scholarly journals Communication and Information Flow in Polish Construction Projects

2020 ◽  
Vol 12 (21) ◽  
pp. 9182
Author(s):  
Ewelina Kania ◽  
Elżbieta Radziszewska-Zielina ◽  
Grzegorz Śladowski

The objective of this paper is to analyse communication and information flow within construction projects on the basis of a survey study and a review of the literature. The subject of communication and its impact on carrying out a construction project is widely discussed in global academic literature. Many scholars point to problems with communication and information flow while also reporting that it directly affects construction project time and cost. In the literature, communication is also presented as an essential factor that improves safety and partnering in construction projects. There is also a group of studies that points to the lack of effective communication as the cause of delays and modifications. The authors, in reference to global studies, present the results of a survey study performed in Poland on a group of 160 construction industry practitioners. Information about five research areas was collected. These areas included: general information about communication and information flow between construction project participants, problems in carrying out construction projects in relation to the lack of effective communication, the impact of communication on the success of carrying out a construction project, communication costs, and the need to develop a tool (a digital system) that would support construction project managers in the optimal control over communication between project participants. On the basis of the obtained research results and the literature study, it was found that effective communication and information flow within a construction project can improve the construction process and that there exists a need to develop a comprehensive approach that would aid construction project managers in ensuring a more effective information flow.

Author(s):  
Mohd Affendi Ahmad Pozin ◽  
Mohd Nasrun Mohd Nawi ◽  
Md Azree Othuman Mydin ◽  
Salman Riazi Mehdi Riazi ◽  
Ayub Ilfandy Imran

In this article, we discuss about WhatsApp application practise around project managers in managing IBS construction projects. The WhatsApp application offera great advantages, especially in collecting, managing information and data in a timely manner. Previous study highlighted effective communication become as a bridge between practitioners to share a knowledge, information and integration. Unfortunately, there is still a lack of empirical studies on how efficiencies of WhatsApp application overcome the communication barriers while managing distributed project teams on construction project. Thus this study seeks to explore communication performance perceived through WhatsApp application. The semi-structured interview methodology was used to gain in-depth knowledge from several project managers who have experiences in managing construction projects virtually through WhatsApp application. The finding from this study revealed that WhatsApp application has become an effective communication channel to overcome the barriers of communication while managing distributed teams and allowing timely information sharing.


2021 ◽  
Vol 0 (0) ◽  
Author(s):  
Andre Feliks Setiawan ◽  
Seng Hansen ◽  
Antonius Fujiono

Abstract Effective communication is necessary for the success of construction project performance. Due to its nature, effective communication is required to coordinate all parties involved in construction projects such as owners, project managers, engineers, subcontractors, etc. Few previous studies have addressed the issues of construction project communication, particularly in the communication planning stage. This paper aimed to investigate how far the communication planning has been effectively implemented in several construction projects in Jakarta and measure how big the influence to project performance. It adopts a quantitative method by distributing questionnaire surveys to contractors and consultants in Jakarta. Descriptive statistics were used to analyse the data which presents that communication planning has been implemented by 78.02 % of the responses and significantly impact the project performances. This paper offers useful implications for practitioners on how construction project teams (from contractors and consultants) should carefully manage the communication process particularly during its planning stage.


2020 ◽  
Vol 10 (2) ◽  
pp. 103-115
Author(s):  
Kennedy Obondi

Risk audit is often poorly implemented in construction projects because of the absence of constant auditing of risks by construction project managers. Construction companies are experiencing large financial deficits because of managers failing to audit and monitor project risks. The purpose of this study was to examine whether the utilization of risk audit correlates with project success in construction projects. An electronic survey instrument was used to collect data from a sample of 50 construction project managers in the Dallas-Fort Worth area of Texas in the United States. Spearman's rho correlational analysis and simple logistic regressions were used to examine the relationship between risk audit and project success. The results of this study indicated that there is a positive and significant association between risk audit and project success in terms of schedule performance, cost performance, customer satisfaction, and business success. One of the recommendations presented in this study was to expand the study to developing countries to see whether the findings from the study remain the same. The study concluded that construction organizations should regularly consider the importance and usage of risk audit techniques to improve the success rate of a project.


