Linking complexity factors and project management approaches to performance: an embedded single case study of IT-enabled change projects in Australia

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Sylvia Odusanya ◽  
J. Jorge Ochoa ◽  
Nicholas Chileshe ◽  
Seungjun Ahn

PurposeThe purpose of this paper is to provide a holistic view of the link between the identification of complexity contributing factors, the application of project management approaches and their impacts on the performance of Information Technology (IT)-enabled change projects.Design/methodology/approachA qualitative approach of an embedded single-case design comprising three IT-enabled change projects delivered in Australia was used to explore the impact of complexity contributing factors and project management approaches on project performance measures. Semi-structured interviews were used as the main data collection method. Thematic analysis was used as the data analysis approach.FindingsThe results from the thematic analysis highlight that complexity contributing factors are related to two categories of complexity defined in this paper: technical uncertainties and uncertainty in goals and deliverables, both have an impact on the performance of IT-enabled change projects. It also highlights key project management approaches such as the use of an adaptive management approach and good communication as key to managing complexity. It also identifies a misalignment between stakeholder perception of success and the project management success measure for complex IT-enabled projects.Research limitations/implicationsThe research is based on data collected from Australian participants involved in three case studies. Additional data collection and reviews from practitioners in the field of project management could further refine and improve this research.Practical implicationsThe research facilitates the identification of specific complexity contributing factors at the early stage of a project to ensure that the appropriate project management approaches and success measures are used.Originality/valueThe paper contributes to rethinking the pathways towards improving project performance in the IT sector by expanding the identification of project complexity to understanding how complexity and the management approaches impact project performance.

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Rola Imad Fanousse ◽  
Dilupa Nakandala ◽  
Yi-Chen Lan

PurposeThis article provides the first systematic review of literature on effective organisational practices for reducing innovation project uncertainties to promote project performance. Innovation is the lifeblood of organisations, while simultaneously being one of the most challenging processes to manage. This systematic review seeks to examine best practice for reducing uncertainties and thus mitigate the high failure rates in innovation projects.Design/methodology/approachThis paper provides a systematic review of the literature on innovation project management and encourages an understanding of how intra-organisational collaboration reduces uncertainty and thus increases project performance.FindingsBased on an analysis of the systematic literature review findings, the impact of intra-organisational collaboration in reducing uncertainties in innovation projects is uncovered. Three types of project uncertainties were found to be dominant in the context of innovation project management: task, technological and market uncertainties. Five dimensions of intra-organisational collaboration are also identified, namely collaborative relationship, collaborative leadership, communicating and sharing information, trust formation and joint decision-making.Originality/valueThe authors situate five intra-organisational collaboration dimensions as key mechanisms that yield organisational learning as an outcome. On the other hand, they also uncovered that organisational learning is a key enabler in the relationship between intra-organisational collaboration and task, market and technological uncertainties reduction. Therefore, intra-organisational collaboration is identified as a critical practice in enhancing the performance of innovation projects. The study proposes a multi-dimensional conceptual model, providing a mechanism for furthering a research agenda for improving the performance of innovation projects.


2017 ◽  
Vol 24 (6) ◽  
pp. 1675-1689 ◽  
Author(s):  
Maqsood Sandhu ◽  
Asadullah Khan

