distances of the overhead ground wire, ground resistance, lightning impact positions, and lightning current waveforms. Analysis and simulations are conducted using the Alternative Transients Program/Electromagnetic Transients Program (ATP/EMTP) to find the energy absorbed by the arrester and the voltages across the insulator. The results indicate that when surge arresters are not installed, the voltage across the insulator at the end of the line is approximately 1.4 times that in the middle of the line. In addition, the ground resistance and grounding distance of the overhead ground wire affect the voltage across the insulator if the overhead ground wire is struck. When surge arresters are installed, a shorter grounding distance of the overhead ground wire and a lower ground resistance are not always desirable; this is because they reduce the back-flashover rate and the voltage across the insulator if lightning strikes the overhead ground wire. However, lightning strikes to the phase conductor result in high arrester energy and the possibility that the arrester will fail. Furthermore, the tail time of the lightning waveform is a significant variable when considering the energy absorbed by the arrester, whereas the front time is important for the voltage across the insulator. In case lightning strikes directly on the connected point between the overhead lines and the underground cables, the distribution line system is protected only by the lightning arrester at the connection point. The overvoltage at the connection point is lower than the basic impulse level at 24 kV of 125 kV, but the overvoltage at the end of the cable is still more than 125 kV in case the cable is longer than 400 m. When the distribution line system is protected by the lightning arrester at both the connection point and the end of the cable, it results in overvoltage throughout the cable is lower than the critical flashover of insulation. This method is the best way to reduce the failure rate of underground cables and equipment that are connected to the distribution line system.


Author(s):  
Nataliya Stoyanets ◽  
◽  
Mathias Onuh Aboyi ◽  

The article defines that for the successful implementation of an innovative project and the introduction of a new product into production it is necessary to use advanced technologies and modern software, which is an integral part of successful innovation by taking into account the life cycle of innovations. It is proposed to consider the general potential of the enterprise through its main components, namely: production and technological, scientific and technical, financial and economic, personnel and actual innovation potential. Base for the introduction of technological innovations LLC "ALLIANCE- PARTNER", which provides a wide range of support and consulting services, services in the employment market, tourism, insurance, translation and more. To form a model of innovative development of the enterprise, it is advisable to establish the following key aspects: the system of value creation through the model of cooperation with partners and suppliers; creating a value chain; technological platform; infrastructure, determine the cost of supply, the cost of activities for customers and for the enterprise as a whole. The system of factors of influence on formation of model of strategic innovative development of the enterprise is offered. The expediency of the cost of the complex of technological equipment, which is 6800.0 thousand UAH, is economically calculated. Given the fact that the company plans to receive funds under the program of socio-economic development of Sumy region, the evaluation of the effectiveness of the innovation project, the purchase of technological equipment, it is determined that the payback period of the project is 3 years 10 months. In terms of net present value (NPV), the project under study is profitable. The project profitability index (PI) meets the requirements for a positive decision on project implementation> 1.0. The internal rate of return of the project (IRR) also has a positive value of 22% because it exceeds the discount rate.


Animals ◽  
2021 ◽  
Vol 11 (5) ◽  
pp. 1297
Author(s):  
Juntae Kim ◽  
Hyo-Dong Han ◽  
Wang Yeol Lee ◽  
Collins Wakholi ◽  
Jayoung Lee ◽  
...  

Currently, the pork industry is incorporating in-line automation with the aim of increasing the slaughtered pork carcass throughput while monitoring quality and safety. In Korea, 21 parameters (such as back-fat thickness and carcass weight) are used for quality grading of pork carcasses. Recently, the VCS2000 system—an automatic meat yield grading machine system—was introduced to enhance grading efficiency and therefore increase pork carcass production. The VCS2000 system is able to predict pork carcass yield based on image analysis. This study also conducted an economic analysis of the system using a cost—benefit analysis. The subsection items of the cost-benefit analysis considered were net present value (NPV), internal rate of return (IRR), and benefit/cost ratio (BC ratio), and each method was verified through sensitivity analysis. For our analysis, the benefits were grouped into three categories: the benefits of reducing labor costs, the benefits of improving meat yield production, and the benefits of reducing pig feed consumption through optimization. The cost-benefit analysis of the system resulted in an NPV of approximately 615.6 million Korean won, an IRR of 13.52%, and a B/C ratio of 1.65.


