scholarly journals Developing a Diamond Framework Model Based on “Integration” of Project Success Measures for Construction Project Management in Yemen

2021 ◽  
Vol 29 (3) ◽  
Author(s):  
Muaadh Yahya Al-Kuhail ◽  
Hamoud Ahmed Al-Dafiry ◽  
Tarek Abdullah Barakat ◽  
Abdulwahad Al-Ansi

The most prominent obstacle facing the construction industry in Yemen is mismanagement. Developing appropriate tools, approaches, and standards for managing construction projects will contribute effectively to the development and prosperity of the Yemeni construction industry. This study aims to provide the tools, approaches and standards for project management based on the opinions of the Yemeni advisory bodies. It presents an Integrated Cost, Quality, Time, and Scope (ICQTS) diamond framework model by developing the traditional triangle model in project management providing a practical contribution to researchers and companies working in the construction industry. The study uses a descriptive and analytical approach through a comprehensive literature review followed by a field study using a designed questionnaire distributed to the relevant Yemeni advisory bodies. The study concluded with the development of the traditional triangle model resulting in the introduction of the diamond framework model in the management of construction projects. Integration management was found to have a strong impact on project success presenting the framework model as an easy and flexible tool that unifies and integrates the processes and roles in the project and directing it towards achieving project stakeholder objectives. The literature largely neglects the impact of integration management in the various models and is mostly overlooked. Inclusion of integration management in the presented model will highlight measures of project success stressing the need to integrate and manage them together. Future studies may research the differences in the opinions of construction companies.

2019 ◽  
Vol 9 (2) ◽  
pp. 3945-3948 ◽  
Author(s):  
M. H. Momade ◽  
M. R. Hainin

Motivation is one of the factors that influence productivity. Project management plays a vital role in the success of projects in Qatar construction industry (QCI). It relies profoundly on the team’s active participation and effective performance. Hence it is important to assess the impact of motivation and demotivation on performance. The main objective of this paper is to identify the key factors that cause motivation and de-motivation in QCI. Literature review, surveys with experts and semi-structured interviews were conducted to identify these factors. Using these factors to conduct specific motivational programs will help improve productivity in QCI. Research on motivational factors impacting productivity has not been conducted in Qatar before, so this work will provide insight on how to deal with productivity issues that QCI faces ahead of a major world event that Qatar will host in 2022.


2015 ◽  
Vol 3 (2) ◽  
pp. 69-84
Author(s):  
Wadhah Amer Hatem ◽  
Samiaah M. Hassen Al-Tmeemy

     Suicide attacks, bombings, explosions became the part of daily life in Iraq. Consequently, the threat of terrorism put the Iraqi construction sector in the face of unique and unusual challenges that not seen on other countries. These challenges can have extensive impact on construction projects. This paper seeks to examine the impact of the terrorist attacks on construction industry and determine the extent to which the impact of terrorism on construction projects in terms of cost, schedule, and quality. This study adapted quantitative and qualitative approaches to collect data using questionnaire survey and interviews, as well as historical data. The study focused on projects that have been the target of terrorist strikes in Diyala governorate. A variety of statistical procedures were employed in data analysis. The results revealed the extent to which terrorist attacks impact construction projects in terms of cost, time, and quality. The results of this study will enhance the awareness of all construction parties to the impact of the terrorist attacks against construction projects. Eventually, this can develop a risk management assessment and assist contractors to properly protect projects and buildings to minimize injuries and fatalities in the event of terrorism.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Aqsa Ameer ◽  
Farah Naz ◽  
Bushra Gul Taj ◽  
Iqra Ameer

Purpose The purpose of this study is to determine the effect of conscientiousness and extraversion personality traits on project success. The relationship is mediated by affective professional commitment, whilst the relationship between personality traits and project success is moderated by organizational project management maturity. Design/methodology/approach The deductive approach is used to achieve the objectives of this study. Data were collected through a purposive sampling technique from 250 respondents with the help of questionnaires from information technology sectors. The structural equation modelling (SEM) in partial least squares-SEM and SPSS is used to analyse the data and to examine the hypothesis. Findings The outcomes demonstrate the partial mediating impact of affective professional commitment between the relationship of conscientiousness and extraversion personalities with project success. Additionally, it proves the moderating effects of project management maturity between the relationship of conscientiousness and extraversion personalities with project success. Practical implications This study reflects that employee personality appears to be a reliable indicator of how an employee is faithful to his profession. This faithfulness or duty decides the employee’s execution in terms of offering a successful project. Thus, achieving employee commitment needs to be done by completing the project successfully by the organizations in the presence of project management maturity systems. Originality/value It is the first study of its kind to provide experimental proof of the impact of a manager’s personality traits on project success in the presence of affective professional commitment (mediator) and organizational project management maturity (moderator).


2013 ◽  
Vol 671-674 ◽  
pp. 2973-2977
Author(s):  
Jaeh Yun Choi ◽  
Kyu Sung Lee

As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner.


