Cost Planning is planning a number of calculations necessary costs for material, labor, equipment and expenses related in implementation of the project Construction  and  Implementation  Method  road  is  a  basic  reference  in  the implementation of road construction by Standard Highways applied to the road Pameu- Genting Gate starting from the STA 45 + 850 s I d 49 + 500. Calculation of Budget Plan include Job Layers Base Down (LPB) Aggregate B, Works layer Piling Up (LPA) Aggregate A, (Prime Coat), Works Layer Binder AC-BC and Layer Aus AC-WC  (Surface). The method used is Estimation Method Index (E.l) Highways, 2010. From the calculation results obtained execution time of 166 working days,fee for Base Aggregate Base Layer B Amounting Rp.4. 032.876,00, -. Costs for Top Layer Aggregate Base A sum Rp.3.376.312,816.50, -. Fees for absorbing binder layer of Rp. 122,801,512.50, - Fees for Layers Between AC-BC (Surface) of Rp. 4. 732.319.951.10, - and the cost for AC-WC Aus layer Rp.2.331.857.250.00 So the sum total budget is of Rp. 14,752,380,906.00, - the value added tax (VAT) of 10% as well as the scheduling of the execution time using the S curve. and the method of implementation applied to the project include Job Layers Base Down Aggregate B, Layer Piling Up Aggregate A, (Prime Coat), Layer Binder AC-BC and and the cost for AC-WC (Surface) with a systematic way, accuracy, effective and efficient based on the plans.Keywords: Budget Plan, S curve, and Methods of Implementation

2021 ◽  
Vol 2021 (23) ◽  
pp. 20-30
Author(s):  
Taras Pechonchyk ◽  
◽  
Vitaliy Ivanchenko ◽  

AbstractIntroduction. Effective management of road indstry is particularly important in conditions of limited funding, as it is not possible to provide adequate funding of the economic entity that has the functions of a customer service. The cost of the customer service maintenance depends directly on the compliance with applicable regulations for these works cost determination. One of the aspects that form a considerable part of the costs of customer service is the maintenance of service vehicles.Problem Statement. Road services in the regions (hereinafter RSR) are the recipients and managers of the funds from the State Budget of Ukraine that are directed for the development and maintenance of public roads of state importance, being as well the asset holders of these roads. To perform their functions, the RSR have vehicles on their balance, the use of which involves a number of costs, including fuel and lubricants, repair, maintenance, replacement of tires, etc. The most important of the steps involved in setting the costs of vehicle maintenance is the process of cost planning. Planning has to be based on the structure of the vehicle fleet (own or leased), functional responsibilities and scope of road works.Planning is carried out for vehicles on the balance of the RSR, as well as for leased vehicles. In the case of leasing, the costs mentioned above are added by the vehicles leasing costs. These costs must be forecasted, justified and performed within the approved cost estimates of the customer service expenses.Purpose. The purpose of the article is to highlight the theoretical and methodological approaches to the calculation of planned costs for the maintenance of service vehicles of the road works customer.Materials and methods. Dialectical methods of knowledge, such as analysis and synthesis of fleet composition characteristics and approaches to cost planning methods, as well as induction, were used in writing the article to explore some aspects of the process of calculating the planned cost of maintenance of the road works customer's service vehicles.Results. The study highlights and describes the main approaches to the calculation of planned costs for the maintenance of service vehicles of the road works customer. The methodology of calculation of planned costs for the maintenance of service vehicles is explored.Conclusions. The introduction of a clear methodology and analytical toolkit for calculating all necessary expenditure items for the maintenance of the road works customer's vehicles in the cost planning process will establish the implementation of a clear mechanism for calculating the planned costs of maintenance of the road works customer's vehicles. It will also provide an automated information-analytical complex for planning of cost estimates, with information entry and reporting in standard forms and possibility of prompt response to changes in fleet composition, needs for spare parts, repairs or other expenses for the maintenance of service vehicles and making changes in cost estimates.Keywords: motor vehicles, costs, cost planning, customer service, maintenance of service vehicles


2021 ◽  
Vol 2021 (23) ◽  
pp. 31-42
Author(s):  
Anatolii Tsynka ◽  
◽  
Andrii Hrinchuk ◽  
Ivan Rakovych ◽  
◽  
...  

