scholarly journals Pollutant removal and growth dynamics of macrophyte species for faecal sludge treatment with constructed wetland technology

2019 ◽  
Vol 80 (6) ◽  
pp. 1145-1154
Author(s):  
Agyemang Richard Osei ◽  
Yacouba Konate ◽  
Felix Kofi Abagale

Abstract Constructed wetland technology is an innovative engineering technique for faecal sludge (FS) management. The presence of emergent macrophytes enhances the important processes of evapotranspiration, sludge mineralisation, and contaminant reduction. Consequently, selecting a species that can withstand the difficult sludge contaminated conditions within a local context is vital. This study monitored the pollutant removal potentials and growth dynamics of Bambusa vulgaris and Cymbopogon nardus as promising macrophytes for the constructed wetland technology in the Sudano-Sahelian context. The experiment, at pilot scale, consisted of plastic reactors (27 litre) filled with filter media of sand and fine gravels at the base, and planted with the selected species. Pollutant removal efficiencies were evaluated based on differences between influent and effluent concentrations, and physiological growth parameters of plant height, number of leaves and number of plants were monitored monthly. Total annual sludge loading rate of 31.4 and 103.4 kg TS/(m2·yr) (TS: total solids) were determined for FS + wastewater (acclimatisation phase) and FS load respectively. Both species recorded appreciable pollutant removal efficiency >80% for the organic (chemical oxygen demand), nutrients (PO43_P and NH4-N) and solid (total suspended solids and total volatile solids) contents. The species thus demonstrated satisfactory performance of resistance for faecal polluted wetland conditions.

1995 ◽  
Vol 32 (3) ◽  
pp. 87-93 ◽  
Author(s):  
P. R. Thomas ◽  
P. Glover ◽  
T. Kalaroopan

Pilot scale investigations were carried out to examine the pollutant removal efficiency of a constructed wetland receiving secondary treated sewage effluent. Four constructed wetland cells were established, three of them planted with either Schoenoplectus validus, Juncus ingens or both species of macrophytes, and the fourth serving as an unvegetated control cell. Although there was a significant improvement in the effluent quality during the initial ten month period of monitoring, results to date have not indicated any overall trend for pollutant removal by a particular plant species. Biochemical oxygen demand and chemical oxygen demand removals averaged between 71-75% while suspended solids removals were around 85% in the macrophyte cells. Ammonia reductions were in the range 17-24% but better nitrate reductions between 65-80% were obtained. Phosphorus removal has been low (13%) in all four of the wetland cells and bore hole samples have shown no groundwater contamination with nitrogen or phosphorus from the wetland system to date.


2020 ◽  
Vol 7 (2) ◽  
pp. 70-74
Author(s):  
Fidelis C. Nkeshita ◽  
A. A. Adekunle ◽  
R. B. Onaneye ◽  
O. Yusuf

Wastewater from abattoir sources in urban areas can adversely affect the environment and cause health problems. This research investigated the ability of a bamboo constructed wetland system (BCWS) using Bambusa vulgaris, to treat wastewater from abattoir by removing nutrients and organics. This study adopted pilot scale reactors with bed dimension of 1 m length x 1 m width x 1 m depth to simulate a horizontal sub-surface flow constructed wetland and planted with six strands of bamboo plants. Parameters analyzed include the nutrients (in the form of phosphate and nitrate) and the organics (in the form of Chemical oxygen demand, COD and Biochemical oxygen demand, BOD). The effluent analysis that were carried out within a 28-day retention period showed that there was a very good decrease in the nutrient pollutant parameters; phosphate (99.6 %), nitrate (98.5 %). The organics showed a lesser performance with a 39.3 % removal efficiency for COD and 49.9 % removal efficiency for BOD. Bamboo can be used in a BCWS for low cost green technology in urban areas and can be improved upon by increasing the number of bamboo shoot in order to have a larger root system.