2019 ◽  
Vol 9 (2) ◽  
pp. 56-65
Author(s):  
Michael Pace

Abstract This non-experimental correlational study extends previous research investigating the relationship between project management methodology and reported project success, as well as the moderating variables of industry and project manager experience. The sample included North American project managers with five years’ experience, 25 years of age or older, and experience with multiple project management methodologies. The survey instrument consisted of 58 questions, utilizing a 5-point Likert scale to record responses. The survey contained three sections, including demographic information, questions related to a successful project, and questions related to a less-than successful (failed / challenged) project. 367 usable responses were received. The examination of the constructs included Pearson’s correlation coefficient as well as linear regression to determine the impact of moderating variables. Results indicated that project management methodology has a weak correlation with reported project success, and this correlation is not moderated by industry nor project manager experience. The results did not align with previously conducted studies, illustrating a need to continue the study of methods impacting success including investigating additional moderating variables.


2015 ◽  
Vol 764-765 ◽  
pp. 895-899
Author(s):  
Shiow Luan Wang ◽  
Thi Hoa Vu

Construction projects are becoming ever more complex and time driven, especially as the amount of project data and active project participants’ increase. For achieving a project success, project management not only must to meet time, cost, quality objectives, but also satisfies the project stakeholders needs related to the project management process. Project managers were difficult to effectively seizing, collecting and handling information which are generated from different systems. The elements of information presentation in web-based was contributed an important role to project management success. The purpose of this study is to provide a background to denote the enhancing project management via information presentation based on effective information technology/information systems which are emphasized in web-based.


Author(s):  
Žanesa Ljevo ◽  
Mladen Vukomanović ◽  
Suada Džebo

AbstractAlthough the quality of a process affects the quality of the end product, there is currently an insignificant amount of knowledge about the quality of project management (PM) processes that directly affect the quality of the delivered product (constructed building). This study presents a proposal for modeling the impact of the quality of the PM process on the quality of the constructed building. The quality of the PM process is represented by the main quality factors and product quality indicators. It presents the results of the interviews that were conducted and study cases that were analyzed in Bosnia and Herzegovina with a variety of project participants (with different managerial perspectives) in terms of the indicators of quality of the delivered product. All participants, regardless of managerial perspective, believe that the most important indicator of the quality of products for each phase of the project is “customer satisfaction in the end phase”, the measurement of which is different for each project phase that is presented. The results of the factor analysis of the definition and the planning phases show that 11 variables, namely, the quality factors of the PM process, can be grouped into three new factors, which is described as 66.61% (77.046%) of the basic set of variables.


2016 ◽  
Vol 38 (2) ◽  
pp. 261-281
Author(s):  
Bálint Blaskovics

The project management literature on project success is rich. Numerous papers focus on the evolution of the understanding of project success, identification of success criteria and critical success factors. Critical success factors increase the potential for achieving project success, while project success can be evaluated with the help of success criteria. Although the interrelationships between critical success factors and success criteria are rarely analyzed, yet there is a strong demand for it. The aim of this paper is twofold. One of the aims is to identify the impact of one of the critical success factors, the project manager’s project management attitude on project success. The other aim is to highlight the interrelationship between the project manager’s personal characteristics and project management attitude and leadership style, which are three critical success factors. These aim to address the shortcoming mentioned above, which is considering the lack of the interrelationships between critical success factors and success criteria. The research outcomes are drawn from qualitative field research at the Hungarian subsidiaries of multinational companies operating in the ICT sector.


2016 ◽  
Vol 05 (07) ◽  
pp. 01-07
Author(s):  
Akram Subhe Suleiman ◽  
Jafar Subhi Hardan Abahre

An exhaustive literature search revealed that not much research has been done on factors causing problems in managing a construction project in a country under military occupation like Palestine. So, it is the main goal of this research is to identify these factors which could be used by the decision makers to select the appropriate project manager who bosses the suitable skills and competencies to deal with these problems. The study is a step toward determining means to improve the effectiveness of projects through identifying project manager competencies. It is important for Palestinian construction industry to progress in terms of project success; the problems that face the project managers must be determined and identified, in order to achieve the best results with less risk. A clear understanding of such problems helps the Palestinian construction industry of finding the suitable solutions to overcome these problems. A questionnaire survey was carried out to achieve the main aim of this research. The respondents were engineers have more than 3 years in the position of project manager in the Palestinian construction industry. The survey was based on factors drawn from findings of another researches in different countries, together with special factors identified as potentially affecting Palestine. The results identified many factors created problems; they were clustered in eight groups. These groups were arranged according to respondents in descending order as follows: the political situation of Palestine, lack of consultants` technical competencies, lack of resources, insufficient planning, team members uncommitted, conflicts between departments, breakdowns in communications, and changes in goals. As a result of this study one could conclude that managing a project in Palestine is as difficult as the complication of the political situation of the country. The project manager should have a complicated mixture of skills and competencies from dealing with Israeli occupation to dealing with stakeholders to lack of resources and unclear goals. The study has recommended to the Palestinian government to improve the regulations and laws to meet the impact of closure and segmentation of the Palestine.


Sign in / Sign up

Export Citation Format

Share Document