Purpose The purpose of this paper is twofold: first, to investigate project management dimensions while constructing the Panama Canal from the end of ninetieth century to the start of twentieth century and then benchmarking against the Palm Diera Island at the lapse of a century. Second, to highlight issues of project management, specially the risk management with its economic, social and political domains at the construction site and in France and America. Design/methodology/approach The case study research method of qualitative research has been adopted when comparing two mega projects executed in different time and space. For the Panama Canal project documentation investigation was performed. However, a semi-structured interview data collection method was adopted for the Palm Diera Island project. A comparative study of two projects helps in deeper understanding of cross-project management dimensions. Findings The research reveals that the French team failed to complete the Panama Canal construction project due to inadequate planning, inappropriate design, lack of risk management, health and safety of the staff and non-availability of finances. However, the Americans successfully completed construction of the canal within budget and time and this was due to the support of change in the purpose of the canal construction adding to achieve its commercial objectives and at the same time strengthen its naval presence. American took its construction as a national objective than the individual enterprise as executed by the French team. Research limitations/implications Data collection for the Panama Canal was limited to only historical data available from the literature as documentary investigation. The researchers visited the canal to get in-depth understanding of the construction practices and the scale of construction. However, for the Palm Diera project, data collection was limited to three key personnel interviews. Practical implications The Americans were successful in completing the canal due to the US Government control on management and finances of the canal construction and lessons learned during the French construction period. The paper serves as a benchmark for project management dimension in two different regions in different times. The paper bears economic implications for the construction of the mega projects both in South America and the Middle East. Cost overrun construction of the Panama Canal during the French period influenced political spectrum in France resulting into the defeat of the government. During the American period of construction first time out of country visit by the sitting president of the USA reflects its economic and social importance. The valley of death was converted into the valley comfort during the American period resulting into social welfare of the workers. Completion of the canal by the Americans helped them secure operations of the Panama Canal for the next 100 years, contributing to its economic and naval strength. Social implications The paper reveals that safety and social implications for the work place in two different regions and at two different times. The impact of safe and improved working conditions at Palm Diera Island resulted into no injury or loss of life, however, during the Panama Canal construction more than 30,000 workers died affecting not only families of the respective workers but their nations as well. The impacts of both the projects on the society were also significant. The public opinion against the construction of the canal during the French period of construction was so significant that they had to abandon their construction equipment at the site. On the contrary, completion of construction of the Panama Canal during the French period helped secured political mileage for President Roosevelt and his party. Originality/value The paper benchmarks two different mega projects with different scope executed in two different regions at the lapse of a century. No such research work was found to have compared project management dimensions of two mega projects at the lapse of a century and in two different regions.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Cassandra R. Davis ◽  
Sarah R. Cannon ◽  
Sarah C. Fuller

PurposeThe purpose of this paper is to identify and describe the long-term impacts of hurricanes on schools and discuss approaches to improving recovery efforts.Design/methodology/approachInterviews with 20 school districts in Texas and North Carolina after Hurricanes Harvey (2017) and Matthew (2016). In total, 115 interviews were conducted with teachers, principals, district superintendents and representatives from state education agencies. Interview questions focused on the impact of storms and strategies for recovery.FindingsThe authors uncovered three long-term impacts of hurricanes on schools: (1) constrained instructional time, (2) increased social-emotional needs and (3) the need to support educators.Research limitations/implicationsThis paper focuses on two storms, in two states, in two successive years. Data collection occurred in Texas, one academic year after the storm. As compared to the North Carolina, data collection occurred almost two academic years after the storm.Practical implicationsThis paper illuminates strategies for stakeholders to implement and expedite hurricane recovery through; (1) updating curricula plans, (2) providing long-term counselors and (3) supporting educators in and out of school.Originality/valueTo date, very few studies have explored the ways in which schools face long-term impacts following a disaster. This paper provides insight to the challenges that prolong the impacts of disasters and impede recovery in schools. With hurricanes and related disasters continuing to affect schooling communities, more research is needed to identify the best ways to support schools, months to years after an event.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Adnan Alghail ◽  
Liu Yao ◽  
Mohammed Abbas ◽  
Yahia Baashar

Purpose The reasons behind the project management failure of higher education institutions (HEIs) have been researched for the past few years. One of the reasons is the lack of tools to integrate their knowledge process capabilities (KPC) with their project management (PM) to measure maturity by assessing these capabilities. Various project management maturity (PMM) models exist. Yet, there is a limited number of empirical studies that support the four integrations of KPC and PMM. Therefore, this study aims to propose a new heretical model, namely, KPC-knowledge management (KM) and evaluates a research model that includes the four KPC as an antecedent to PMM. Design/methodology/approach The suggested research model is assessed by using partial least squares structural equation modeling. Furthermore, the study's hypotheses were examined based on a sample of 352 respondents from the project management departments in 10 public universities in Yemen. Findings Analysis revealed that the derived PMM status could be benchmarked with the project management maturity model. Also, the study found that integrating the KPC into PM enables the institutions to perform critical tasks and value chain activities and enhance the PM maturity level as well. In contrast, if one of the capabilities does not positively impact PMM, it affects the maturity level of the entire project. Research limitations/implications The findings are obtained concerning data collected from public universities and represent the Yemeni context, limiting the generalization on a different geographical area. Also, this proposed model can be evaluated in a practical way like conducting a focus group, a set of interviews with specialists, a case study or action research. The qualitative research will help academics to validate our proposal for future research purposes. Practical implications The proposed approach may be adapted to the characteristics of organizations involved in projects as external performers (project-based organizations) and not just the HEIs projects. This study provides managers and policymakers with insights into assessing PMM and improving their organizational effectiveness when deciding which KPCs to focus on in the future. Social implications This study contributes to the current PM awareness in Yemen and facilitates its success using the knowledge processes capabilities in Yemen's HEIs. It encourages organizations to take this opportunity to revive the projects and achieve a maximum level of maturity. Originality/value This study provides new insights into two domains through the link between knowledge management and PM. To the best of the authors' knowledge, this paper is among the first to empirically study the impact of the four KPC toward PMM. It enriches the theoretical perspective of PM. Also, it contributes to the literature on the success factor of KPC, which can be considered to improve organizational performance.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Aqsa Ameer ◽  
Farah Naz ◽  
Bushra Gul Taj ◽  
Iqra Ameer