2015 ◽  
Vol 71 (7) ◽  
pp. 1088-1096 ◽  
Author(s):  
B. Kim ◽  
M. Gautier ◽  
G. Olvera Palma ◽  
P. Molle ◽  
P. Michel ◽  
...  

The aim of this study was to characterize the efficiency of an intensified process of vertical flow constructed wetland having the following particularities: (i) biological pretreatment by trickling filter, (ii) FeCl3 injection for dissolved phosphorus removal and (iii) succession of different levels of redox conditions along the process line. A pilot-scale set-up designed to simulate a real-scale plant was constructed and operated using real wastewater. The influences of FeCl3 injection and water saturation level within the vertical flow constructed wetland stage on treatment performances were studied. Three different water saturation levels were compared by monitoring: suspended solids (SS), total phosphorus (TP), dissolved chemical oxygen demand (COD), ammonium, nitrate, phosphate, iron, and manganese. The results confirmed the good overall efficiency of the process and the contribution of the trickling filter pretreatment to COD removal and nitrification. The effects of water saturation level and FeCl3 injection on phosphorus removal were evaluated by analysis of the correlations between the variables. Under unsaturated conditions, good nitrification and no denitrification were observed. Under partly saturated conditions, both nitrification and denitrification were obtained, along with a good retention of SSs. Finally, under saturated conditions, the performance was decreased for almost all parameters.


2018 ◽  
Vol 78 (11) ◽  
pp. 2374-2382 ◽  
Author(s):  
Van Tai Tang ◽  
Kannan Pakshirajan

Abstract Common porous concrete templates (CPCT) and advanced porous concrete templates (APCT) were employed in this study to construct wetlands for their applications in pollutant removal from storm runoff. The planting ability of the concrete was investigated by growing Festuca elata plants in them. Strength of the porous concrete (7.21 ± 0.19 Mpa) decreased by 1.8 and 4.9% over a period of six and 12 months, respectively, due to its immersion in lake water. The height and weight of Festuca elata grass growth on the porous concrete were observed to be 12.6–16.9 mm and 63.4–95.4 mg, respectively, after a duration of one month. Advanced porous concrete template based constructed wetland (APCT-CW) showed better removal of chemical oxygen demand (COD) (49.6%), total suspended solids (TSS) (58.9), NH3-N (52.4%), total nitrogen (TN) (47.7%) and total phosphorus (TP) (45.5%) in storm water, when compared with the common porous concrete template based constructed wetland (CPCT-CW) with 20.6, 29.8, 30.1, 35.4 and 26.9%, respectively. The removal of Pb, Ni, Zn by the CPCT-CW unit were 28.9, 33.3 and 42.3%, respectively, whereas these were 51.1, 62.5 and 53.8%, respectively, with the APCT-CW unit. These results demonstrate that the advanced porous concrete template in constructed wetland could be employed successfully for the removal of pollutants from urban storm water runoff.


Water ◽  
2018 ◽  
Vol 10 (10) ◽  
pp. 1445 ◽  
Author(s):  
Michał Marzec ◽  
Krzysztof Jóźwiakowski ◽  
Anna Dębska ◽  
Magdalena Gizińska-Górna ◽  
Aneta Pytka-Woszczyło ◽  
...  

