Study on the System of Multi-Directioncal Inclined Modular Anchorage in the Tunnel Surrounding Rock of Horizontal Bedded

2012 ◽  
Vol 170-173 ◽  
pp. 1761-1764
Author(s):  
Qian Guan Zhang

Tunnel construction, inevitably crosses the surrounding rock of the horizontal bedded .The construction prone to bring about the accident of the local deformation, swaping blocks even the overall collapse, in particular,before completing supporting and reinforcement. Thus, it is particularly important to finish the anchoring timely. The design and construction methods of the conventional vertical anchoring system easily leads to personnel injured, the quality of construction is difficult to guarantee, etc. In the paper, the construction technology which is we adopted is using the way to unite the bedded wall rock inclined bolt and the vertical rock layers bolt .In anchoring, we optimize the spatial arrangement and the construction time. Simultaneously, we analysis the system which is the paper adopted and the tradition technology by the mechanical theory. The results show that there is the consistent effect between the new technology and the old one. However, the new one is to reduce the construction risk and to ensure the constructors’ safe. In conclusion, the new system has the significance of guidance and reference in tunneling.

2019 ◽  
Vol 270 ◽  
pp. 06001
Author(s):  
Herry Trisaputra Zuna ◽  
Zulaikha Budi Astuti

Ministry of Public Works and Housing of Indonesia is targeting to complete the construction of 1.000 km of new toll road projects by the end of 2019. In 2015 until August 2018, 443 km new toll roads have been operated and 1.400 km are under construction. Various types of structure for elevated toll road constructions are applied to meet the geometry and safety requirements such as cast in-situ balanced cantilever, steel I-girder, and steel box are becoming type of elevated toll construction to be applied. To meet the requirements of construction methods, construction time completion, and material volume efficiency, Indonesia Toll Road Authority on behalf Ministry of Public Works and Housing gives opportunities to toll road investors to apply the new technology as the proper selection. Composite Girder technology named Sbarch is proposed for Krian Legundi Bunder Manyar toll road project to cross at SUMO Junction. Compares Sbarch among cast in situ balanced cantilever, steel I-girder and steel box, Sbarch can comply for all requirement that cannot be fulfilled by others method such as with finish grade requirement, to road geometry alignment, accessibility, workability, and steel tonnage reducing.


2021 ◽  
Vol 2021 ◽  
pp. 1-10
Author(s):  
Bole Sun ◽  
Xiaorong Tang ◽  
Yongyi He ◽  
Mingnian Wang

Collapse of the vault and numerous other safety accidents often occur during the construction process of large-section tunnels. The utilization of a small pilot tunnel and a step reverse expansion construction methodology is proposed based on conventional construction methods to explore safe construction technology. First, a theoretical analysis combined with on-site monitoring parameters was conducted. It showed that the maximum displacement of the tunnel surrounding rock was 0.027 m during the elastic stage and increased to 0.031 m during the strength limit stage. The overall surrounding rock deformation does not have a noticeable impact on tunnel safety. A numerical simulation model of the small pilot tunnel advancement and step reverse expansion method was established. Simulation results showed that the first two excavation steps caused 89.6% of the total overlining strata subsidence, and the use of a small pilot tunnel advancement and step reverse expansion method can enhance the tunnel support. The tunnel surrounding rock was adequately stabilized after using this excavation method and provides the in-situ conditions for expanding the pilot tunnel to the large-section tunnel. The proposed method was adopted in an actual engineering project. It protected the subsequent construction of the main tunnel and decreased construction time, saving construction costs while ensuring safety, reducing construction risks, and improving production efficiency. This research can guide similar tunneling projects.