Purpose The purpose of this study is to determine the effect of conscientiousness and extraversion personality traits on project success. The relationship is mediated by affective professional commitment, whilst the relationship between personality traits and project success is moderated by organizational project management maturity. Design/methodology/approach The deductive approach is used to achieve the objectives of this study. Data were collected through a purposive sampling technique from 250 respondents with the help of questionnaires from information technology sectors. The structural equation modelling (SEM) in partial least squares-SEM and SPSS is used to analyse the data and to examine the hypothesis. Findings The outcomes demonstrate the partial mediating impact of affective professional commitment between the relationship of conscientiousness and extraversion personalities with project success. Additionally, it proves the moderating effects of project management maturity between the relationship of conscientiousness and extraversion personalities with project success. Practical implications This study reflects that employee personality appears to be a reliable indicator of how an employee is faithful to his profession. This faithfulness or duty decides the employee’s execution in terms of offering a successful project. Thus, achieving employee commitment needs to be done by completing the project successfully by the organizations in the presence of project management maturity systems. Originality/value It is the first study of its kind to provide experimental proof of the impact of a manager’s personality traits on project success in the presence of affective professional commitment (mediator) and organizational project management maturity (moderator).


IMP Journal ◽  
2018 ◽  
Vol 12 (3) ◽  
pp. 427-443
Author(s):  
Enrico Baraldi ◽  
Francesco Ciabuschi ◽  
Olof Lindahl ◽  
Andrea Perna ◽  
Gian Luca Gregori

Purpose The purpose of this paper is to explore two specific areas pertaining to industrial networks and international business (IB). First, the authors look at how business relationships influence the internationalization in time, from the establishment of the first subsidiary in a foreign market to the following ones, and in space, that is, across different markets. Second, the authors investigate how an increasing external network dependence of subsidiaries in their internationalization may cause a detachment of a subsidiary from the mother company as its knowledge becomes insufficient to guide a subsidiary’s internationalization. Design/methodology/approach This paper utilizes an exploratory, longitudinal, single-case study of Loccioni – a manufacturer of measuring and automatic control systems for industrial customers – to illustrate the specific dynamics of the influences of industrial networks on the internationalization of subsidiaries. Findings The case study helps to elucidate the roles, entailing also free will and own initiative, of small suppliers’ subsidiaries which operate inside several global factories, and how “surfing” on many different global factories, by means of several local subsidiaries, actually supports these suppliers’ own international developments. This notion adds to our understanding of the global factory phenomenon a supplier focus that stresses how the role of suppliers is not merely that of being passive recipients of activities and directions from a focal orchestrating firm, but can also be that of initiative-takers themselves. Originality/value The paper contributes to the IMP tradition by providing a multi-layered and geographically more fine-grained view of the network embedding companies that operate on internationalized markets. This paper thereby sheds light on a less investigated area of research within the IMP tradition: the link between internationalization in different countries and the interconnectedness between the industrial networks spanning these countries. At the same time, this paper contributes to IB theories by showing how a late-internationalizing SME can enter highly international markets by “plugging into” several established “Global Factories” as a way to exploit further opportunities for international expansion.


