scholarly journals Role of Crisis Management in Construction Projects

2018 ◽  
Vol 7 (2.12) ◽  
pp. 451 ◽  
Author(s):  
Rajprasad J ◽  
Thamilarasu V ◽  
Mageshwari N

Crisis management is the method which is formed by the organization to overcome the crisis. Crisis management is important, which helps in the completion of the construction project on time. It gives a theory of how to manage the crisis management with the factors which leads to crisis in the construction project. However, only when the work flow continues without any interruption even during crisis that crisis management method is effective. For forming an effective crisis management technique, the probability of crisis in construction projects must be identified as each factor have their unique effects. Depending upon major factors like technical, labour, organizational, material, time, equipment, communication, financial and other factors which are responsible for the cause of crisis in projects are considered. The research is carried out through questionnaire survey analysis made among the various project managers from different construction project site. 

2021 ◽  
Vol 56 (3) ◽  
pp. 473-484
Author(s):  
Zulkifli Lubis

The biggest threat that results in the project not being successful is failure to build a stakeholder project. Based on research on construction projects in developing countries, the lack of communication among workers due to cultural uniformity and the uniqueness of their respective regions can become work constraints that can affect implementation performance and productivity, namely, there is a 69.61% decrease in time performance. The main objective of this research is to analyze the role of communication management in improving the performance of construction project managers in developing countries, particularly the role of construction managers in implementing a construction project. This research uses a qualitative approach and a case study method. Sampling using purposive sampling. Forum Group Discussion to see how the opinions of construction project managers in Indonesia view the importance of communication management in the success of construction projects. The study results explain that the need for Public Relations Infrastructure management plays a role in ensuring various policies and communication to the public. This is a reflection of the effective function of public relations in the implementation of infrastructure development. In carrying out the construction, the construction project manager must pay attention to communication dynamics to support the success of infrastructure development projects. Contractors and other parties involved in infrastructure development must raise awareness of the essence of effective communication in fostering trust in the public concerned with infrastructure development.


2020 ◽  
Vol 38 (7A) ◽  
pp. 1069-1076
Author(s):  
Layth T. Ali ◽  
Raid S. Abid Ali ◽  
Zeyad S. M. Khaled

Cost overrun in construction projects is a common phenomenon in Iraq. This might occur due to diversity of factors. This study aims to identify the factors influencing construction projects cost that are potentially controllable by main contractors. A field study through a questionnaire survey was directed to a sample of related Iraqi professional engineers from general contracting companies at both public and private sectors. Their opinions on the impact and frequency of each factor were investigated. The questionnaire offered (59) factors classified in (8) categories namely; legislations, financial and economic, design, contractual, site management, material, labor and equipment. The factors were ranked according to the highest Relative Importance Index (RII). The study revealed (10) major factors that are potentially controllable by main contractors namely; labor productivity, sub-contractors and suppliers performance, equipment productivity, site organization and distribution of equipment, experience and training of project managers, scheduling and control techniques, planning for materials supply, planning for equipment supply, materials delivery and planning for skilled labor recruitment. Recommendations to aid contractors and owners in early identification of these factors are also included in this study.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Masoud Zavari ◽  
Mohammad Reza Afshar

PurposeIn the construction industry, site managers are responsible for the day-to-day on-site running of a project. Site managers are required not only to ensure that work is done safely, on time, within budget and to the right quality standards, but also to manage any delays or problems encountered on-site during a construction project. Thus, a site manager has a significant position in the success of a construction project. However, there is a lack of studies considering the role of the leadership style of a site manager in construction project success. In this study, not only the effect of the transformational leadership (TL) style of site managers on the success of construction projects is assessed, but also the mediating role of team-building (TB) and team innovation between TL and project success is studied.Design/methodology/approachThe proposed hypotheses are tested by comparing the performance criteria of construction projects with the TL style of site managers. The success criteria of the projects are examined using project documents and client opinions, and the TL of site managers, TB aspects and team innovation in projects are assessed by asking from their subordinates. The Pearson correlation coefficient is employed to investigate the relation between every two variables.FindingsThe results illustrate that the TL of a site manager is directly related to project success; thus, the findings would confirm the importance of selecting appropriate site managers for construction projects. Moreover, while there is a mediating role of TB between TL and construction project success, team innovation does not have a mediating impact in design-bid-build (DBB) construction projects.Originality/valueAs there is a lack of studies assessing the TL effects on the success of construction projects and the significant role of site managers, this study is one of the first researches that tested these impacts and evaluated the mediating role of TB and team innovation between TL and project performance.