2020 ◽  
Vol 38 (7A) ◽  
pp. 1069-1076
Author(s):  
Layth T. Ali ◽  
Raid S. Abid Ali ◽  
Zeyad S. M. Khaled

Cost overrun in construction projects is a common phenomenon in Iraq. This might occur due to diversity of factors. This study aims to identify the factors influencing construction projects cost that are potentially controllable by main contractors. A field study through a questionnaire survey was directed to a sample of related Iraqi professional engineers from general contracting companies at both public and private sectors. Their opinions on the impact and frequency of each factor were investigated. The questionnaire offered (59) factors classified in (8) categories namely; legislations, financial and economic, design, contractual, site management, material, labor and equipment. The factors were ranked according to the highest Relative Importance Index (RII). The study revealed (10) major factors that are potentially controllable by main contractors namely; labor productivity, sub-contractors and suppliers performance, equipment productivity, site organization and distribution of equipment, experience and training of project managers, scheduling and control techniques, planning for materials supply, planning for equipment supply, materials delivery and planning for skilled labor recruitment. Recommendations to aid contractors and owners in early identification of these factors are also included in this study.


2018 ◽  
Vol 49 ◽  
pp. 02020
Author(s):  
Hery Suliantoro ◽  
Nurul Fitriani ◽  
Bagus Hario Setiadji

Risk is a condition caused by uncertainty. Risks will occur on any construction project, including bridge construction projects. Efforts that can be taken to minimize the impact of these risks are to engage in risk management activities. This research was conducted on bridge construction work on toll road procurement project in Pejagan-Pemalang, Pemalang-Batang and Salatiga-Kertasura. The purpose of this research is to analyze the risk of bridge development project in toll road project using Risk Breakdown Structure (RBS) method and then the result as database in discussing risk response strategy. The bridge construction project has 36 risks that are divided into six groups: materials and equipment, design, human resources, finance, management, nature and environmental conditions. Bad weather risks are the higest risk and seasonal risk causing temporary work stoppages. This risk-response strategy is avoidance. Short-term avoidance response strategy is to add shift workers, install tents and add additives in the acceleration of the process of maturation of concrete. The long-term avoidance response strategy is to evaluate and rearrange the work schedule by considering the weather forecast report.


2016 ◽  
Vol 16 (3) ◽  
pp. 307-322 ◽  
Author(s):  
Hossein Karimi ◽  
Timothy R.B. Taylor ◽  
Paul M. Goodrum ◽  
Cidambi Srinivasan

Purpose This paper aims to quantify the impact of craft worker shortage on construction project safety performance. Design/methodology/approach A database of 50 North American construction projects completed between 2001 and 2014 was compiled by taking information from a research project survey and the Construction Industry Institute Benchmarking and Metrics Database. The t-test and Mann-Whitney test were used to determine whether there was a significant difference in construction project safety performance on projects with craft worker recruiting difficulty. Poisson regression analysis was then used to examine the relationship between craft worker recruiting difficulty and Occupational Safety and Health Administration Total Number of Recordable Incident Cases per 200,000 Actual Direct Work Hours (TRIR) on construction projects. Findings The result showed that the TRIR distribution of a group of projects that reported craft worker recruiting difficulty tended to be higher than the TRIR distribution of a group of projects with no craft worker recruiting difficulty (p-value = 0.004). Moreover, the average TRIR of the projects that reported craft worker recruiting difficulty was more than two times the average TRIR of projects that experienced no craft recruiting difficulty (p-value = 0.035). Furthermore, the Poisson regression analysis demonstrated that there was a positive exponential relationship between craft worker recruiting difficulty and TRIR in construction projects (p-value = 0.004). Research limitations/implications The projects used to construct the database are heavily weighted towards industrial construction. Practical implications There have been significant long-term gains in construction safety within the USA. However, if recent craft shortages continue, the quantitative analyses presented herein indicate a strong possibility that more safety incidents will occur unless the shortages are reversed. Innovative construction means and methods should be developed and adopted to work in a safe manner with a less qualified workforce. Originality/value The Poisson regression model is the first model that quantifiably links project craft worker availability to construction project safety performance.


