Review of recent developments on improvement of estimated regulatory documentation for road works

2021 ◽  
Vol 2021 (23) ◽  
pp. 31-42
Author(s):  
Anatolii Tsynka ◽  
◽  
Andrii Hrinchuk ◽  
Ivan Rakovych ◽  
◽  
...  

Introduction. In the modern conditions of the pricing system in the construction of Ukraine, the key value have the estimated norms, which are presented in separate collections, the main purpose of which is to determine the standard quantity of resources required to perform a particular type of work as a basis for the transition to the cost indicators. In order to determine the cost of road work objectively and accurately, it is essential that the indicators of estimated norms meet the requirements of regulatory documents and modern methods of execution of road works.Problematics. In connection with the active improvement of the regulatory base of the road construction industry, permanent upgrade of road organizations technique fleet, the introduction of new technologies and materials in construction and operation of roads, improving the methods of work there is a discrepancy between the existing resource element of estimated norms and the actual conditions of work in terms of built-up labor costs, the operation time of machines and mechanisms and the range of materials. Accordingly, it affects the reliability and accuracy of determining the cost of road works.Purpose. Improvement and harmonization with actual working conditions and requirements of regulatory documents of industry regulatory and estimate base of resource elementary estimated norms for work performed during construction, reconstruction, repair and operational maintenance of roads and bridges to ensure reliable and valid technical, economic and estimated calculations.Materials and methods. During work performance the analysis of the regulatory documentation, establishing the requirements to the technology of road works and materials has been carried out. A number of chronometric observations with the measurement of time of road works in full-scale conditions was carried out. The obtained data were summarized, averaged and on their basis the indicators of the resource element of the estimated norms were estimated.Results. A review of the main amendments and additions, which came into force after the approval of Amendment No 2 SOU 42.1-37641918-035:2018 [1] and Amendment No 2 SOU 42.1-37641918-071:2018 [2], which were developed to improve the regulatory-estimate base for the calculation of road works, taking into account the requirements and provisions of existing regulatory documents taking into account the current state of scientific and technological progress in the road sector.Conclusions. The above analysis of the amendments that came into force with the approval of [1]. and [2] will systematize the innovations provided by the requirements of current regulatory documents on the calculation of the cost of road works and the development of relevant documents at all stages of the investment process, planning and organization of road works, as well as the writing-off of material resources. Review and systematization of recent improvements in the estimated regulatory documents for road works will provide an opportunity to optimally plan the use of available material, labor and financial resources, often limited.Keywords: public road, operational maintenance, investment documentation, overhaul and current repairs, machine, mechanism, regulatory document, resource element estimate norm, Standard of Organization of Ukraine.

2020 ◽  
Vol 3 (1) ◽  
pp. 62-69 ◽  
Author(s):  
I. Odenbah

this article discusses some new modern technologies in the construction of highways. The paper analyzes the use of such innovations as: various modifiers added to bitumen; advanced technologies of engineering surveys and computer-aided design of highways; geosynthetic materials for reinforcing the roadbed and asphalt concrete pavement; PBB; bituminous polymer road belts; geotextile; foam-glass rubble; rubber crumb. The advantages of using innovations in road construction are highlighted. Obstacles to the use of certain technologies are noted, taking into account the Russian reality. The author concludes that the use of innovative materials becomes economically justified at the stage of construction and subsequent operation of the road surface. New technologies can not only improve the quality of roads, but also improve road safety. Innovations lead to progressive changes and ensure the dynamic development of the construction industry, primarily by reducing the cost and timing of construction, improving the quality of constructed facilities, and improving the comfort of living and operation. The paper discusses classical methods for the design works of the foundation and the GM made a review of modern structures and technologies on their device. In order to assess the possibility of using linear calculation for sheet piling fences, deep pit modeling was performed in the SCAD and PLAXIS software systems. The results of the work are the following conclusions: 1. the method of increasing the efficiency of technologies at the device walling of the pit is proposed; 2. a finite element model of soil and GM collaboration was created. To evaluate the effectiveness of the options, we used decision-making methods based on optimization criteria, taking into account the degree of risks involved in the work. It is established that the necessary factor is the geotechnical support of technological impacts, which allows monitoring of works on the degree of safety and impact on highways.