2017 ◽  
Vol 5 (1) ◽  
Author(s):  
I Gde Eka Dharsika ◽  
IN Budiartha ◽  
I W Yansen

Abstract: Problems in construction projects caused by the extension of working time and an increase in labor costs. A limited ability of project management contribute to the decline in the quality of project work. The quality of project manager has an important role to smooth a construction project. Dedication in this profession requires project managers to carry out the work going according to plan. Analyzing the quality of the project manager for the implementation of construction projectsis one wayto measure the quality of a project. It needs  a right measurements way to providean accurate assessment of qualified and reliable project managers. This study aimed to obtain and analyze the factors that affect the quality of the project manager and its to construction projects.This used a sample of 45 respondents from several construction projects in the area of Badung and Denpasar during the period 2007-2012. The method used in this study is the method of multiple linear regression analysis by testing for the F-test and t-test. The results found 8 dominant factor that has a value eigen values??> 1. Sequentially, the factors that have been named are experience 41.63%,  education 9.278%, knowledge 7.240%, ability 5.088%, character 4.047%, network 3.843%, relationship communication 3.550%, confidence 3.357%. Influence the quality of the project manager on the performance fee of 51.9%, against 43.1% for quality performance, on-time performance, with a value of 57.9%. The results of this study prove that the powerful influence between the quality of the construction project manager to the implementation of construction projects.


2021 ◽  
Vol 13 (19) ◽  
pp. 11035
Author(s):  
Hossam H. Mohamed ◽  
Ahmed H. Ibrahim ◽  
Asmaa A. Soliman

One of the most vital construction project aspects is to complete a project in minimum time restricted to the time–cost trade-off. Overlapping activities’ planning and their impact on the project under limited resource constraints should be considered. This study aims to develop a model for optimizing the project schedule and cost regarding overlap activities and their impacts. This study reviews previous studies on changes in past activities likely to produce additional reworking of subsequent activities. In addition, an AHP model is developed to assess the reworking time of subsequent activities based on possible changes in previous activities. In addition, five realistic construction projects are applied. Finally, an optimizing model is developed for optimizing project time and cost using overlapping techniques by using the Java program. The results indicate that the proposed model can be used by project managers easily for solving time and cost optimization problems. In addition, it can be updated to continuously improve its functionality. Finally, it can be updated later to support AI for finding better solutions.


2020 ◽  
Vol 6 (4) ◽  
pp. 1365-1375
Author(s):  
Shahid Iqbal ◽  
Nabeel Ehtisham ◽  
Syed Farqaleet K. Bukhari ◽  
Shahid Mahmood

Project Risk management is known as an important workout for the achievement of desired objectives for the construction projects. Success in construction project is quantified by attaining its enactment in terms of project quality, project cost, project time, project safety. Construction projects in Pakistan, typically in the whole world have a high risk of being pointedly late and over budget. However, a bit of schedule and cost related risks are unavoidable in any construction project around the world. It was found out that the engineers were generally nominated earlier the design phase of any project. Due to this reason maximum projects did not get the advantage from SMEs at the planning stage of the project. This study also supports that project managers who are engineers be involved in construction projects site selection, in preliminary budget and schedule development by using good Engineering Management Practices.


Author(s):  
Mohd Affendi Ahmad Pozin ◽  
Mohd Nasrun Mohd Nawi ◽  
Md Azree Othuman Mydin ◽  
Salman Riazi Mehdi Riazi ◽  
Ayub Ilfandy Imran

In this article, we discuss about WhatsApp application practise around project managers in managing IBS construction projects. The WhatsApp application offera great advantages, especially in collecting, managing information and data in a timely manner. Previous study highlighted effective communication become as a bridge between practitioners to share a knowledge, information and integration. Unfortunately, there is still a lack of empirical studies on how efficiencies of WhatsApp application overcome the communication barriers while managing distributed project teams on construction project. Thus this study seeks to explore communication performance perceived through WhatsApp application. The semi-structured interview methodology was used to gain in-depth knowledge from several project managers who have experiences in managing construction projects virtually through WhatsApp application. The finding from this study revealed that WhatsApp application has become an effective communication channel to overcome the barriers of communication while managing distributed teams and allowing timely information sharing.