2021 ◽  
Vol 2021 ◽  
pp. 1-16
Author(s):  
Lina Luo ◽  
Gang Lei ◽  
Haibo Hu

Highway tunnel plays an increasingly prominent role in the development of high-grade highway traffic in mountainous countries or regions. Therefore, it is necessary to explore the deformation characteristics of the surrounding rock of a six-lane multiarch tunnel under different excavation conditions. Using the three-dimensional indoor model test and finite element analysis, this paper studies the dynamic mechanical behavior of a six-lane construction, reveals the whole process of the surrounding rock deformation process of class II surrounding rock under different excavation conditions, and puts forward the best construction and excavation method. The results show that the maximum displacement rate of excavation scheme III is the largest, and the maximum displacement rate of excavation scheme I is basically the same as that of excavation scheme II. Therefore, in terms of controlling the displacement rate of the surrounding rock, the effect of excavation scheme I is basically the same as that of excavation scheme II, while that of excavation scheme III is poor. In terms of construction technology, scheme II is simpler than scheme I and can ensure the integrity of the secondary lining. Therefore, in class II surrounding rock of the supporting project, it is recommended to adopt scheme II for construction.


2013 ◽  
pp. 517-536
Author(s):  
Hamed Niroumand ◽  
M.F.M Zain ◽  
Sanaz Naghavi Alhosseni

Building materials and construction technology are strongly interrelated with the pillars for sustainable development (e.g. environment, society economy, culture and politics). Earth Building, an 11,000-year-old practice of building using sustainable and earth materials, is practiced worldwide. Earth has been used to construct walls, floors, roofs, and even furniture. Today it is estimated that between 33-50%of the world's population is housed in earth homes. This chapter reviews the two-year process of earth buildings and earth architecture carried out by the Department of Architecture Faculty of Built Environment and Engineering at National University of Malaysia (UKM). The current research emphasis is on the types, construction methods, and architectural aspects of earth buildings and earth architecture. The current manuscript compares type of earth buildings and their properties and applications based on building materials and architectural aspects in construction.


2012 ◽  
Vol 204-208 ◽  
pp. 738-742
Author(s):  
Jun Qiang Hu ◽  
Yong Xing Zhang ◽  
Jian Gong Chen

The dynamic testing is widely used in undestructive testings of bolt’s anchoring quality. But it’s difficult to estimate bolt’s anchoring quality according to the dynamic response of bolt. The bolt’s anchorage quality depends mainly on bolt-surrounding rock structural system which features must be identified. A new analytical method used in identification for bolt-surrounding rock structural system is put forward, which combine with advantages of wavelet analysis and artificial neural network. The results indicate that this wavelet neural network after training can best identify the bolt’s side rigidity factors and can be a useable intelligentized mean to assess the quality of bolt’s anchoring system.


2018 ◽  
Vol 206 ◽  
pp. 01005
Author(s):  
Zhongmin Yang ◽  
Yongtao Gao ◽  
Ziqiao Cheng ◽  
Zijie Cong

When large deformation of the tunnel occurred in the swelling rock, the large deformation treatment will not only greatly delay the construction time, but also lead to instability or even collapse of the tunnel. Selecting the reasonable timing for large deformation initial support replacement can solve this problem effectively. Based on the LiRang tunnel, the deformation and stress of the tunnel in anhydrite were analysed by FLAC software after excavation. Then replace the deformed first liner at different vault settlement value. The displacement and stress of surrounding rock were analysed when the model reaches equilibrium state again. The results showed that stress concentration at the arch wall and arch foot of the tunnel, and the stress release at the vault and invert is very large after excavation. If the large deformation was treatment when the crown settlement of the tunnel reaches 90% ~95% of the final predicted settlement value, the tunnel deformation and the final stress state could be in a small value. This study can provide a reference for the treatment of large deformation in the swelling rock tunnel.