2007 ◽  
Vol 56 (5) ◽  
pp. 175-182 ◽  
Author(s):  
R. Hochstrat ◽  
D. Joksimovic ◽  
T. Wintgens ◽  
T. Melin ◽  
D. Savic

The reuse of upgraded wastewater for beneficial uses is increasingly adopted and accepted as a tool in water management. However, funding of schemes is still a critical issue. The focus of this paper is on economic considerations of water reuse planning. A survey of pricing mechanisms for reclaimed water revealed that most schemes are subsidised to a great extent. In order to minimise these state contributions to the implementation and operation of reuse projects, their planning should identify a least cost design option. This also has to take into account the established pricing structure for conventional water resources and the possibility of gaining revenues from reclaimed water pricing. The paper presents a case study which takes into account these aspects. It evaluates different scheme designs with regard to their Net Present Value (NPV). It could be demonstrated that for the same charging level, quite different amounts of reclaimed water can be delivered while still producing an overall positive NPV. Moreover, the economic feasibility and competitiveness of a reuse scheme is highly determined by the cost structure of the conventional water market.


2018 ◽  
Vol 13 (3) ◽  
pp. 244
Author(s):  
Laura Broccardo ◽  
Luisa Tibiletti ◽  
Pertti Vilpas

This study investigates how balancing internal and external financing sources can create economic value. We set a financial scorecard, consisting of the Cost of Debt (COD), Return on Investment (ROI), and the Cost of Equity (COE). We show that COE should be a cap for COD and a floor for ROI in order to increase the Net Present Value at Weighted Average Cost of Capital and the Adjusted Present Value of the levered investment. However, leverage should be carefully monitored if COD and ROI go off the grid. Situations where leverage has the opposite effect on value creation and the Equity Internal Rate of Return are also discussed. Illustrative examples are given. The proposed model aims to help corporate management in financial decisions.


2018 ◽  
Vol 197 ◽  
pp. 11001
Author(s):  
Aristo Adi Kusuma ◽  
Putu Agus Aditya Pramana ◽  
Brian Bramantyo S.D.A. Harsono ◽  
Buyung Sofiarto Munir

Based on Java-Bali grid disturbance data, the 66kV transmission lines that is close to or intersect with 150kV or 500kV transmission line is often experienced earth fault due to insulator flashover. The insulator flashover can be caused by indirect lightning strike since lightning strikes tend to strike higher structure. Therefore, this paper will determine the effect of indirect lightning strike on 150kV or 500kV transmission line to 66kV transmission line by modeling and simulation using application of transient analysis. Variation of lightning peak current magnitude and gap between 66kV transmission line and transmission line with higher voltage is performed during simulation. The range of peak current magnitude follows the data from lightning detection systems, while the value of gap follows the data from actual condition. It is found that higher current peak and closer gap will cause higher transient overvoltage on insulator of 66kV transmission line thus insulator flashover may occur more frequent. Addition of earth wire on 66kV transmission line and gap between each transmission by organizing the sag of conductor can be performed to minimize the insulator flashover.


2019 ◽  
Vol 3 (2) ◽  
pp. 146
Author(s):  
Nur Rahmani ◽  
Akmal Lazuardy

The fish shelter port (TPI) is a need that needs to be prepared by local village officials and the government for every coastal village in Bengkalis Regency. This research was conducted in the Berancah village of Bantan District. The analysis in this study describes the economic feasibility mathematically for the construction of a fish storage port (TPI) by calculating the cost ratio (B / C ratio) benefit analysis, payback period (PP), net present value (NPV), and internal rate of return ( IRR). The results obtained from the NPV value (3,661,267,645), BCR value (0.943), IRR value of 10.01%, and PP are in the period of 30 years. Taken as a whole by standardizing the calculations, it can be concluded that the planned construction of a fish shelter in Berancah village is considered not economically feasible, but economic analysis is not merely a benchmark for feasibility, reviewed for the future many benefits will be received by the community around the location of the development plan so that it can improve the welfare of the community in Berancah village.


Agrikultura ◽  
2018 ◽  
Vol 29 (3) ◽  
pp. 144
Author(s):  
Wahyu K Sugandi ◽  
Asep Yusuf