2020 ◽  
Vol 12 (24) ◽  
pp. 10376
Author(s):  
Sławomir Wawak ◽  
Žanesa Ljevo ◽  
Mladen Vukomanović

Project management frameworks describe the preferred approaches to project quality management, as well as applicable methods and tools. Despite this, quality problems in the construction project are still widespread. This study aimed to identify crucial quality-related factors in construction project management and find relations between them, to help researchers and project managers better respond to quality issues. A systematic literature review (SLR) was used to identify previous studies on quality-related factors. Literature review and further quantitative analysis revealed that quality-related factors are related to three categories: Quality of project process, quality of organisational processes, and quality of results (products), which together create the quality of the whole construction project. The results highlight quality-related factors (14 related to the quality of processes, 6 to quality of an organisation, and 13 to quality of products) that should be taken into account in further research, as well as planning and executing construction projects. Their inclusion at the planning stage should help project managers, sponsors, and steering committees avoid or minimise quality-related problems. Moreover, this study sheds an interesting light on quality. We found that the quality of processes and quality of an organisation has precedence over the final product quality. Based on the results of the study, structural equation modelling (SEM) was used to create a null model that will be the starting point for further research in the construction enterprises.


2019 ◽  
Vol 12 (4) ◽  
pp. 938-960
Author(s):  
Abdullah A. Khawam ◽  
Nancy S. Bostain

Purpose The purpose of this paper is to address the primary research question, which is what is the relationship between the project manager’s (PM) possession of the Project Management Professional (PMP) certification and the level of the safety culture present in the construction project the PM manages. Design/methodology/approach The research was based on a survey of a purposive sample, 109 engineers and first-line supervisors worked in 23 construction projects of which ten were led by PMP-certified PMs and 13 were led by PMs lacking PMP certification. Each PM completed a demographic questionnaire for the predictor variables of PMP certification controlled for age and experience. To assess the criterion variable of safety culture total score, engineers and first-line supervisors working in the same project completed the questionnaire of safety culture values and practices. Findings Results of this study indicated the level of safety culture was significantly different, and improved, for engineers and first-line supervisors who work under PMs with PMP certification compared to the level of safety culture in projects managed by PMs with no PMP certification. Although alignment of safety culture perceptions among different levels in the organization helps to achieve a positive safety culture, the role of the PM in transferring, implementing and maintaining the safety culture in the construction project is fundamental, particularly in small-to-medium sized enterprises (SMEs). Originality/value This study addressed the role of the PMs managerial skills in the safety performance of Saudi Arabian SMEs. The principal finding was that PMs with managerial skills perform better regarding safety performance in SME construction projects than PMs lacking managerial skills. The primary recommendation is that leaders in construction projects must carefully evaluate engineers’ managerial skills before hiring the individuals as PMs. A PM’s promotion model developed in this study provides a suitable framework and business process component for construction leaders seeking to maintain safety performance successfully.


2019 ◽  
Vol 276 ◽  
pp. 02007
Author(s):  
Kartika Puspa Negara ◽  
Fiona Lamari ◽  
Connie Susilawati ◽  
Bambang Trigunarsyah

The influence of active client involvement towards project construction success is gaining recognition in the last few decades. The growing concern on the client involvement has drifted the perception towards client away from the passive role into contributor of project success. During client involvement in the construction project, a representative from client or client project manager (CPM) should be complemented with certain competencies in order to succeed in commissioning construction projects. Evidence shows that some public construction projects in Indonesia failed due to the lack of competency of client project managers. Whilst most of the previous studies concern on the competency of general project managers, this paper specifically investigates competency of project manager from client side who works as a civil servant, and commissioning public construction sectors. This paper aims to identify the important competencies required by CPM in construction projects in Indonesia and examine current Indonesian CPM competency standard. Relative Importance Index (RII) was employed to assess the important level of competencies. The findings will enrich understanding on client project manager competency and become a basis to undergird further empirical research in client project manager development areas.