In this paper, the pollutant removal efficiency and the reliability of a vertical and horizontal flow hybrid constructed wetland (CW) planted with common reed, manna grass, and Virginia mallow were analyzed. The wastewater treatment plant, located in south-eastern Poland, treated domestic sewage at an average flow rate of 2.5 m3/d. The tests were carried out during five years of its operation (2014–2018). The following parameters were measured: biochemical oxygen demand (BOD5), chemical oxygen demand (COD), total suspended solids, total nitrogen, and total phosphorus. The results showed that more than 95% of BOD5, COD, and total phosphorus was removed in the tested CW system. The average effectiveness of removal of total suspended solids and total nitrogen exceeded 86%. A reliability analysis performed using the Weibull probability model showed that the removal reliability in the tested CW was very high for BOD5, COD, total suspended solids, and total phosphorus (100%). The probability that the total nitrogen concentration in the treated effluents would reach the limit value (30 mg/L) established for effluents discharged from a treatment plant of less than 2000 PE (population equivalent) to standing waters was 94%. The values of all the pollution indicators in wastewater discharged to the receiver were significantly lower than the limit values required in Poland. The investigated hybrid CW system with common reed, manna grass, and Virginia mallow guaranteed stable low values of BOD5, COD, total suspended solids, and total phosphorus in the treated wastewater, which meant it was highly likely to be positively evaluated in case of an inspection.


2011 ◽  
Vol 356-360 ◽  
pp. 2451-2458 ◽  
Author(s):  
Lei Zheng ◽  
Ai Zhong Ding ◽  
De Chuan Kong ◽  
Li Rong Cheng

The hydraulic characteristics of constructed wetland are vital to its performance for pollutant removal. Hydraulic characteristics of a pilot scale vertical flow constructed wetland were studied by tracer experiments with the method of moments (MoM) analyzing. From the residence-time distribution (RTD) of tracer during the experiment, the mean detention time, average water velocity and dispersion coefficients were obtained for the constructed wetland. The results showed that the mean residence time was approximately 15% shorter than nominal residence time indicating 85% of total available pore volume was active in pollutant removal processes. The two peaks observed on the RTD curves suggested short-circuiting flows or dead zones exist in the constructed wetland. The relatively large Peclet number of 11.8 suggested that dispersive processes dominated in the tracer movement. Comparison of tracer profiles at different sampling locations indicated that large amount of tracer transported through the upper portion of the constructed wetland.


2014 ◽  
Vol 69 (7) ◽  
pp. 1410-1418 ◽  
Author(s):  
Weijie Guo ◽  
Zhu Li ◽  
Shuiping Cheng ◽  
Wei Liang ◽  
Feng He ◽  
...  

To examine the performance of a constructed wetland system on stormwater runoff and domestic sewage (SRS) treatment in central east China, two parallel pilot-scale integrated constructed wetland (ICW) systems were operated for one year. Each ICW consisted of a down-flow bed, an up-flow bed and a horizontal subsurface flow bed. The average removal rates of chemical oxygen demand (CODCr), total suspended solids (TSS), ammonia (NH4+-N), total nitrogen (TN) and total phosphorus (TP) were 63.6, 91.9, 38.7, 43.0 and 70.0%, respectively, and the corresponding amounts of pollutant retention were approximately 368.3, 284.9, 23.2, 44.6 and 5.9 g m−2 yr−1, respectively. High hydraulic loading rate (HLR) of 200 mm/d and low water temperatures (<15 °C) resulted in significant decrease in removals for TP and NH4+-N, but had no significant effects on removals of COD and TSS. These results indicated that the operation of this ICW at higher HLR (200 mm/d) might be effective and feasible for TSS and COD removal, but for acceptable removal efficiencies of nitrogen and phosphorus it should be operated at lower HLR (100 mm/d). This kind of ICW could be employed as an effective technique for SRS treatment.


2016 ◽  
Vol 74 (12) ◽  
pp. 2795-2806
Author(s):  
M. Manga ◽  
B. E. Evans ◽  
M. A. Camargo-Valero ◽  
N. J. Horan