2012 ◽  
Vol 226-228 ◽  
pp. 2253-2257
Author(s):  
Ren Hui Liu ◽  
Bo Yu

It is a nonlinear complex system for project emergency response system, that is a continuous process for the evolution of emergency construction project development process. The nonlinear differential equations that can describe the sudden emergency construction project the evolution of mathematical models. Emergency system by Logistic model was modified, taking into account the development of emergency systems will certainly be outside the system during the impact, combined with the project incidents of law principles of the role of Heinrich proposed TS-based emergency response system evolution equation Model, demonstrated the system at different stages of the emergency rules and features. For the emergency system in which the different stages of development, the corresponding measures to improve emergency response capabilities.


2012 ◽  
Vol 174-177 ◽  
pp. 3360-3363 ◽  
Author(s):  
Zhi Lu Zhen

Based on analyzing the complexity of construction projects, we established a collaborative management framework for complex construction project and presented the main content of collaborative management. The main content includes three parts, the first part is the collaborative management for system itself, the second part is to reduce the system complexity in order to reduce the difficulty of management and the last part is to reduce the complexity caused by the uncontrollable external environment. We can use the method of risk pre-assessment and take risk prevention measures to reduce the impact for collaborative management caused by the dynamic external environment.


2021 ◽  
Vol 56 (3) ◽  
pp. 473-484
Author(s):  
Zulkifli Lubis

The biggest threat that results in the project not being successful is failure to build a stakeholder project. Based on research on construction projects in developing countries, the lack of communication among workers due to cultural uniformity and the uniqueness of their respective regions can become work constraints that can affect implementation performance and productivity, namely, there is a 69.61% decrease in time performance. The main objective of this research is to analyze the role of communication management in improving the performance of construction project managers in developing countries, particularly the role of construction managers in implementing a construction project. This research uses a qualitative approach and a case study method. Sampling using purposive sampling. Forum Group Discussion to see how the opinions of construction project managers in Indonesia view the importance of communication management in the success of construction projects. The study results explain that the need for Public Relations Infrastructure management plays a role in ensuring various policies and communication to the public. This is a reflection of the effective function of public relations in the implementation of infrastructure development. In carrying out the construction, the construction project manager must pay attention to communication dynamics to support the success of infrastructure development projects. Contractors and other parties involved in infrastructure development must raise awareness of the essence of effective communication in fostering trust in the public concerned with infrastructure development.


2021 ◽  
Vol 236 ◽  
pp. 03002
Author(s):  
Yingying Wu

The Environmental Impact Assessment system, referred to as the EIA system, is to evaluate the impact of the implementation of the plan or the construction and operation of the project on the environment, combine the surrounding environmental quality status, propose ecological or environmental protection measures,then evaluate the effectiveness of the measures, and draw a conclusion on the feasibility of the project(planning) in terms of environmental protection.This article summarizes the role and progress in environmental protection in the two aspects of planning and construction projects in recent years.Comprehensively selected cases found that both planning or construction project environmental assessment have played an important role in predicting the possible impact of planning or construction projects on the environment and ecology, and proposed feasible and effective environmental protection measures.After the planning or construction project adopts the conclusions and suggestions, as long as the "Three Simultaneous" regulations are followed, the impact of the planning or construction project on the environment or ecology can be prevented or effectively reduced. When it is necessary to conduct postevaluation of environmental impact, verify the actual conditions of the construction project, such as emissions and actual production processes.