Introduction. In the modern conditions of the pricing system in the construction of Ukraine, the key value have the estimated norms, which are presented in separate collections, the main purpose of which is to determine the standard quantity of resources required to perform a particular type of work as a basis for the transition to the cost indicators. In order to determine the cost of road work objectively and accurately, it is essential that the indicators of estimated norms meet the requirements of regulatory documents and modern methods of execution of road works.Problematics. In connection with the active improvement of the regulatory base of the road construction industry, permanent upgrade of road organizations technique fleet, the introduction of new technologies and materials in construction and operation of roads, improving the methods of work there is a discrepancy between the existing resource element of estimated norms and the actual conditions of work in terms of built-up labor costs, the operation time of machines and mechanisms and the range of materials. Accordingly, it affects the reliability and accuracy of determining the cost of road works.Purpose. Improvement and harmonization with actual working conditions and requirements of regulatory documents of industry regulatory and estimate base of resource elementary estimated norms for work performed during construction, reconstruction, repair and operational maintenance of roads and bridges to ensure reliable and valid technical, economic and estimated calculations.Materials and methods. During work performance the analysis of the regulatory documentation, establishing the requirements to the technology of road works and materials has been carried out. A number of chronometric observations with the measurement of time of road works in full-scale conditions was carried out. The obtained data were summarized, averaged and on their basis the indicators of the resource element of the estimated norms were estimated.Results. A review of the main amendments and additions, which came into force after the approval of Amendment No 2 SOU 42.1-37641918-035:2018 [1] and Amendment No 2 SOU 42.1-37641918-071:2018 [2], which were developed to improve the regulatory-estimate base for the calculation of road works, taking into account the requirements and provisions of existing regulatory documents taking into account the current state of scientific and technological progress in the road sector.Conclusions. The above analysis of the amendments that came into force with the approval of [1]. and [2] will systematize the innovations provided by the requirements of current regulatory documents on the calculation of the cost of road works and the development of relevant documents at all stages of the investment process, planning and organization of road works, as well as the writing-off of material resources. Review and systematization of recent improvements in the estimated regulatory documents for road works will provide an opportunity to optimally plan the use of available material, labor and financial resources, often limited.Keywords: public road, operational maintenance, investment documentation, overhaul and current repairs, machine, mechanism, regulatory document, resource element estimate norm, Standard of Organization of Ukraine.


2003 ◽  
Vol 1819 (1) ◽  
pp. 161-165 ◽  
Author(s):  
Ali A. Selim ◽  
Kenneth O. Skorseth ◽  
Ratnasamy Muniandy

Gravel surfacing is commonly used on low-volume roads in rural areas of the United States to form farm-to-market networks that contain more than a million miles of unpaved roads. Some of these roads carry appreciable amounts of trucks and farm machinery. Some of these roads, if properly designed and constructed, can last a long time. One such road is in Hand County, South Dakota. This road was constructed in 1963 and has never been rehabilitated or reconstructed since its construction, and it has shown excellent performance for more than 37 years. This road normally carries less than 200 vehicles per day, but significant numbers of heavy trucks use the road. This exceptional performance led to an investigation of the reasons why that road lasted as long as it did without major maintenance or rehabilitation. Although this type of road construction is common in other nations, under different names, the practice of constructing this type of road in the United States was done without documented specifications. The main objectives of the study were to determine all factors that contributed to the longevity and the remarkable performance of this road through field and laboratory investigations. Field investigations with a dynamic cone penetrometer (DCP) revealed that both the quality and the quantity of aggregate base were more than adequate. Although the subgrade soil was classified as A6 according to AASHTO soil specifications, it provided good support according to DCP data. Tests of the flatness and elongation of the coarse aggregate and the angularity of the fine aggregate also revealed satisfactory results. Gradation tests also revealed compliance with specifications.


2019 ◽  
Vol 6 (3) ◽  
Author(s):  
Kabanov Aleksandr ◽  
Irina Kolos ◽  
Viktoriya Chernyaeva ◽  
Aleksey Ilin ◽  
Olga Medvedeva ◽  
...  