Author(s):  
Monika Siejka ◽  
Monika Mika

The development of the communication systems determines the economic level of the country. In Poland, despite the successive investments in this area, it is still not enough beneficial solutions to the road network and international calls. The problem of the acquisition of property for public roads on both the valuation principles and the way of obtaining land for these purposes is constantly modified. These changes are intended to simplify the procedures, which have a significant impact on shortening of the investment process. The current provisions of law give the possibility of the start of road investment before a property owner receives compensation for land taken for this purpose. This situation requires an inventory of component parts of the property for the purposes of their valuation. The paper presents the methodology of inventory the real estate components for the needs of their valuation using modern measurement techniques GNSS and GIS.


2019 ◽  
Vol 6 (3) ◽  
Author(s):  
Kabanov Aleksandr ◽  
Irina Kolos ◽  
Viktoriya Chernyaeva ◽  
Aleksey Ilin ◽  
Olga Medvedeva ◽  
...  

This article discusses the problems that arise in the operation of road structures. One of the most important is rutting. Indicators of resistance to rutting depend on the method of design of non-rigid pavement and operational parameters, which allows to obtain the applied method of volumetric design of asphalt mix «Superpave» (SP-19), which in our country was called «SPAS». The authors, together with the staff of the laboratory of asphalt Concrete plant – 1, monitored asphalt concrete mixtures designed according to the «Superpave» system on the asphalt mixing plant. Then tests were carried out according to the method of PNST 181-2016 on the susceptibility of asphalt concrete materials to shear deformations arising under the action of repeated passes of the loaded wheel at ambient temperature. The result of the study of rutting showed that the mixture SP-19 have predominantly traditional. More detailed research results are presented in this article. Based on the data obtained from the results, conclusions were formulated: the Studies show that the method of «Superpeyv» is updated to the requirements of technical supervision at the objects of the road complex of the Russian Federation. In conclusion, the authors have formulated conclusions on the research: a comparison of physical and mechanical performance of asphalt concrete mix SP-19 on PNST 114 and fine-grained asphalt concrete mix type A brand I shows that the shear stability in terms of the average depth of the track is higher for the brand SP-19 by 38 %; set the required mixing temperature and compaction of asphalt concrete mixture on the system «Superpeyv»; the release of a pilot batch of asphalt concrete mix of SP-19 brand at the production site of JSC «ABZ-1» showed that the recipe selected in the laboratory is reproduced in the ABZ; cores selected within the framework of technical supervision from the experimental coating and tested in the laboratory showed corresponding to the requirements of ODM 218.4.038-2017; assessment of economic efficiency at the cost of asphalt concrete mix of SP-19 brand showed a decrease of 2.2 % relative to the cost of fine-grained asphalt concrete mix; the increase in the service life of the road surface h 30–50 % by reducing rutting increases its turnaround time. At the same time, economic efficiency can reach 50 % per m2.


Author(s):  
А.Х. Мохамед ◽  
Н.А. Тюрин

Основной целью работы является оптимизация использования машин для земляных работ в строительстве лесных дорог по критерию минимума приведенных расходов, путем оптимального распределения комплектов машин по объектам строительства при условии возможности аренды какихлибо дополнительных машин. Создана экономикоматематическая модель расчета эффективной структуры парка машин с точки зрения системы производственной эксплуатации, которая складывается из эффектов всех специализированных комплектов машин и эффекта от передачи машин парка в аренду. Учет возможности передачи или получения техники в аренду позволяет улучшить техникоэкономические показатели эксплуатации парка машин. Результаты работы могут быть востребованы лесозаготовительными и дорожностроительными предприятиями в период проектирования производства земляных работ, обновления машинных парков, а также при выборе наилучшего варианта использования имеющегося парка, прогнозирования продолжительности и стоимости ведения механизированных работ. The main purpose of this work is to optimize the earthmoving machinery utilization in the forest road construction, by minimize the operating cost. That goal may achieve by the optimal distribution of the machine combination in the construction sites, with the ability of renting additional machines. Economical mathematical model has been developed for calculating the effective structure of the machine group to achieve the required productivity. The possibility of hire and rent machines allows the manager to improve the technical economic decision for the machines operation. By using the developed model it can gives good results to having better decisions for planning and designing the earth working operations in the road construction companies, renovation of the machine parks, as well as the choosing the best option for using the existing machine combination, predicting the duration and predicting the cost of the whole work.