Innovar ◽  
2015 ◽  
Vol 25 (56) ◽  
pp. 53-67 ◽  
Author(s):  
Maricela I. Montes-Guerra ◽  
Aida R. De-Miguel ◽  
M. Amaya Pérez-Ezcurdia ◽  
Faustino N. Gimena ◽  
H. Mauricio Díez-Silva

This article analyzes the adoption of project management practices in development cooperation NGOs and their influence on project performance. This paper illustrates the impact in the implementation of methodologies, techniques and tools on outcomes, measured by success criteria of several projects recently implemented. Information from the project managers of the organizations was collected, and complemented by a literature review. We analyzed the correlation among the variables that determine the adoption of a project, and the criteria that determine its success. The positive effect of project management adoption in the performance of cooperation projects is demonstrated, in spite of the low use of methodologies, techniques and tools within the sector. The article shows the importance of project management in cooperation and aid projects, with the purpose of increasing researchers' awareness about the field as applicable knowledge and about the benefits of its use in the sector. The paper shows that project management can improve project efficiency and accountability in other sectors.


2019 ◽  
Vol 3 (1) ◽  
pp. 2-28 ◽  
Author(s):  
Garrett Lane Cohee ◽  
Jeff Barrows ◽  
Rob Handfield

Purpose Each year, the US defense industry outsources nearly $400 bn of domestic goods and services through competitive bids. These procurement activities are quite often complex and specialized in nature because of a highly regulated federal acquisition contracting environment. Ongoing calls to improve supplier management and drive innovation in the defense industry offers an opportunity to adopt Early Supplier Integration (ESI) initiatives that have proven successful in the private sector. This paper identifies critical ESI activities and acquisition practices that the defense industry should adopt to ensure enhanced effectiveness in new product development. Design/methodology/approach Leveraging a conceptual ESI model derived from the research, an in-depth case study of 12 product development projects from a major defense contractor was performed. In the context of project performance, critical ESI activities and moderating effects were assessed. Findings Three key ESI activities have the greatest impact on aggregate project performance: system design involvement, design adjustment opportunities and design for manufacturability/assembly/testability involvement. Use of formal supplier agreements also significantly impacts project performance during the development phase. In addition, project complexity and product team maturity were identified as environment moderators; higher complexity projects tended to negatively moderate the impact of ESI upon performance, and higher team maturity levels tended to positively moderate the impact of ESI upon performance. Originality/value The results provide a sound framework for empirical validation through future quantitative studies and defense industry analyses. In addition, insights and recommendations for interpretation and adaptation of federal acquisition regulations to allow increased utilization of ESI within the defense industry are substantiated.


2019 ◽  
Vol 26 (2) ◽  
pp. 285-306 ◽  
Author(s):  
Torbjörn Ljungkvist ◽  
Börje Boers ◽  
Joachim Samuelsson

Purpose The purpose of this paper is to understand the development of the five dimensions of entrepreneurial orientation (EO) over time by taking a founder’s perspective. Design/methodology/approach The paper draws on an in-depth single-case study. It combines semi-structured interviews in the company with archival data, such as annual reports, press clips and interviews in business magazines. Findings The results indicate that the EO dimensions change from being personalized and directly solution-oriented to being intangible value-creation-oriented. Originality/value By suggesting ownership-based EO configurations, this study contributes insights into how different ownership forms propel EO. These configurations – that is, personal, administrative based and intangible focused – show the impact of the EO dimensions and provide a systematic and theoretical understanding of EO change over time.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Haya Aldaghlas ◽  
Felix Kin Peng Hui ◽  
Colin Fraser Duffield

PurposeThe initiation phase of capital projects is critical as this is where the highest number of options exist for modifying the project with minimal expenditure. Government and large organisations frequently involved in major capital projects have extensive procedures for this phase, yet organisations having an operational focus (like major container terminal stevedores), that only occasionally undertake capital projects face the dilemma of the trade-off between project planning and the management of operations. This research reported in this paper investigated the impact of industry operational considerations on the initiation of capital projects.Design/methodology/approachIn addition to an extensive literature review, a living research investigation of real projects initiated by a stevedoring company operating in Australia has been observed; the primary author of this paper spent six months as a participant/observer and witnessed the initiation of 12 capital projects. The collected data was qualitatively analysed using a four-step coding method.FindingsThe findings confirm that project initiation is a challenge for organisations who only spasmodically undertake capital projects and available project management frameworks do not necessarily consider the impact of such an organisation's culture. Issues identified that may have a negative impact on the initiation phase include lack of workplace trust, high individualism, ineffective interdepartmental communication, lack of resources and engineering and safety complexity.Originality/valueThe study investigated an underexplored industry within the context of project initiation, using the Australian stevedoring as a case study. This initial investigation suggests that a tailored project management framework is needed for the initiation phase of projects to reflect the unique nature of the stevedoring industry and by inference other industries that have a strong operational focus.