This article discusses the problems that arise in the operation of road structures. One of the most important is rutting. Indicators of resistance to rutting depend on the method of design of non-rigid pavement and operational parameters, which allows to obtain the applied method of volumetric design of asphalt mix «Superpave» (SP-19), which in our country was called «SPAS». The authors, together with the staff of the laboratory of asphalt Concrete plant – 1, monitored asphalt concrete mixtures designed according to the «Superpave» system on the asphalt mixing plant. Then tests were carried out according to the method of PNST 181-2016 on the susceptibility of asphalt concrete materials to shear deformations arising under the action of repeated passes of the loaded wheel at ambient temperature. The result of the study of rutting showed that the mixture SP-19 have predominantly traditional. More detailed research results are presented in this article. Based on the data obtained from the results, conclusions were formulated: the Studies show that the method of «Superpeyv» is updated to the requirements of technical supervision at the objects of the road complex of the Russian Federation. In conclusion, the authors have formulated conclusions on the research: a comparison of physical and mechanical performance of asphalt concrete mix SP-19 on PNST 114 and fine-grained asphalt concrete mix type A brand I shows that the shear stability in terms of the average depth of the track is higher for the brand SP-19 by 38 %; set the required mixing temperature and compaction of asphalt concrete mixture on the system «Superpeyv»; the release of a pilot batch of asphalt concrete mix of SP-19 brand at the production site of JSC «ABZ-1» showed that the recipe selected in the laboratory is reproduced in the ABZ; cores selected within the framework of technical supervision from the experimental coating and tested in the laboratory showed corresponding to the requirements of ODM 218.4.038-2017; assessment of economic efficiency at the cost of asphalt concrete mix of SP-19 brand showed a decrease of 2.2 % relative to the cost of fine-grained asphalt concrete mix; the increase in the service life of the road surface h 30–50 % by reducing rutting increases its turnaround time. At the same time, economic efficiency can reach 50 % per m2.


Author(s):  
А.Х. Мохамед ◽  
Н.А. Тюрин

Основной целью работы является оптимизация использования машин для земляных работ в строительстве лесных дорог по критерию минимума приведенных расходов, путем оптимального распределения комплектов машин по объектам строительства при условии возможности аренды какихлибо дополнительных машин. Создана экономикоматематическая модель расчета эффективной структуры парка машин с точки зрения системы производственной эксплуатации, которая складывается из эффектов всех специализированных комплектов машин и эффекта от передачи машин парка в аренду. Учет возможности передачи или получения техники в аренду позволяет улучшить техникоэкономические показатели эксплуатации парка машин. Результаты работы могут быть востребованы лесозаготовительными и дорожностроительными предприятиями в период проектирования производства земляных работ, обновления машинных парков, а также при выборе наилучшего варианта использования имеющегося парка, прогнозирования продолжительности и стоимости ведения механизированных работ. The main purpose of this work is to optimize the earthmoving machinery utilization in the forest road construction, by minimize the operating cost. That goal may achieve by the optimal distribution of the machine combination in the construction sites, with the ability of renting additional machines. Economical mathematical model has been developed for calculating the effective structure of the machine group to achieve the required productivity. The possibility of hire and rent machines allows the manager to improve the technical economic decision for the machines operation. By using the developed model it can gives good results to having better decisions for planning and designing the earth working operations in the road construction companies, renovation of the machine parks, as well as the choosing the best option for using the existing machine combination, predicting the duration and predicting the cost of the whole work.


2010 ◽  
Vol 56 (No. 3) ◽  
pp. 137-145 ◽  
Author(s):  
R. Ghaffariyan M ◽  
K. Stampfer ◽  
J. Sessions ◽  
T. Durston ◽  
CH. Kanzian ◽  
...  

&nbsp;To minimize the cost of logging, it is necessary to optimize the road density. The aim of this study was to determine optimal road spacing (ORS) in Northern Austria. The stepwise regression method was used in modelling. The production rate of tower yarder was 10.4 m<SUP>3</SUP>/PSHo (Productive system hours) and cost of 19.71 €.m<SUP>–3</SUP>. ORS was studied by calculating road construction cost, installation cost and yarding cost per m<SUP>3</SUP> for different road spacing. The minimum total cost occurred at 39.15 €.m<SUP>–3</SUP> and ORS would be 474 m assuming uphill and downhill yarding. The optimal road density and yarding distance are 21.1 m.ha<SUP>–1</SUP> and 90 m, respectively. A sample logging area was used to plan different roads and, using network analysis, the best solution was found based on a modified shortest path algorithm. The network analysis results were very different from the optimal road spacing results that assumed roads and logging corridors could be located anywhere in the planning area at a constant cost. Mixed integer programming was also used to get a real optimal solution.