2010 ◽  
Vol 56 (No. 3) ◽  
pp. 137-145 ◽  
Author(s):  
R. Ghaffariyan M ◽  
K. Stampfer ◽  
J. Sessions ◽  
T. Durston ◽  
CH. Kanzian ◽  
...  

&nbsp;To minimize the cost of logging, it is necessary to optimize the road density. The aim of this study was to determine optimal road spacing (ORS) in Northern Austria. The stepwise regression method was used in modelling. The production rate of tower yarder was 10.4 m<SUP>3</SUP>/PSHo (Productive system hours) and cost of 19.71 €.m<SUP>–3</SUP>. ORS was studied by calculating road construction cost, installation cost and yarding cost per m<SUP>3</SUP> for different road spacing. The minimum total cost occurred at 39.15 €.m<SUP>–3</SUP> and ORS would be 474 m assuming uphill and downhill yarding. The optimal road density and yarding distance are 21.1 m.ha<SUP>–1</SUP> and 90 m, respectively. A sample logging area was used to plan different roads and, using network analysis, the best solution was found based on a modified shortest path algorithm. The network analysis results were very different from the optimal road spacing results that assumed roads and logging corridors could be located anywhere in the planning area at a constant cost. Mixed integer programming was also used to get a real optimal solution.


Author(s):  
Eva Rita

In development and reconstruction of roads frequent changes work items, affecting the cost, turnaround time and quality of work. In order to determine what factors cause of the technical justification has conducted a study of eight packages of road construction and eight packages of reconstruction road capacity of West Sumatra in the unit Implementation of National Road Region I and Region II under  theNational Road Agency of West Sumatera Province. The work packages studied wasthe work conducted in 2009 to 2015. The method used was descriptive-evaluative research. Results of the study found the 7 causal factors do technical justification that the initial design of the contract is not in accordance with the results of the engineering field, not taking into account the design life of the road, , has not been calculated in detail the volume and the price for each item of work, do not pay attention to Standard Directorate general of Highways Ministry of public Works, the land is not available when the project is implemented, the results of field surveys for planning is not complete, and the occurrence of overlapping projects between the state and local budgets. To eliminate the occurrence of increased costs due to technical justification is necessary to complete the field survey by calculating in detail the volume and the price for each work item.


2019 ◽  
Vol 6 (1) ◽  
Author(s):  
Andrey Kochetkov ◽  
Natal’ya Shchegoleva ◽  
Sergey Korotkovskiy ◽  
Victor Talalai ◽  
Yury Vasilyev ◽  
...  

The implementation of the proposed innovative project on the use of phosphogypsum waste in road construction will: solve the problem of recycling and processing of phosphogypsum by using it as a local by-material for the construction of roadbed and foundations of roads; replace natural gypsum with cheaper raw materials for cement, construction and road industry; reduce the cost of construction of roads and extend the turnaround time by improving the quality of their properties. Road with the use of phosphogypsum is cheaper by 30 % than roads with traditional technologies. In the swampy area due to the characteristics of the material, combining solidity and lightness, phosphogypsum is not interchangeable at all. It allows you to make reliable and durable roads. The design is obtained up to five times stronger than the required standards. At the same time, at the first stage of construction of the road, it is possible to make an intermediate type, making the bases of phosphogypsum, and later laying the remaining structural layers of crushed stone and asphalt. In this case, the coating of technical gypsum is not destroyed, even with the passage of heavy tracked vehicles and at low temperatures.


