Research on Mining Technological Parameters of 7# Thin Coal Seam in Liuquan Mine

2012 ◽  
Vol 629 ◽  
pp. 937-942
Author(s):  
Dong Sheng Zhang ◽  
Xu Feng Wang ◽  
Yang Zhang ◽  
Jin Liang Wang

Aimed at the specific geological conditions of 7# thin coal seam in Liuquan Mine, this paper used the methods of numerical calculation and theoretical analysis to determine the reasonable technological parameters of high-grade conventional mining face. The numerical simulation software of UDEC (Universal Distinct Element Code) was used to contrast and analyse the characteristics of surrounding rock stress distribution and overlying rock horizontal displacement under the condition of different length of coalface, then it was indicated that the surrounding rock deformation was less when length of coalface was 110 m which was advantageous for roof control; according to the conditions of roof and floor, the roof support strength was being calculated systematically to determine the row space of props being 700×1200 mm; the main equipments of coalface was assorted, and reasonable work manner in coalface and gob processing measure was put forward, which provided guidance for efficient mining in thin coal seam.

2021 ◽  
Vol 2021 ◽  
pp. 1-14
Author(s):  
Qunying Wu ◽  
Binhui Liu ◽  
Jun Yang ◽  
Yajun Wang ◽  
Kuikui Chen ◽  
...  

Universal distinct element code (UDEC) is a simulation software based on the discrete element method, widely used in geotechnical mining. However, in the UDEC, when simulating large-scale excavation, the subsidence of the fractured zone is almost equal to the mining height, which makes the deformation value calculated in the study of gob-side entry retention too large. To solve this problem, in this paper, the double-yield constitutive model is applied to the whole caving zone to analyze the deformation and failure characteristics of surrounding rock along gob-side entry retaining by roof cutting. The results of the simulation are in good agreement with the result of drilling peeking (drilling observation by borehole televiewer) and field condition (observation and measurement in the field). Finally, by using this numerical method, the effects of roadway width, temporary support, and coal side support on the failure of the roof and the arc coal side are studied.


2019 ◽  
Vol 2019 ◽  
pp. 1-18
Author(s):  
Xin Wang ◽  
Yuechao Wu ◽  
Xuehua Li ◽  
Shun Liang

Longwall mining of the adjacent coal seam with the presence of residual coal pillars overlying the seam can result in abnormal strata pressure and severe overburden failure, which poses a significant threat to mining safety. The threat is mainly manifested in the form of intense coal or rock burst and hazardous interconnection between gobs. This study employed the universal distinct element code (UDEC) to investigate the microscopic failure mechanism of the overlying residual coal pillars under the influence of longwall mining of an adjacent underlying coal seam in Yuanbaowan coal mine, China. Using the Voronoi method, we innovatively visualized the evolution of cracks in residual pillars, revealed the mechanism behind the failure of pillars, and explored the evolution and distribution of abutment stress. Also, strata movement characteristics during underlying panel extraction have been surveyed. Based on the modeling results, effective measures are proposed to ensure safe mining under residual coal pillars. This study might provide a certain reference for safe extraction of multiple seams in Datong Coalfield, China, and also in the central and western Appalachian Basin, United States, where many mining activities are carried out under residual pillars.


2020 ◽  
Vol 12 (13) ◽  
pp. 5426
Author(s):  
Donghui Chen ◽  
Huie Chen ◽  
Wen Zhang ◽  
Chun Tan ◽  
Zhifa Ma ◽  
...  

The failure mechanism analysis of dam foundations is key for designing hydropower stations. This study analyses the rock masses in a sluice section, which is an important part of the main dam of the Datengxia Hydropower Station currently built in China. The stability of the sluice rock masses is predominantly affected by gentle through-going soft interlayers and steep structural fractures. Its foundation failure mechanism is investigated by means of a numerical method, i.e., Universal Distinct Element Code (UDEC) and the geomechanical model method. The modeling principle and process, and results for the rock dam foundation are introduced and generated by using the abovementioned two methods. The results indicate that the failure mechanism of the foundation rock masses, as characterized by gentle through-going and steep structural discontinuities, is not a conventional type of shear failure mechanism but a buckling one. This type of failure mechanism is verified by analyzing the deformation features resulting from the overloading of both methods and strength reduction of the numerical method.


2019 ◽  
Vol 136 ◽  
pp. 04023
Author(s):  
Ming Zhao ◽  
Ke Li ◽  
Hong Yan Guo ◽  
KaiCheng Hua

Based on the special geological conditions of a tunnel in Qingyuan section of Huizhou-Zhanzhou Expressway, FLAC3d numerical simulation software is used to simulate the rheological properties and instability of surrounding rock in large-section fully weathered sandstone section, and the stability and loss of surrounding rock are analyzed. The deformation of the dome and the face at steady state is analyzed. It is found that: 1) when the surrounding rock is in a stable state, the deformation curve of the dome is smooth. When the surrounding rock of the face is unstable, the front of the face appears ahead. Deformation should be first strengthened on the surrounding rock in front of the face. 2) The arched foot is an important part of the instability of the surrounding rock. In order to prevent the expansion of the collapsed part, the arched part should be reinforced. 3) In order to obtain the limit state of surrounding rock stability, the strength of surrounding rock is reduced, and the strength reduction coefficient corresponding to the displacement sudden point is taken as the safety factor of rock stability around the hole, and the stability safety coefficients of surrounding rock of each construction step are greater than 1.2. 4) The dynamic standard values of deformation control in the whole construction stage are obtained by analyzing the deformation curves of each data monitoring point with time in the corresponding time period of each construction step.