2021 ◽  
Vol XXVIII (2) ◽  
pp. 120-124
Author(s):  
Ion Chiricuta ◽  

This work facilitates the application of modern technologies for road construction, by using steel slag instead of natural stone aggregates. This procedure will result in a significant decrease in the cost of works (slag, being an industrial waste, is much cheaper than natural aggregate). In the same time, the use of slag aggregates can result in protection of the environment, by eliminating slag storage spaces and by preserving the natural environment (extraction of natural aggregates may disturb groundwater and intensify erosion etc). Marshall stability, flow index and bulk density were determined for both kinds of aggregates, in order to find if the steel slag can safely replace the natural aggregates. By comparing the experimental results obtained for the two kinds of aggregates, it was confirmed the possibility of successfully using of steel slag as a substitute for natural aggregates in the base layer of a road structure.


Author(s):  
Eva Rita

In development and reconstruction of roads frequent changes work items, affecting the cost, turnaround time and quality of work. In order to determine what factors cause of the technical justification has conducted a study of eight packages of road construction and eight packages of reconstruction road capacity of West Sumatra in the unit Implementation of National Road Region I and Region II under  theNational Road Agency of West Sumatera Province. The work packages studied wasthe work conducted in 2009 to 2015. The method used was descriptive-evaluative research. Results of the study found the 7 causal factors do technical justification that the initial design of the contract is not in accordance with the results of the engineering field, not taking into account the design life of the road, , has not been calculated in detail the volume and the price for each item of work, do not pay attention to Standard Directorate general of Highways Ministry of public Works, the land is not available when the project is implemented, the results of field surveys for planning is not complete, and the occurrence of overlapping projects between the state and local budgets. To eliminate the occurrence of increased costs due to technical justification is necessary to complete the field survey by calculating in detail the volume and the price for each work item.


2019 ◽  
Vol 6 (1) ◽  
Author(s):  
Andrey Kochetkov ◽  
Natal’ya Shchegoleva ◽  
Sergey Korotkovskiy ◽  
Victor Talalai ◽  
Yury Vasilyev ◽  
...  

The implementation of the proposed innovative project on the use of phosphogypsum waste in road construction will: solve the problem of recycling and processing of phosphogypsum by using it as a local by-material for the construction of roadbed and foundations of roads; replace natural gypsum with cheaper raw materials for cement, construction and road industry; reduce the cost of construction of roads and extend the turnaround time by improving the quality of their properties. Road with the use of phosphogypsum is cheaper by 30 % than roads with traditional technologies. In the swampy area due to the characteristics of the material, combining solidity and lightness, phosphogypsum is not interchangeable at all. It allows you to make reliable and durable roads. The design is obtained up to five times stronger than the required standards. At the same time, at the first stage of construction of the road, it is possible to make an intermediate type, making the bases of phosphogypsum, and later laying the remaining structural layers of crushed stone and asphalt. In this case, the coating of technical gypsum is not destroyed, even with the passage of heavy tracked vehicles and at low temperatures.


2021 ◽  
Vol 2124 (1) ◽  
pp. 012023
Author(s):  
L V Zakrevskaya ◽  
K A Nikolaeva ◽  
A I Gandelsman ◽  
P A Orekhov

Abstract Increasing the volume of road construction is one of the priority areas of infrastructure development in any country. When building roads, it is preferable to use local materials to reduce the cost of their transportation, therefore, it is advisable to build the roadbed on local soils. It is worth noting that clay water-saturated soils are the most common, which complicates the construction of the road due to some features of this type of soil. The object of the study is a water-saturated clay with the following characteristics: natural humidity from 25.3 % to 28.1% by weight, optimal humidity from 11.8 % to 16.7% by weight, the number of plasticity from 0.118 to 0.153. Clay soils have a number of features: waterlogged soils are difficult to compact and develop, it is quite problematic to dry them, and thixotropy is also characteristic of clay soils. In this regard, it is most advisable to use the method of complex mineral binders to optimize their physical and mechanical properties. In the course of laboratory studies, compositions of soil compositions with the addition of lime waste and superplasticizer P-17 were developed. The dependence of the strength on the consumption of mineral binders and surfactants is established: the maximum compressive strength of the soil being fixed is achieved at a lime content of 25 wt.% and at a P-17 content in the range of 0.10-0.5 wt.%.