ABSTRACTEconomic analysis reel type cutting machine for elephant grassThe need grass for fodder in the region Lembang has been increasing, but it does not followed byits quality. Therefore, cutting machine which is able to cut the fodder no more than 5 cm size is needed. The Laboratory of Agricultural Machinery and Machinery Department of Agricultural Engineering and Biosystem FTIP Unpad had been developed an elephant grass enchant machine inaccordance with the requirements of making the silage, but no economic feasibility analysis has been done for the machine. Therefore it was necessary to study the economic feasibility analysis of elephant grass cutting machine. The method used in this study was the economic analysis methodwhich includes the cost of production and the breakeven point, and business feasibility including net present value (NPV), benefit cost ratio analysis (BCR), internal rate of return (IRR) and payback period analysis (PBP). The results showed that the cost of production of elephant grass enemies was Rp 2,178 / kg with production breakeven 18.769 kg, BC ratio of 1.15, NPV1 of Rp 70,770, - NPV2 of Rp 61.333, - IRR of 27% and payback period during 2 months. So it can be concluded that the use of elephant-type elephant chopper machine was feasible to use.Keywords: Elephant grass, economic analysis, cutting machineABSTRAKKebutuhan rumput gajah untuk pakan ternak (silase) di daerah Lembang terus meningkat. Syarat pembuatan silase tersebut bahwa panjang potongan rumput gajah sebaiknya < 5 cm. Untuk itudiperlukan sebuah mesin pencacah rumput gajah sesuai syarat pembuatan silase. LaboratoriumAlat dan Mesin Pertanian Departemen Teknik Pertanian dan Biosistem FTIP Unpad telah mengembangkan sebuah mesin pencacah rumput gajah sesuai syarat pembuatan silase tersebut, tetapi belum dilakukan analisis kelayakan ekonomi untuk mesin tersebut. Oleh karena itdiperlukan suatu penelitian berkenaan dengan analisis kelayakan ekonomi mesin pencacah rumput gajah. Metode yang digunakan pada penelitian ini adalah metode analisis ekonomi yang meliputi biaya pokok produksi dan titik impas, serta kelayakan usaha yang meliputi net present value(NPV), benefit cost ratio analysis (BCR), internal rate of return (IRR) dan payback period analysis(PBP). Hasil penelitian menunjukkan bahwa biaya pokok produksi mesin pencacah rumput gajah adalah Rp 2.178/kg dengan titik impas produksi 18.769 kg, BC rasio sebesar 1,15, NPV1 sebesar Rp 70.770,- NPV2 = Rp 61.333,- IRR sebesar 27% dan payback period selama 2 bulan. Maka dapat disimpulkan bahwa pengunaan mesin pencacah rumput gajah tipe reel layak digunakan. Kata Kunci : Rumput Gajah, Analisis Ekonomi, Mesin Pencacah


Author(s):  
P. Leach ◽  
B.P. von der Heyden ◽  
P. Ravenscroft

SYNOPSIS Because of their high degree of geological complexity, kimberlite-hosted diamond deposits are exceedingly difficult to evaluate for economic viability. Accordingly, standard mineral asset evaluation protocols (e.g., the Cost-, Market-, and Income Approaches defined in the SAMREC Code) may not hold sufficient predictive abilities for these deposit types, especially at the early stages of exploration. Here we present a novel tool, a cost filter approach towards preliminary evaluation of economic viability of southern African kimberlite-hosted diamond deposits, using the AK6 and BK11 diamond deposits from the Orapa diamond field as case studies. The development of this cost filter is underpinned by elements of both the Market Approach (i.e., comparisons to similar deposits) and the Income Approach (i.e., use of net present value (NPV) calculations) for mineral asset evaluation. Importantly, the cost filter is constrained through modification of only two primary variables (the average diamond value and the diamond grade) and thus differs significantly from other cost filters that rely on estimation and assumptions for every parameter input into an NPV calculation. The cost filter correctly predicts the sub-economic status of the BK11 diamond pipe, and is thus presented as a useful geo-economic tool for early stage kimberlite evaluation within the local southern African context. The approach and its theoretical underpinning foreseeably hold vast potential for use in the economic evaluation of other ore commodities, particularly where socio-economic and political risk factors can be negated by employing a geographic constraint. Keywords: diamond, economic viability, kimberlites, southern Africa, cost models filter.


Author(s):  
FADHILLAH KUSUMA RAHAYU ◽  
SYARIFAH AIDA

The purposes of this research were to determine the cost, revenue, and profit of fruit seedling marketing and the feasibility of marketing business of fruit seedling at the CV. Flora Chania in Palaran Subcity, Samarinda City. This research was conducted during 3 months from March to May 2019. The data were collected secondary data. The analysis included calculation of cost, revenue, profit, Net Present Value (NPV), Internal Rate of Return (IRR), Net Benefit Cost Ratio (Net B/C Ratio), dan payback period. The research results showed an average operational cost of IDR248,945,720.00 year-1 or IDR20,745,477.00 month-1, an average revenue of IDR349,900,000.00 year-1 or IDR29,083,333.00 month-1 and the average income of IDR100,818,566.00 year-1 or IDR8,326,547.00 month-1. This research found  the NPV value of IDR37,464,538.00 at a factor discount rate of 10%, IRR value of 4.6%, Net B/C Ratio value of 1.32, while the payback period of 1 year and 4 months. The results of this research  indicate that based on an assessment of technical aspect, management and legal aspects, market and marketing aspects, and financial aspect, the marketing of fruit seedling is feasible to be developed. 