2021 ◽  
Vol 2124 (1) ◽  
pp. 012023
Author(s):  
L V Zakrevskaya ◽  
K A Nikolaeva ◽  
A I Gandelsman ◽  
P A Orekhov

Abstract Increasing the volume of road construction is one of the priority areas of infrastructure development in any country. When building roads, it is preferable to use local materials to reduce the cost of their transportation, therefore, it is advisable to build the roadbed on local soils. It is worth noting that clay water-saturated soils are the most common, which complicates the construction of the road due to some features of this type of soil. The object of the study is a water-saturated clay with the following characteristics: natural humidity from 25.3 % to 28.1% by weight, optimal humidity from 11.8 % to 16.7% by weight, the number of plasticity from 0.118 to 0.153. Clay soils have a number of features: waterlogged soils are difficult to compact and develop, it is quite problematic to dry them, and thixotropy is also characteristic of clay soils. In this regard, it is most advisable to use the method of complex mineral binders to optimize their physical and mechanical properties. In the course of laboratory studies, compositions of soil compositions with the addition of lime waste and superplasticizer P-17 were developed. The dependence of the strength on the consumption of mineral binders and surfactants is established: the maximum compressive strength of the soil being fixed is achieved at a lime content of 25 wt.% and at a P-17 content in the range of 0.10-0.5 wt.%.


2021 ◽  
Vol 2021 (23) ◽  
pp. 76-85
Author(s):  
Oksana Demchenko ◽  
◽  
Roman Mishchenko ◽  
Volodymyr Ilchenko ◽  
◽  
...  

Introduction. The current state of the network of public roads due to the negative impact of climatic factors and ever-increasing traffic loads characterized by significant amounts of deformation and destruction of the road structure so requires significant material costs for maintenance and gradual improvement of a transport and operational condition according to the operating regulatory requirements.Problem Statement. One of the promising areas to reduce the cost of road construction is manufacturing the recycled hot mix asphalt based on milled asphalt, which is usually formed in scarifying of the road surface layers during repair and construction works, with the plastic fiber addition obtained from household plastic waste. This combination of secondary materials will not only get the economic effect of reducing the cost of purchasing new road construction materials but also improve the environmental situation through the use of household waste.Purpose. Investigation of physical and mechanical properties of recycled hot mix asphalt based on milled asphalt with the plastic fiber addition Materials and Methods. It was established the manufacturing possibility of recycled hot mix asphalt based on milled asphalt with the plastic fiber addition. Test specimens performance measuring was conducted to determine the average density of the material, water saturation, swelling at ultimate compressive strength in the laboratory conditions according to standardized techniques by current regulations.Results. The results of experimental studies regarding the manufacturing features and physical and mechanical properties of recycled hot mix asphalt based on milled asphalt with the addition of plastic fiber obtained from household waste are shown.Conclusion. The correspondence of the manufactured specimens of recycled hot mix asphalt to regulations is established as well as its road construction application options.Keywords: asphalt pavement, recycled hot mix asphalt, hot recycled, milled asphalt, plastic fiber, (RHMA), reclaimed asphalt pavement (RAP).


2018 ◽  
Vol 8 (2) ◽  
Author(s):  
Faizal Bakrie

Cost Planning is planning a number of calculations necessary costs for material, labor, equipment and expenses related in implementation of the project Construction  and  Implementation  Method  road  is  a  basic  reference  in  the implementation of road construction by Standard Highways applied to the road Pameu- Genting Gate starting from the STA 45 + 850 s I d 49 + 500. Calculation of Budget Plan include Job Layers Base Down (LPB) Aggregate B, Works layer Piling Up (LPA) Aggregate A, (Prime Coat), Works Layer Binder AC-BC and Layer Aus AC-WC  (Surface). The method used is Estimation Method Index (E.l) Highways, 2010. From the calculation results obtained execution time of 166 working days,fee for Base Aggregate Base Layer B Amounting Rp.4. 032.876,00, -. Costs for Top Layer Aggregate Base A sum Rp.3.376.312,816.50, -. Fees for absorbing binder layer of Rp. 122,801,512.50, - Fees for Layers Between AC-BC (Surface) of Rp. 4. 732.319.951.10, - and the cost for AC-WC Aus layer Rp.2.331.857.250.00 So the sum total budget is of Rp. 14,752,380,906.00, - the value added tax (VAT) of 10% as well as the scheduling of the execution time using the S curve. and the method of implementation applied to the project include Job Layers Base Down Aggregate B, Layer Piling Up Aggregate A, (Prime Coat), Layer Binder AC-BC and and the cost for AC-WC (Surface) with a systematic way, accuracy, effective and efficient based on the plans.Keywords: Budget Plan, S curve, and Methods of Implementation