The effect of sand filter media thickness on the performance of faecal sludge (FS) drying beds was determined in terms of: dewatering time, contaminant load removal efficiency, solids generation rate, nutrient content and helminth eggs viability in the dried sludge. A mixture of ventilated improved pit latrine sludge and septage in the ratio 1:2 was dewatered using three pilot-scale sludge drying beds with sand media thicknesses of 150, 250 and 350 mm. Five dewatering cycles were conducted and monitored for each drying bed. Although the 150 mm filter had the shortest average dewatering time of 3.65 days followed by 250 mm and 350 mm filters with 3.83 and 4.02 days, respectively, there was no significant difference (p > 0.05) attributable to filter media thickness configurations. However, there was a significant difference for the percolate contaminant loads in the removal and recovery efficiency of suspended solids, total solids, total volatile solids, nitrogen species, total phosphorus, chemical oxygen demand, dissolved chemical oxygen demand and biochemical oxygen demand, with the highest removal efficiency for each parameter achieved by the 350 mm filter. There were also significant differences in the nutrient content (NPK) and helminth eggs viability of the solids generated by the tested filters. Filtering media configurations similar to 350 mm have the greatest potential for optimising nutrient recovery from FS.


Author(s):  
Swapnil Hiwrale

The idea of the project is predicated on the methodology of preventing the wastewater and the way to form the water pure by using various techniques to form water purification. Nowadays the matter of water shortage increases especially we face the water problem in summer seasons only. we are designing and portable hybrid water solution for the treatment of wastewater during this study, pilot-scale hybrid constructed wetlands (CWs) and multistage horizontal subsurface flow CWs (HF CWs) are studied and compared for the treatment of raw urban wastewater. Additionally, the sand became clogged, while the mulch failed to. The effect of water height on the average pollutant removal wasn't determined but HF10 performed better regarding compliance with legal regulations. With this idea of the project, we could see how we will purify the wastewater and the way much we can see the index of the water purification. A survey of the magnitude of water-related stress at villages on the subject of a college campus or Maharashtra villages affects rural life. Especially in the summer seasons. Problems of availability, accessibility, and quality of Water In Maharashtra 17 districts are that which is laid low with water crises. Maharashtra had approved over R.s 7000 corer to complete the potable project in the scarcity hit area. In India 4% of water resources available from 18% water available in word. Wetland technology can provide cheap and effective wastewater treatment in both temperature and tropical climates and is suitable for adoption in both industrialized likewise as in developing nations this method is utilized for the removal of a range of pollutants and a broad verity of wastewater worldwide. it's one of the simplest methods to treated wastewater at source premises, effectively and economically. This general term accustomed describe different degrees of treatment, so as of skyrocketing treatment levels are preliminary, primary, secondary, and tertiary or advance wastewater treatment. Disinfection to get rid of pathogens sometimes follows the last treatment steps. After treatment of wastewater from constructed wetland reactor, 90 to 95% BOD is going to be satisfied than 85 to 90% Turbidity is going to be removed, and 70 to 80% Nutrient are going to be removed by phytoremediation method. Constructed wetland technology has played a vital role in achieving the changes in wastewater.


Author(s):  
Maria Cristina Collivignarelli ◽  
Marco Carnevale Miino ◽  
Franco Hernan Gomez ◽  
Vincenzo Torretta ◽  
Elena Cristina Rada ◽  
...  

In the coming years, water stress is destined to worsen considering that the consumption of water is expected to increase significantly, and climate change is expected to become more evident. Greywater (GW) has been studied as an alternative water source in arid and semiarid zones. Although there is no single optimal solution in order to treat GW, constructed wetlands proved to be effective. In this paper, the results of the treatment of a real GW by a horizontal flow constructed wetland (HFCW) for more than four months are shown. In the preliminary laboratory-scale plant, Phragmites australis, Carex oshimensis and Cyperus papyrus were tested separately and showed very similar results. In the second phase, pilot-scale tests were conducted to confirm the performance at a larger scale and evaluate the influence of hydraulic retention time, obtaining very high removal yields on turbidity (>92%), total suspended solids (TSS) (>85%), chemical oxygen demand (COD) (>89%), and five-day biological oxygen demand (BOD5) (>88%). Based on the results of the pilot-scale HFCW, a comparison with international recommendations by World Health Organization and European Union is discussed.


Sign in / Sign up

Export Citation Format

Share Document