2020 ◽  
Vol 165 ◽  
pp. 04047
Author(s):  
Jianping Wang

Dongjiang Lichuan Bridge in Dongguan City is a curved tower curved beam cable-stayed bridge with a main span of 138m and no back cable. The main pier cap is located on the bank slope of Dongguan Waterway on one side of Nandi Road. The cushion cap is dumbbell type, and the left and right cushion caps are connected by tie beams. In most areas, the top of rock stratum is above the bottom of bearing platform. The rock stratum within the buried depth of bearing platform is moderately to strongly weathered argillaceous siltstone. The geological conditions are complex and the construction is difficult. In line with the principles of speeding up the construction process and improving economic benefits, comprehensive analysis and weighing advantages and disadvantages, the main pier cap adopts a composite cofferdam of filling soil to build an island and combining bored pile rows and steel sheet piles. The construction task of bearing platform of main pier has been completed with high quality. Compared with other cushion cap construction methods, this construction method has the advantages of fast construction, high quality, simple safety, energy saving and environmental protection. This paper briefly introduces the design scheme of composite cofferdam, expounds in detail the operation steps of steel sheet pile construction and the problems needing attention in construction, and provides good reference experience for similar pile cap construction.


2020 ◽  
Vol 2020 ◽  
pp. 1-20 ◽  
Author(s):  
Tong Liu ◽  
Yujian Zhong ◽  
Zhihua Feng ◽  
Wei Xu ◽  
Feiting Song ◽  
...  

As a typical granular bulk medium, problems are common in boulder-cobble mixed grounds, such as easy collapse and instability and difficult effective support for large-section tunnel excavation. Tunnels constructed in BCM grounds are rare still, and there is a big gap between the design and construction of tunnels. Based on the Nianggaicun highway tunnel crossing the BCM grounds, the construction technology of tunnel in BCM grounds is studied by means of literature investigation and field survey. Here are the main conclusions: the overall deformation of surrounding rock is quite small; the pressure distribution of surrounding rock is small and loose pressure is dominant, and the safety reserve of secondary lining is large. The deformation process of surrounding rock concentrates on the construction stage. During the construction process, there are many problems, such as serious overexcavation, difficulty of bolt penetration, and continuous rock fall. In this paper, a three-bench complementary cyclic excavation method is proposed, which replaces the original CD and CRD methods. Meanwhile, the supporting system is optimized. The results show that the disturbance of surrounding rock is reduced, while the safety of construction process and the reliability of structure are increased. The new excavation method and optimized supporting system are expected to fill the gap between design and construction of tunnel in BCM grounds and provide reference for construction of such tunnels in the future.


2011 ◽  
Vol 90-93 ◽  
pp. 1900-1903
Author(s):  
Fu Ming Wang ◽  
Xiao Long Li ◽  
Yan Hui Zhong ◽  
Xiao Guang Chen

Taking Chaijiazhuang Tunnel of Lingnan Expressway as project background, the stability analysis of surrounding rock was performed based on the coupled fluid-solid theory. The distributions of stress field, displacement field and plastic zone of rock mass after excavation of tunnel were discussed considering coupled effect between flow and stress under the condition of different rock level and tunnel depth. Compared with the calculation results of not considering coupling effect, the maximum deformation, maximum principle stress and plastic zone size of wall rock were obviously increased when considering coupling effect, which showed a remarkable influence of coupled fluid-solid effect on the stability of tunnel surrounding rock. Some conclusions were drawn and may provide some guidance to the design and construction of tunnels in water-rich strata.


2011 ◽  
Vol 250-253 ◽  
pp. 1262-1265
Author(s):  
Tong Liu ◽  
Zi Chao Dong ◽  
Hai Yong Yang

According to the characteristic of multi-arch highway tunnel,based on a practice engineering, the monitoring work was consisted of four sections:the displacement of surrounding rock; such as crown settlement, displacement of the ground, displacement of inner surrounding rock; that of stress and stain of support structure; that of force in middle-wall. In course of construction,monitoring data was analyzed in time.Structural timbering parameters were modified in response to abnormal monitoring data in order to guarantee safety.the testing results of the safety monitoring system are satisfactory, which serves as a symbol of our research work. Thus, our engineering practice has proved the applicability and feasibility of the safety monitoring and information construction methods.