2013 ◽  
Vol 295-298 ◽  
pp. 2980-2984
Author(s):  
Xiang Qian Wang ◽  
Da Fa Yin ◽  
Zhao Ning Gao ◽  
Qi Feng Zhao

Based on the geological conditions of 6# coal seam and 8# coal seam in Xieqiao Coal Mine, to determine reasonable entry layout of lower seam in multi-seam mining, alternate internal entry layout, alternate exterior entry layout and overlapping entry layout were put forward and simulated by FLAC3D. Then stress distribution and displacement characteristics of surrounding rock were analyzed in the three ways of entry layout, leading to the conclusion that alternate internal entry layout is a better choice for multi-seam mining, for which makes the entry located in stress reduce zone and reduces the influence of abutment pressure of upper coal seam mining to a certain extent,. And the mining practice of Xieqiao Coal Mine tested the results, which will offer a beneficial reference for entry layout with similar geological conditions in multi-seam mining.


2021 ◽  
Author(s):  
Chuang Liu ◽  
Huamin Li

Abstract In the process of longwall top coal caving, the selection of the top coal caving interval along the advancing direction of the working face has an important effect on the top coal recovery. To explore a realistic top coal caving interval of the longwall top coal caving working face, longwall top coal caving panel 8202 in the Tongxin Coal Mine is used as an example, and 30 numerical simulation models are established by using Continuum-based Distinct Element Method (CDEM) simulation software to study the top coal recovery with 4.0 m, 8.0 m, 12.0 m, 16.0 m, 20.0 m and 24.0 m top coal thicknesses and 0.8 m, 1.0 m, 1.2 m, 1.6 m and 2.4 m top coal caving intervals. The results show that with an increase in the top coal caving interval, the single top coal caving amount increases. The top coal recovery is the highest with a 0.8 m top coal caving interval when the thickness of the top coal is less than 4.0 m, and it is the highest with a 1.2 m top coal caving interval when the coal seam thickness is greater than 4.0 m. These results provide a reference for the selection of a realistic top coal caving interval in thick coal seam caving mining.


2018 ◽  
Vol 18 (7) ◽  
pp. 1867-1890 ◽  
Author(s):  
Léonidas Nibigira ◽  
Hans-Balder Havenith ◽  
Pierre Archambeau ◽  
Benjamin Dewals

Abstract. This paper investigates the possible formation of a landslide dam on the Kanyosha River near Bujumbura, the capital of Burundi, as well as the interplay between the breaching of this landslide dam and the flooding along the river. We present an end-to-end analysis, ranging from the origin of the landslide up to the computation of flood waves induced by the dam breaching. The study includes three main steps. First, the mass movement site was investigated with various geophysical methods that allowed us to build a general 3-D model and detailed 2-D sections of the landslide. Second, this model was used for dynamic landslide process modelling with the Universal Distinct Element Code. The results showed that a 15 m high landslide dam may form on the river. Finally, a 2-D hydraulic model was set up to find out the consequences of the breaching of the landslide dam on flooding along the river, especially in an urban area located downstream. Based on 2-D maps of maximum water depth, flow velocity and wave propagation time, the results highlight that neglecting the influence of such landslide dams leads to substantial underestimation of flood intensity in the downstream area.


Author(s):  
Tongbin Zhao ◽  
Zhenyu Zhang ◽  
Yunliang Tan ◽  
Chengzhong Shi ◽  
Ping Wei ◽  
...  

2017 ◽  
Author(s):  
Léonidas Nibigira ◽  
Hans-Balder Havenith ◽  
Pierre Archambeau ◽  
Benjamin Dewals

Abstract. This paper investigated the possible formation of a landslide dam on the Kanyosha River near Bujumbura, the capital of Burundi, as well as the interplay between the breaching of this landslide dam and the flooding along the river. We present an end-to-end analysis, ranging from the origin of the landslide up to the computation of flood waves induced by the dam breaching. The study includes three main steps. First, the mass movement site was investigated with various geophysical methods that allowed us to build a general 3D model and detailed 2D sections of the landslide. Second, this model was used for dynamic landslide process modelling with the Universal Distinct Element Code. The results showed that a fifteen-meter-high landslide dam may form on the river. Finally, a 2D hydraulic model was setup to find out the consequences of the breaching of the landslide dam on flooding along the river, especially in an urban area located downstream. Based on 2D maps of maximum water depth, flow velocity and wave propagation time, the results highlight that neglecting the influence of such landslide dams leads to substantial underestimation of flood hazard in the downstream area.


Sign in / Sign up

Export Citation Format

Share Document